摘要:
Railroad tie plates secured collectively by spikeless fasteners to a tie with railroad spikes securing the rails to the ties and related methodology are disclosed wherein two-part fasteners are used in respect to sets of aligned tie and tie plate apertures such that the two fastener parts are joined together against inadvertent separation within each tie aperture at a connection or union site, which includes but is not limited to force fit unions and threaded unions, and spikes are driven into the ties through other tie plate apertures.
摘要:
Technology is disclosed by which loosened railroad spikes may be re-secured in pre-existing spike cavities in reconditioned or repaired railroad ties, i.e. novel, facile, on-site, non-complex, miniaturized pre-packaged, clean, non-labor intensive, non-equipment intensive ways of bonding or polymerizing pre-existing previously used railroad spike cavities in the field for again receiving railroad spikes in a secure manner, so as to repair damaged spike cavity walls and prevent moisture infiltration. Frangibly encapsulated bonding agent or polymerizable resin placed in pre-existing spike cavities is preferred.
摘要:
Apparatus and methodology are disclosed pertaining to selecting from a stockpile of used and discarded ties those which can be restored for a second use, removing accumulated scale from the selected used ties, redimensioning the selected ties to a usable smaller size, filling and sealing tie end cracks with a suitable filler, transversely compressing the ties to substantially close the adhesive-filled cracks, applying a permanent fastener to retain the compressed state of the closed and sealed tie cracks and externally treating the fastened ties with pesticide and anti-rotting composition or compositions.
摘要:
Methods and apparatus for the manufacturing of prestressed reinforced concrete railroad ties and the like in which the apparatus consists of an elongated spine or compression member which has no foundation but rather is independent of the supporting surface upon which it rests. In one version of the apparatus two bridge members confront the opposite ends of the spine and permanent tension resisting members pass beneath the spine from end to end of the spine and are attached to the lower ends of the bridge members. In another version two structural members are embedded in the concrete of the spine and protrude to provide terminal members.
摘要:
Methods are disclosed by which wooden railroad ties are pre-plated prior to use in constructing and/or repairing railroad lines. Methodology disclosed comprises placing two plates on top of each of a succession of wooden ties, temporarily positioning disclosed one of the two plates on each tie with a distance or spacer template temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through the selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head is about 1½ inches above the plate.
摘要:
Apparatus and methodology are disclosed pertaining to selecting from a stockpile of used and discarded ties those which can be restored for a second use, removing accumulated scale from the selected used ties, redimensioning the selected ties to a usable smaller size, filling and sealing tie end cracks with a suitable filler, transversely compressing the ties to substantially close the adhesive-filled cracks, applying a permanent fastener to retain the compressed state of the closed and sealed tie cracks and externally treating the fastened ties with pesticide and anti-rotting composition or compositions.
摘要:
Railroad tie plates secured collectively by spikeless fasteners to a tie with railroad spikes securing the rails to the ties and related methodology are disclosed wherein two-part fasteners are used in respect to sets of aligned tie and tie plate apertures such that the two fastener parts are joined together against inadvertent separation within each tie aperture at a connection or union site, which includes but is not limited to force fit unions and threaded unions, and spikes are driven into the ties through other tie plate apertures. Discarded ties rehabilitated as composite railroad ties are also disclosed.
摘要:
Spikeless plated and pre-plated railroad ties, assemblies, railroad tracks and related methodology are disclosed wherein two-part fasteners are used in respect to sets of aligned tie and tie plate apertures such that the two fastener parts are joined together against inadvertent separation within each tie aperture at a connection or union site, which includes but is not limited to force fit unions and threaded unions.
摘要:
Railroad tie plates secured collectively by spikeless fasteners to a tie with railroad spikes securing the rails to the ties and related methodology are disclosed wherein two-part fasteners are used in respect to sets of aligned tie and tie plate apertures such that the two fastener parts are joined together against inadvertent separation within each tie aperture at a connection or union site, which includes but is not limited to force fit unions and threaded unions, and spikes are driven into the ties through other tie plate apertures. Discarded ties rehabilitated as composite railroad ties are also disclosed.