Equipment management method, equipment management apparatus and equipment management system

    公开(公告)号:US11442773B2

    公开(公告)日:2022-09-13

    申请号:US16498451

    申请日:2018-03-28

    Abstract: An equipment management method comprises a step A of registering, in a database, an alert that includes content of an equipment error, a step B of registering, in the database, a processing status that includes processing of the error, a step C of managing a thread for managing the alert and the processing status in a one-to-one relationship, and a step D of transmitting, to a user terminal, an error notification that includes information indicating generation of the error. The step D includes a step of, when two or more errors do not satisfy a predetermined condition, not integrating the two or more errors in one error notification, and, when the two or more errors satisfy the predetermined condition, integrating the two or more errors in one error notification.

    Equipment management system and equipment management method

    公开(公告)号:US11416951B2

    公开(公告)日:2022-08-16

    申请号:US15771408

    申请日:2016-10-26

    Abstract: An equipment management system 100 comprises a manager 210 configured to manage information on a plurality of power generation facilities 300 having a power generation equipment 310 connected to a power grid configured by a power transmission network; and a controller 230 configured to, when defect information on defect of a power generation equipment 310 provided in a first power generation facility, which is one of the plurality of power generation facilities, is acquired, predict defect of a power generation equipment 310 provided in a second power generation facility, which is different from the first power generation facility. The controller 230 is configured to predict the defect of the power generation equipment 310 provided in the second power generation facility based on the cause of the defect of the power generation equipment 310 provided in the first power generation facility.

    Management method and management apparatus

    公开(公告)号:US11138679B2

    公开(公告)日:2021-10-05

    申请号:US16617500

    申请日:2018-05-23

    Abstract: A management method includes a step A of estimating, for each of the plurality of entities, an error pattern related to a prediction error occurring when a power consumption amount in a future period is predicted; and a step B of determining a group of entities from among the plurality of entities based on the error pattern, wherein the group is a destination of a power reduction request for reducing the power consumption amount. The step A includes a step of estimating whether the prediction error is a positive error or a negative error. The step B includes a step of determining the group such that a total prediction error of the group is minimized, by combining an entity of which the prediction error is estimated to be a positive error and an entity of which the prediction error is estimated to be a negative error.

Patent Agency Ranking