SWITCH MONITORING AND RAILWAY LINE MANAGEMENT
    2.
    发明申请
    SWITCH MONITORING AND RAILWAY LINE MANAGEMENT 有权
    开关监控与铁路线路管理

    公开(公告)号:US20160047092A1

    公开(公告)日:2016-02-18

    申请号:US14925053

    申请日:2015-10-28

    Abstract: The present invention relates to a switch monitoring method and a switch monitoring system, a railway line management method and a railway line management system. Electric signal of a switch motor during pulling of the switch can effectively reflect status of the switch, when the switch is in a stable state, electric signal of its motor is very steady during pulling of the switch; however, when the switch is in an unstable state, there will be different degrees of fluctuation in electric signal of its motor during pulling of the switch. Thus, the invention may be used to identify state of a switch by monitoring electric signal of a switch motor, and further take different measures based on different states of the switch. With these measures, accidents due to switch failure may be effectively reduced, and train delay time may also be reduced through proper line management.

    Abstract translation: 本发明涉及开关监控方法和开关监控系统,铁路线路管理方法和铁路线路管理系统。 开关拉动时开关电机的电信号可以有效地反映开关的状态,当开关处于稳定状态时,拉电动机电机的电信号非常稳定; 然而,当开关处于不稳定状态时,在拉动开关期间其电动机的电信号的波动程度将不同。 因此,本发明可以通过监视开关电动机的电信号来识别开关的状态,并且还基于开关的不同状态采取不同的措施。 通过这些措施,可以有效地减少由于开关故障引起的事故,并且可以通过适当的线路管​​理来降低火车延迟时间。

    DATA CUBE GENERATION
    3.
    发明申请
    DATA CUBE GENERATION 有权
    数据库生成

    公开(公告)号:US20170046370A1

    公开(公告)日:2017-02-16

    申请号:US14825132

    申请日:2015-08-12

    CPC classification number: G06F17/30333 G06F17/30572

    Abstract: Disclosed are a computer-implemented method for generating a data cube from data, a system and a computer program product. The method comprises selecting a candidate granularity from a plurality of candidate granularities determined for a dimension of the data cube, where a data distribution obtained in the selected candidate granularity satisfies a predetermined condition; and generating the data cube based on the selected candidate granularity for the dimension.

    Abstract translation: 公开了一种用于从数据,系统和计算机程序产品生成数据立方体的计算机实现的方法。 该方法包括从为数据立方体的维度确定的多个候选粒度中选择候选粒度,其中以所选候选粒度获得的数据分布满足预定条件; 以及基于所选尺寸的候选粒度来生成数据立方体。

    Switch monitoring and railway line management
    4.
    发明授权
    Switch monitoring and railway line management 有权
    开关监控和铁路线路管理

    公开(公告)号:US09284692B2

    公开(公告)日:2016-03-15

    申请号:US14925053

    申请日:2015-10-28

    Abstract: The present invention relates to a switch monitoring method and a switch monitoring system, a railway line management method and a railway line management system. Electric signal of a switch motor during pulling of the switch can effectively reflect status of the switch, when the switch is in a stable state, electric signal of its motor is very steady during pulling of the switch; however, when the switch is in an unstable state, there will be different degrees of fluctuation in electric signal of its motor during pulling of the switch. Thus, the invention may be used to identify state of a switch by monitoring electric signal of a switch motor, and further take different measures based on different states of the switch. With these measures, accidents due to switch failure may be effectively reduced, and train delay time may also be reduced through proper line management.

    Abstract translation: 本发明涉及开关监控方法和开关监控系统,铁路线路管理方法和铁路线路管理系统。 开关拉动时开关电机的电信号可以有效地反映开关的状态,当开关处于稳定状态时,拉电动机电机的电信号非常稳定; 然而,当开关处于不稳定状态时,在拉动开关期间其电动机的电信号的波动程度将不同。 因此,本发明可以通过监视开关电动机的电信号来识别开关的状态,并且还基于开关的不同状态采取不同的措施。 通过这些措施,可以有效地减少由于开关故障引起的事故,并且可以通过适当的线路管​​理来降低火车延迟时间。

    REORGANIZING DISPLAY OF A RAILWAY TIMETABLE DIAGRAM
    5.
    发明申请
    REORGANIZING DISPLAY OF A RAILWAY TIMETABLE DIAGRAM 有权
    重新组织铁路时刻表的显示

    公开(公告)号:US20130212917A1

    公开(公告)日:2013-08-22

    申请号:US13753691

    申请日:2013-01-30

    CPC classification number: G09D1/00

    Abstract: A method and apparatus for reorganizing display of a railway timetable diagram. A method of reorganizing the display of a railway timetable diagram, including: generating a relational graph by using a multiple of stations in the railway timetable diagram and correlations between the stations; partitioning the relational graph according to a partition rule, where the partition rule reduces lines crossing in at least one page and/or section in at least one page in a reorganized railway timetable diagram, where the lines representing an association between respective stations along a path in the reorganized railway timetable diagram; and displaying a reorganized railway timetable diagram based on a result of the partitioning. An apparatus for reorganizing the display of a railway timetable diagram.

    Abstract translation: 一种重组铁路时刻表显示的方法和装置。 一种重组铁路时刻表显示的方法,包括:通过使用铁路时刻表中的多个车站和车站之间的相关性来生成关系图; 根据分区规则划分关系图,其中分区规则减少在重组的铁路时刻表中的至少一个页面和/或至少一个页面中的部分交叉的行,其中表示沿着路径的各个站之间的关联的线 在重组铁路时刻表中; 并基于分区的结果显示重组的铁路时刻表。 一种重组铁路时刻表显示的装置。

    Identifying abnormal pumpjack conditions

    公开(公告)号:US10540594B2

    公开(公告)日:2020-01-21

    申请号:US14858500

    申请日:2015-09-18

    Abstract: A system and method are provided. The system includes a feature calculator calculates features of a Pressure Volume diagram. The system further includes a pumpjack condition separator separates normal pumpjack conditions from abnormal pumpjack conditions using a hierarchical decision tree, the conditions being determined using the features. The system also includes a compound indicator generator generates a compound indicator when a predetermined number of at least one of features and conditions exceed respective thresholds. The system additionally includes an abnormal PV diagram indicator provides a user-perceptible indication that the PV diagram is abnormal when the compound indicator exceeds a compound indicator threshold.

    Reorganizing display of a railway timetable diagram
    7.
    发明授权
    Reorganizing display of a railway timetable diagram 有权
    重组铁路时刻表的显示

    公开(公告)号:US09576505B2

    公开(公告)日:2017-02-21

    申请号:US15082486

    申请日:2016-03-28

    CPC classification number: G09D1/00

    Abstract: A method and apparatus for reorganizing display of a railway timetable diagram. A method of reorganizing the display of a railway timetable diagram, including: generating a relational graph by using a multiple of stations in the railway timetable diagram and correlations between the stations; partitioning the relational graph according to a partition rule, where the partition rule reduces lines crossing in at least one page and/or section in at least one page in a reorganized railway timetable diagram, where the lines representing an association between respective stations along a path in the reorganized railway timetable diagram; and displaying a reorganized railway timetable diagram based on a result of the partitioning. An apparatus for reorganizing the display of a railway timetable diagram.

    Abstract translation: 一种重组铁路时刻表显示的方法和装置。 一种重组铁路时刻表显示的方法,包括:通过使用铁路时刻表中的多个车站和车站之间的相关性来生成关系图; 根据分区规则划分关系图,其中分区规则减少在重组的铁路时刻表中的至少一个页面和/或至少一个页面中的部分交叉的行,其中表示沿着路径的各个站之间的关联的线 在重组铁路时刻表中; 并基于分区的结果显示重组的铁路时刻表。 一种重组铁路时刻表显示的装置。

    SWITCH MONITORING AND RAILWAY LINE MANAGEMENT
    8.
    发明申请
    SWITCH MONITORING AND RAILWAY LINE MANAGEMENT 审中-公开
    开关监控与铁路线路管理

    公开(公告)号:US20140312181A1

    公开(公告)日:2014-10-23

    申请号:US14360768

    申请日:2012-11-15

    Abstract: A switch monitoring method and a switch monitoring system, a railway line management method and a railway line management system are provided. Electric signal of a switch motor during pulling of the switch can effectively reflect status of the switch, when the switch is in a stable state, electric signal of its motor is very steady during pulling of a switch of the switch; however, when the switch is in an unstable state, there will be different degrees of fluctuation in electric signal of its motor during pulling of the switch. Thus, the invention may be used to identify state of a switch by monitoring electric signal of a switch motor (201,203,205), and further take different measures based on different states of the switch (401,403,405). With these measures, accidents due to switch failure may be effectively reduced, and train delay time may also be reduced through proper line management.

    Abstract translation: 提供开关监控方法和开关监控系统,铁路线路管理方法和铁路线路管理系统。 开关拉动期间开关电机的电信号可以有效地反映开关的状态,当开关处于稳定状态时,拉电动开关时电机的电信号非常稳定; 然而,当开关处于不稳定状态时,在拉动开关期间其电动机的电信号的波动程度将不同。 因此,本发明可以用于通过监视开关电动机(201,203,205)的电信号来识别开关的状态,并且还基于开关的不同状态(401,403,405)采取不同的措施。 通过这些措施,可以有效地减少由于开关故障引起的事故,并且可以通过适当的线路管​​理来降低火车延迟时间。

    IDENTIFYING ABNORMAL PUMPJACK CONDITIONS
    9.
    发明申请

    公开(公告)号:US20170083819A1

    公开(公告)日:2017-03-23

    申请号:US14858500

    申请日:2015-09-18

    CPC classification number: G06N5/045 E21B47/0008

    Abstract: A system and method are provided. The system includes a feature calculator calculates features of a Pressure Volume diagram. The system further includes a pumpjack condition separator separates normal pumpjack conditions from abnormal pumpjack conditions using a hierarchical decision tree, the conditions being determined using the features. The system also includes a compound indicator generator generates a compound indicator when a predetermined number of at least one of features and conditions exceed respective thresholds. The system additionally includes an abnormal PV diagram indicator provides a user-perceptible indication that the PV diagram is abnormal when the compound indicator exceeds a compound indicator threshold.

    Reorganizing display of a railway timetable diagram
    10.
    发明授权
    Reorganizing display of a railway timetable diagram 有权
    重组铁路时刻表的显示

    公开(公告)号:US09406246B2

    公开(公告)日:2016-08-02

    申请号:US13753691

    申请日:2013-01-30

    CPC classification number: G09D1/00

    Abstract: A method and apparatus for reorganizing display of a railway timetable diagram. A method of reorganizing the display of a railway timetable diagram, including: generating a relational graph by using a multiple of stations in the railway timetable diagram and correlations between the stations; partitioning the relational graph according to a partition rule, where the partition rule reduces lines crossing in at least one page and/or section in at least one page in a reorganized railway timetable diagram, where the lines representing an association between respective stations along a path in the reorganized railway timetable diagram; and displaying a reorganized railway timetable diagram based on a result of the partitioning. An apparatus for reorganizing the display of a railway timetable diagram.

    Abstract translation: 一种重组铁路时刻表显示的方法和装置。 一种重组铁路时刻表显示的方法,包括:通过使用铁路时刻表中的多个车站和车站之间的相关性来生成关系图; 根据分区规则划分关系图,其中分区规则减少在重组的铁路时刻表中的至少一个页面和/或至少一个页面中的部分交叉的行,其中表示沿着路径的各个站之间的关联的线 在重组铁路时刻表中; 并基于分区的结果显示重组的铁路时刻表。 一种重组铁路时刻表显示的装置。

Patent Agency Ranking