Business monitoring system and method
    1.
    发明授权
    Business monitoring system and method 失效
    业务监控系统及方法

    公开(公告)号:US5331543A

    公开(公告)日:1994-07-19

    申请号:US642226

    申请日:1991-01-15

    CPC分类号: G07G1/14 G06Q40/123

    摘要: A business monitoring system and method having a supervisory work station and a staff work station as well, having a judgment condition storage function having stored therein a condition described for selecting and extracting contents of a business process transaction, having a judgment function for extracting a transaction having contents to be processed on the basis of the condition, and having a transaction-to-mail converting function for converting the transaction to a mail form according to the judgment result before sending it as electronic mail. The system and method allow a supervisor to register his problem concerned in the judgment condition storage function in a computer language suitable for end users or delete or change the already registered problem. The transaction-to-mail converting function allows the electronic mail converted to mail form to be sent to and stored in a mail box for the supervisory work station. The supervisor can then receive a report related to business processes of concern to him in the mailbox at his convenience.

    摘要翻译: 具有监控工作站和人事工作站的业务监控系统和方法具有判断条件存储功能,其中存储有用于选择和提取业务处理事务内容的条件,具有用于提取交易的判断功能 具有根据该条件进行处理的内容,并且具有交易对邮件转换功能,用于在作为电子邮件发送之前根据判断结果将交易转换成邮件形式。 系统和方法允许主管以适合于最终用户的计算机语言在判断条件存储功能中注册他的问题,或者删除或改变已注册的问题。 交易到邮件转换功能允许将转换成邮件形式的电子邮件发送并存储在监控工作站的邮箱中。 然后,主管可方便地在邮箱中收到与他所关心的业务流程相关的报告。

    Method and device for computing material requirements
    4.
    发明授权
    Method and device for computing material requirements 失效
    计算材料要求的方法和装置

    公开(公告)号:US6122560A

    公开(公告)日:2000-09-19

    申请号:US923069

    申请日:1997-09-03

    CPC分类号: G06Q10/06 G06Q10/0875

    摘要: A method or device for computing material requirements which calculates various parts and materials necessary for products to be produced when a production plan is input, in order to reduce the processing time for a material requirements computation. In order to establish the object, the method or device of computing material requirements is provided, which can perform a parallel process without using conventional low level codes. Parts computing means are respectively assigned to items. When the lower parts computing means receives the computation result of the upper parts computing means, it independently executes the computing process if the computation result is sufficient for the parts computation. The process rate of the material requirements computation can be improved by performing the load distribution under a fixed rule, including that to which computer the data of an item is loaded or by which computer an item is processed, when the material requirements are computed in parallel process using plural computers.

    摘要翻译: 一种用于计算材料需求的方法或装置,其计算当输入生产计划时要产生的产品所需的各种部件和材料,以便减少材料需求计算的处理时间。 为了建立对象,提供了计算材料要求的方法或装置,其可以在不使用常规低级代码的情况下执行并行处理。 零件计算装置分别分配给项目。 当下部计算装置接收上位计算装置的计算结果时,如果计算结果足以用于零件计算,则它独立地执行计算处理。 物料需求计算的过程速度可以通过在固定规则下执行负载分配,包括对物料的数据加载到哪个计算机或处理哪个计算机的物料,当材料需求并行计算时 使用多台计算机的过程。

    Computer aided planning support system
    5.
    发明授权
    Computer aided planning support system 失效
    计算机辅助计划支持系统

    公开(公告)号:US5303144A

    公开(公告)日:1994-04-12

    申请号:US621360

    申请日:1990-12-03

    摘要: The computer aided planning support system of this invention is constructed of a planning information input device from which an object data for making a plan is inputted; an object data storage unit for storing the inputted object data; a planning unit for making a plan by reading the object data stored in the object data storage unit and processing the read-out data in accordance with a planning program; a planning data storage unit for storing the data associated with the plan made by the planning unit; a planning data processing unit for processing the planning data stored in the planning data storage unit in accordance with a predetermined scheduling function and sending the processed data to the planning unit; and a planning information output device for outputting the planning result generated by the planning unit in the form a user can use it.

    摘要翻译: 本发明的计算机辅助计划支持系统由计划信息输入装置构成,其中输入用于制定计划的对象数据; 对象数据存储单元,用于存储输入的对象数据; 计划单元,用于通过读取存储在对象数据存储单元中的对象数据来进行计划,并根据规划程序处理读出的数据; 规划数据存储单元,用于存储与由规划单元制定的计划相关联的数据; 规划数据处理单元,用于根据预定的调度功能处理存储在规划数据存储单元中的规划数据,并将处理的数据发送到规划单元; 以及规划信息输出装置,用于以用户可以使用的形式输出由规划单元生成的规划结果。