-
公开(公告)号:US09849617B2
公开(公告)日:2017-12-26
申请号:US15401760
申请日:2017-01-09
Applicant: Gregory Arther Huber
Inventor: Gregory Arther Huber
CPC classification number: B29C33/303 , B29C33/0038 , B29C33/306 , B29C33/3842 , B29C33/405 , B29C45/02 , B29C45/14655 , B29K2821/00 , B29K2905/12 , B29L2031/34
Abstract: Top and bottom ferrous carrier plates have a plurality of pairs of mating insert receptacles in full carrier plates and interlocked partial carrier plates. Pairs of mating nonferrous pre-molded inserts with mating mold cavities insert with a three axis floating fit into mating insert receptacles. Insert contact faces each comprising a flat surface portion having a plurality of mating alignment elements adapted for automatic precision alignment of the mating pair of pre-molded inserts. An injector structure comprising a plunger and pot bushing structure communicates with a pot on each top pre-molded insert. The bushing structure has a solidifying cavity and stripping structure so that retraction of the plunger separates the solidified material from the plunger face for automatic removal of surplus injected material after each molding cycle.
-
公开(公告)号:US20170113387A1
公开(公告)日:2017-04-27
申请号:US15401760
申请日:2017-01-09
Applicant: Gregory Arther Huber
Inventor: Gregory Arther Huber
CPC classification number: B29C33/303 , B29C33/0038 , B29C33/306 , B29C33/3842 , B29C33/405 , B29C45/02 , B29C45/14655 , B29K2821/00 , B29K2905/12 , B29L2031/34
Abstract: Top and bottom ferrous carrier plates have a plurality of pairs of mating insert receptacles in full carrier plates and interlocked partial carrier plates. Pairs of mating nonferrous pre-molded inserts with mating mold cavities insert with a three axis floating fit into mating insert receptacles. Insert contact faces each comprising a flat surface portion having a plurality of mating alignment elements adapted for automatic precision alignment of the mating pair of pre-molded inserts. An injector structure comprising a plunger and pot bushing structure communicates with a pot on each top pre-molded insert. The bushing structure has a solidifying cavity and stripping structure so that retraction of the plunger separates the solidified material from the plunger face for automatic removal of surplus injected material after each molding cycle.
-
公开(公告)号:US09539743B2
公开(公告)日:2017-01-10
申请号:US14754396
申请日:2015-06-29
Applicant: Gregory Arther Huber
Inventor: Gregory Arther Huber
IPC: B29C33/30 , H01L21/56 , B29C33/40 , B29L31/34 , B29C45/14 , B29C33/00 , B29C33/38 , B29K705/00 , B29C45/02
CPC classification number: B29C33/405 , B29C33/0038 , B29C33/303 , B29C33/306 , B29C33/3842 , B29C45/02 , B29C45/14655 , B29K2705/00 , B29K2821/00 , B29L2031/34
Abstract: Top and bottom ferrous carrier plates have a plurality of pairs of mating window cavities. Pairs of mating nonferrous pre-molded inserts with mating mold cavities snap into mating window cavities with a rubberized retainer ring therebetween to create floating mating pre-molded insert molds in multiple material carrier plate assemblies. Liquefied material is dispensed through pot bushings and plungers in each top pre-molded insert. The liquefied material flows though gate openings located in each insert top surface filling the mold cavities. The liquefied material then solidifies to its permanent shape in the mold cavities.
Abstract translation: 顶部和底部的铁质载体板具有多对配合窗口腔。 具有配合模腔的配对有色预成型插入件对成对配合窗口腔,其间具有橡胶保持环,以在多个材料承载板组件中产生浮动配合预模制插入模具。 液体材料通过每个顶部预模制插入件中的罐衬套和柱塞分配。 液化材料通过位于填充模腔的每个插入顶表面中的门开口流动。 然后液化的材料在模腔中固化成其永久形状。
-
公开(公告)号:US20160005652A1
公开(公告)日:2016-01-07
申请号:US14754396
申请日:2015-06-29
Applicant: Gregory Arther Huber
Inventor: Gregory Arther Huber
IPC: H01L21/77
CPC classification number: B29C33/405 , B29C33/0038 , B29C33/303 , B29C33/306 , B29C33/3842 , B29C45/02 , B29C45/14655 , B29K2705/00 , B29K2821/00 , B29L2031/34
Abstract: Top and bottom ferrous carrier plates have a plurality of pairs of mating window cavities. Pairs of mating nonferrous pre-molded inserts with mating mold cavities snap into mating window cavities with a rubberized retainer ring therebetween to create floating mating pre-molded insert molds in multiple material carrier plate assemblies. Liquefied material is dispensed through pot bushings and plungers in each top pre-molded insert. The liquefied material flows though gate openings located in each insert top surface filling the mold cavities. The liquefied material then solidifies to its permanent shape in the mold cavities.
Abstract translation: 顶部和底部的铁质载体板具有多对配合窗口腔。 具有配合模腔的配对有色预成型插入件对成对配合窗口腔,其间具有橡胶保持环,以在多个材料承载板组件中产生浮动配合预模制插入模具。 液体材料通过每个顶部预模制插入件中的罐衬套和柱塞分配。 液化材料通过位于填充模腔的每个插入顶表面中的门开口流动。 然后液化的材料在模腔中固化成其永久形状。
-
-
-