公开(公告)号:US10808947B2
公开(公告)日:2020-10-20
申请号:US15533675
申请日:2015-11-06
Applicant: HITACHI, LTD.
Inventor: Tsutomu Kawamura , Kaoru Kawabata , Ryousuke Nakamura , Hiroshige Kikuchi , Susumu Ikeda
IPC: F24D11/00 , F24F11/89 , F28D20/00 , F24F11/47 , F24F11/30 , F24D19/10 , F28D19/00 , F24F140/60 , F24F130/00 , F24F130/10 , F24F110/10
Abstract: A heat source system managing device includes: a predicted heat demand upper limit calculating unit configured to calculate a predicted heat demand upper limit by adding a prediction error to a predicted heat demand value for a heat source system; an operation plan preparing unit configured to prepare an operation plan of the heat source system to supply heat of the predicted heat demand upper limit to a consuming facility; a surplus stored heat quantity calculating unit configured to repeatedly perform a process of calculating a surplus stored heat quantity by subtracting a heat quantity consumed by the consuming facility from the predicted heat demand upper limit; and an operation plan changing unit configured to sequentially change the operation plan by decreasing a future operation rate of a refrigerator to cancel the surplus stored heat quantity.
-
公开(公告)号:US10600135B2
公开(公告)日:2020-03-24
申请号:US15577063
申请日:2016-03-22
Applicant: Hitachi, Ltd.
Inventor: Michiki Nakano , Susumu Ikeda , Yu Ikemoto , Takashi Fukumoto
Abstract: To minimize the amount of calculation for changing an operation schedule even when there is an increase in the number of sites. A management computer calculates a first total schedule value, which is the total of the schedule values for each of the sites within a first time frame. If the first total schedule value exceeds a first target value set in advance, the management computer: calculates a first excess amount of the first total schedule value in relation to the first target value; selects, as a first site, a site subjected to a change in a demand schedule from a group of candidate sites satisfying a candidate criterion set in advance from among a plurality of the sites, the selection being performed on the basis of information on the facility characteristics for each of the sites; changes a first demand schedule of the first site in the first time frame; and transmits the changed first demand schedule to a control device of the first site.
-