METHOD FOR OPERATING AN INDUSTRIAL CONTROL SYSTEM AND CORRESPONDING CONTROL SYSTEM

    公开(公告)号:US20190187658A1

    公开(公告)日:2019-06-20

    申请号:US16323822

    申请日:2017-08-28

    申请人: KEBA AG

    发明人: Harald FISCHER

    IPC分类号: G05B19/042 G05B19/418

    摘要: A method operates an industrial control system, which includes at least one stationary control device and at least one control-technology-based manual operator-control instrument, which can be carried by an operator-control person. In at least one of the manual operator-control instruments, at least one data-technology-based identifier is resident, which represents at least the respective hardware version and the respective software status of the respective manual operator-control instrument. The mode of response of the respective control device or of the entire control system in relation to reliability or non-reliability of the establishment of a control-technology-based interaction, in relation to functional response during an active control-technology-based interaction and in relation to functional response in connection with a termination of a control-technology-based interaction between the respective control device and the manual operator-control instrument is determined or influenced in dependence on this data-technology-based identifier. In addition, a correspondingly constructed control system is specified.

    EVENT ANALYZING DEVICE, EVENT ANALYZING SYSTEM, EVENT ANALYZING METHOD, AND NON-TRANSITORY COMPUTER READABLE STORAGE MEDIUM

    公开(公告)号:US20180224831A1

    公开(公告)日:2018-08-09

    申请号:US15883189

    申请日:2018-01-30

    IPC分类号: G05B19/418 G01D9/00

    摘要: An event analyzing device includes an event data collector configured to collect event data which represents an event including an alarm which has occurred in a plurality of devices in a plant and an operation performed to the devices, a process data collector configured to collect process data of the devices in the plant, a trend change detector configured to detect a trend change of the process data collected by the process data collector, an event data converter configured to convert the trend change detected by the trend change detector into a process change event represented in the same format as the event, and a cause-effect relationship analyzer configured to integrate the event data collected by the event data collector and process change event data which represents the trend change in the process change event converted by the event data converter to analyze a cause-effect relationship between the event and the process change event.

    SCHEDULING SYSTEM AND METHOD
    8.
    发明申请

    公开(公告)号:US20180150066A1

    公开(公告)日:2018-05-31

    申请号:US15371170

    申请日:2016-12-06

    IPC分类号: G05B19/418

    摘要: The present disclosure provides a scheduling system and method. This method includes steps as follow. A communication device is connected to a plurality processing stations and receives instant process data of each processing station, where the instant process data includes a main program number and a processing time. According to target yield, delivery time and the instant process data of the processing stations, production line scheduling is calculated, and an estimated production is forecasted. It is determined that whether the actual production of the production line scheduling matches the estimated production. When the actual production is lower than the estimated production, based on the instant process data, a bottleneck station is determined from the processing stations. The machine diagnosis is performed on the bottleneck station to identify an abnormal cause.