Abstract:
A method for generating at least one interactive page template is provided. The at least one interactive page template includes at least one interactive component. The interactive component is a material which can be operated by at least one input signals of the mobile device and be presented by at least one output signals of a mobile device. The method includes: receiving, via a user interface, a setting command, wherein the setting command includes at least one material type and the input signals and output signals; obtaining, by a page component exploring module, at least one interactive page component from a page component repository according to the setting command; generating, by a template generating module, at least one interactive page template, wherein the interactive page template contains the interactive page component, according to the template integrating principle stored in a template integrating principle storage module; and displaying, by the user interface, the at least one interactive page template.
Abstract:
Remote monitoring systems for remotely monitoring execution status of a PLC (Programmable Logic controller) program of a machine include a storage module, a parameter retrieval module and a monitoring module. The storage module stores ladder diagram information corresponding to a PLC source program, wherein the ladder diagram information includes PLC signal address relation information, a plurality of logic switches and a responsive collect command of each logic switch of a ladder diagram. The PLC signal address relation information indicates the relations of the logic switches on the ladder diagram. The parameter retrieval module respectively retrieves parameter data corresponding to the logic switches using the responsive collect commands. The monitoring module generates a status of ladder diagram according to the logic switches, the parameter data and the PLC signal address relation information to display the parameter data corresponding to each logic switch when the machine is executing the PLC source program.
Abstract:
A method for searching target clients, applied to a mobile device coupled to a network, is provided. A target position and a target time are generated by a positioning unit and a time generating unit of the mobile device, respectively. A target clients search message is generated according to keywords input into the mobile device, the target position and the target time and then transmitted to a server coupled to the network through the network. Then a search result transmitted by the server through the network is received. The search result comprises at least one of a target clients amount, a target clients density and a target clients occurrence probability, which are retrieved from at least one social networks data and corresponding to the keywords, the target location and the target time. A map combined with the search result is displayed.
Abstract:
A adjustment system for machining parameter includes a storage device and a processor. The processor includes a mapping module and a prediction module. The mapping module determines a type of a tool under test. When the type of the tool under test is determined as the same as the type of the first cutting tool, the mapping module obtains the first machining data from the database and as it as a reference data of the tool under test. When a machining program related to at least one of the NC program blocks is going to be executed for the tool under test, the prediction module predicts a predicted capacity loss value of the tool under test at a predetermined PRM while executing the machining program.
Abstract:
The present disclosure provides a scheduling system and method. This method includes steps as follow. A communication device is connected to a plurality processing stations and receives instant process data of each processing station, where the instant process data includes a main program number and a processing time. According to target yield, delivery time and the instant process data of the processing stations, production line scheduling is calculated, and an estimated production is forecasted. It is determined that whether the actual production of the production line scheduling matches the estimated production. When the actual production is lower than the estimated production, based on the instant process data, a bottleneck station is determined from the processing stations. The machine diagnosis is performed on the bottleneck station to identify an abnormal cause.
Abstract:
An anti-collision system uses for preventing an object collide with automatic robotic arm. Wherein, the automatic robotic arm includes a controller. The anti-collision system includes a first image sensor, a vision processing unit and a processing unit. The first image sensor captures a first image. The vision processing unit receives the first image, recognizes the object of the first image and estimates an object movement estimation path of the object. The processing unit is coupled to the controller to access an arm movement path. The processing unit estimates an arm estimation path of the automatic robotic arm, analyzes the first image to establish a coordinate system, and determines whether the object will collide with the automatic robotic arm according to the arm estimation path of the automatic robotic arm and the object movement estimation path of the object.
Abstract:
An electricity consumption predicting system includes a knowledge database, a decomposition module, a mapping module and a predicting module. The knowledge database stores model information. The module information records a corresponding relation between each of a plurality of NC program blocks and an electricity consumption value thereof. The decomposition module decomposes a processing program into the NC program blocks, and acquires processing information corresponding to the each of the NC program blocks. The mapping module generates a predictive block electricity consumption value of the each of the NC program blocks according to the NC program blocks, the corresponding processing information and the model information. The predicting module sums up the predictive block electricity consumption values corresponding to the NC program blocks to generate a predictive processing program electricity consumption value.
Abstract:
A tool measurement method includes receiving, through a first communication component, at least one first sensing signal from a tool sensor; receiving, through a second communication component, a plurality of coordinates from a machine tool controller; calculating a tool diameter of a cutting tool according to at least first one target coordinate of the coordinates, wherein the at least one first target coordinate corresponds to the first sensing signal; and providing, through the second communication component, the tool diameter of the cutting tool to the machine tool controller.
Abstract:
The synchronous display streaming system for multi-view frames is provided. The server provides a plurality of display streamings of a content in a plurality of angles. The server stores accounts. The first electronic device logs in a relation account of the accounts of the server. The second electronic device logs in the relation account of the server. The first electronic device and the second electronic device are grouped in a synchronization operation group. The server provides the plurality of display streamings in the plurality of angles to the first and the second electronic device which log in the relation account respectively and display the frames of the content in the plurality of angles on the first and the second electronic device. Any electronic device of the synchronization operation group performs an operation on one of the electronic devices of the synchronization operation group through the relation account of the server.
Abstract:
A monitoring system applied to a shaping machine having a high speed electricity meter. The monitoring system includes a current obtaining device and an analyzing device. The current obtaining device is coupled to the high speed electricity meter to obtain a plurality of current signals from the operated shaping machine and in respond to the shaping machine executes a machining program, the current obtaining device extracts current variation data from the current signals. The machining program corresponds to a piece of the current variation data. The piece of the current variation datum comprises a maximum current and an occurring time that the maximum current being recorded. The analyzing device is configured to calculate a gap, based on the maximum currents and the occurring times corresponding to at least two successive machining programs. In respond to the gap time exceeding a predetermined threshold, the analyzing device generates a warning signal.