-
公开(公告)号:US09472944B2
公开(公告)日:2016-10-18
申请号:US14846876
申请日:2015-09-07
Applicant: Emerson Climate Technologies, Inc.
Inventor: Nagaraj Jayanth , George Ramayya
CPC classification number: H02H7/09 , F25B49/022 , F25B2500/19 , F25B2600/0251 , F25B2700/13 , F25B2700/151 , F25B2700/2115 , G01R19/10 , G01R19/16538 , G01R31/343 , H02H7/08 , H02H7/20 , H02P29/0241 , Y10T307/406 , Y10T307/549 , Y10T307/724 , Y10T307/729 , Y10T307/826 , Y10T307/832
Abstract: A method of operating a refrigeration system that receives power from an electrical grid includes operating at least one component of the refrigeration system in a first state. The method includes detecting a fault event of the electrical grid in response to a concurrent increase in amount of current drawn by the component and decrease in voltage of power received by the component. The method includes, in response to detecting the fault event, switching the component from the first state to a second state, wherein the component consumes less power in the second state than in the first state. The method includes determining a first delay period according to a random process. The method includes identifying a conclusion of the fault event. The method includes, in response to the conclusion of the fault event, waiting for the first delay period before switching the component back to the first state.
Abstract translation: 操作从电网接收功率的制冷系统的方法包括在第一状态下操作制冷系统的至少一个部件。 该方法包括响应于由该部件吸收的电流量的同时增加以及由该部件接收的功率的降低而检测电网的故障事件。 该方法包括响应于检测到故障事件,将组件从第一状态切换到第二状态,其中该组件在第二状态中消耗比在第一状态中更少的功率。 该方法包括根据随机过程确定第一延迟周期。 该方法包括识别故障事件的结论。 响应于故障事件的结论,该方法包括在将组件切换回第一状态之前等待第一延迟时段。
-
公开(公告)号:US10418800B2
公开(公告)日:2019-09-17
申请号:US15948864
申请日:2018-04-09
Applicant: Emerson Climate Technologies, Inc.
Inventor: Nagaraj Jayanth , George Ramayya
IPC: H02P27/04 , H02H7/09 , G01R19/10 , G01R19/165 , G01R31/34 , H02H7/20 , F25B49/02 , H02P29/024 , H02H7/08
Abstract: A method for monitoring a compressor includes measuring a power factor of a motor of a compressor. The method includes selectively detecting an occurrence of a fault event of an electrical grid based on the power factor. The method includes, in response to detecting that the fault event has occurred, switching the compressor from a first state to a second state. The compressor consumes less power in the second state than in the first state. The method includes identifying an apparent conclusion of the fault event. The method includes, in response to the apparent conclusion of the fault event, waiting for a first delay period before switching the motor of the compressor back to the first state.
-
3.
公开(公告)号:US20160190799A1
公开(公告)日:2016-06-30
申请号:US14846876
申请日:2015-09-07
Applicant: Emerson Climate Technologies, Inc.
Inventor: Nagaraj Jayanth , George Ramayya
CPC classification number: H02H7/09 , F25B49/022 , F25B2500/19 , F25B2600/0251 , F25B2700/13 , F25B2700/151 , F25B2700/2115 , G01R19/10 , G01R19/16538 , G01R31/343 , H02H7/08 , H02H7/20 , H02P29/0241 , Y10T307/406 , Y10T307/549 , Y10T307/724 , Y10T307/729 , Y10T307/826 , Y10T307/832
Abstract: A system includes a control module and a monitor module. The control module selectively operates a component of the system in an ON state. The system receives power from an electrical grid. The monitor module selectively detects a fault event of the electrical grid in response to (i) an amount of current drawn by the component or (ii) a voltage of power received by the component. In response to detecting the fault event, the control module switches the component from the ON state to a second state, determines a first delay period according to a random process, identifies an apparent conclusion of the fault event, and in response to the apparent conclusion of the fault, waits for the first delay period before switching the component back to the ON state. The component consumes less power in the second state than in the ON state.
Abstract translation: 系统包括控制模块和监控模块。 控制模块选择性地将系统的组件操作为ON状态。 系统从电网接收电力。 响应于(i)由该部件抽取的电流量或(ii)由该部件接收的功率电压,监控模块有选择地检测电网的故障事件。 响应于检测到故障事件,控制模块将组件从接通状态切换到第二状态,根据随机过程确定第一延迟时间,识别故障事件的明显结论,并响应于明显的结论 的故障,等待第一个延迟时间,然后再将组件切换回ON状态。 该组件在第二状态下比在ON状态下消耗更少的功率。
-
公开(公告)号:US09941688B2
公开(公告)日:2018-04-10
申请号:US15295633
申请日:2016-10-17
Applicant: Emerson Climate Technologies, Inc.
Inventor: Nagaraj Jayanth , George Ramayya
IPC: H02H7/09 , G01R19/10 , G01R19/165 , G01R31/34 , H02H7/20 , F25B49/02 , H02P29/024 , H02H7/08
CPC classification number: H02H7/09 , F25B49/022 , F25B2500/19 , F25B2600/0251 , F25B2700/13 , F25B2700/151 , F25B2700/2115 , G01R19/10 , G01R19/16538 , G01R31/343 , H02H7/08 , H02H7/20 , H02P29/0241 , Y10T307/406 , Y10T307/549 , Y10T307/724 , Y10T307/729 , Y10T307/826 , Y10T307/832
Abstract: A method of operating a refrigeration system that receives power from an electrical grid includes selectively operating at least one component of the refrigeration system in a first state. The method includes selectively detecting a fault event of the electrical grid in response to a concurrent (i) increase in amount of current drawn by the component and (ii) decrease in voltage of power received by the component. The method includes, in response to detecting the fault event, switching the component from the first state to a second state. The component consumes less power in the second state than in the first state. The method includes determining a first delay period. The method includes identifying a conclusion of the fault event. The method includes, in response to the conclusion of the fault event, waiting for the first delay period before switching the component back to the first state.
-
公开(公告)号:US09130370B2
公开(公告)日:2015-09-08
申请号:US14101155
申请日:2013-12-09
Applicant: Emerson Climate Technologies, Inc.
Inventor: Nagaraj Jayanth , George Ramayya
IPC: H02H7/08 , H02H7/20 , G01R19/10 , G01R19/165 , G01R31/34
CPC classification number: H02H7/09 , F25B49/022 , F25B2500/19 , F25B2600/0251 , F25B2700/13 , F25B2700/151 , F25B2700/2115 , G01R19/10 , G01R19/16538 , G01R31/343 , H02H7/08 , H02H7/20 , H02P29/0241 , Y10T307/406 , Y10T307/549 , Y10T307/724 , Y10T307/729 , Y10T307/826 , Y10T307/832
Abstract: A system includes a control module and a monitor module. The control module selectively operates a component of the system in an ON state. The system receives power from an electrical grid. The monitor module selectively detects a fault event of the electrical grid in response to (i) an amount of current drawn by the component or (ii) a voltage of power received by the component. In response to detecting the fault event, the control module switches the component from the ON state to a second state, determines a first delay period according to a random process, identifies an apparent conclusion of the fault event, and in response to the apparent conclusion of the fault, waits for the first delay period before switching the component back to the ON state. The component consumes less power in the second state than in the ON state.
Abstract translation: 系统包括控制模块和监控模块。 控制模块选择性地将系统的组件操作为ON状态。 系统从电网接收电力。 响应于(i)由该部件抽取的电流量或(ii)由该部件接收的功率电压,监控模块有选择地检测电网的故障事件。 响应于检测到故障事件,控制模块将组件从接通状态切换到第二状态,根据随机过程确定第一延迟时间,识别故障事件的明显结论,并响应于明显的结论 的故障,等待第一个延迟时间,然后再将组件切换回ON状态。 该组件在第二状态下比在ON状态下消耗更少的功率。
-
-
-
-