摘要:
A figure management system in which plural kinds of figures concerning the same part to be managed are modified. The figure management system includes a figure DB for storing data of figures including topological figures, an attribute DB for storing object attribute data, input and output devices, and a computer for managing figure and object attribute data. An ID code common to features indicating the same object is assigned. On input of a new figure, feature-attribute matching is performed between a feature having no ID code on the new figure and existent object attribute data. If any inconsistency is found the feature is indicated as a discrepant feature or a renewed feature.
摘要:
The present invention offers a feature data management method which provides data indicating created time and destroyed time of geographic object for feature data, thereby increasing the speed and facilitating a search in time direction. By this method, for example, if the building C is built at time Ts and destroyed at time Te, created time Ts and destroyed time Te of geographic object C are registered in the feature data, whereby it can be managed by a database that the geographic object C existed only between times Ts and Te.
摘要:
An integrated data structure is provided which can be maintained and managed by selectively using data storage forms for storing graphic data representing three-dimensional figures, such as houses, roads, underground piping and the like, according to the properties of an object figure and mixing the same. Three control flags respectively specifying three kinds of operations for extension to be carried out for extending two-dimensional graphic data comprising two-dimensional coordinates (x, y) can be selectively used. An extension 1 to specify the component points of a figure by coordinates (x, y, z), an extension 2 to specify a z-coordinate indicating the altitude of a figure for the figure, and an extension 2 to specify a value d and information f indicating the construction of a figure having a predetermined shape and a method of display are used individually or in combination to form a three-dimensional figure. A variety of three-dimensional figures can be formed by using a comparatively small amount of graphic data, requiring a storage apparatus having a comparatively small storage capacity.
摘要:
It is possible to easily perform the spatial simulation for a large area. Provided is a computer-readable medium recorded with a spatial simulation program for controlling a computer to execute procedures for calculating a time-based change of a variable in a plurality of numerical grids to reproduce on a computer a time-based change of a phenomenon represented by the variable in a space represented by the plurality of numerical grids, the spatial simulation program including the procedures of: defining a sub domain composed of the plurality of numerical grids (201); setting a forcing condition for the sub domain (204); detecting the sub domain including the numerical grid in which the variable changes with time; detecting the sub domain including the numerical grid in which the variable referred to for calculating the time-based change is positioned (205); and updating variables in the numerical grids constituting the detected sub domain (208).
摘要:
It is possible to easily perform the spatial simulation for a large area. Provided is a computer-readable medium recorded with a spatial simulation program for controlling a computer to execute procedures for calculating a time-based change of a variable in a plurality of numerical grids to reproduce on a computer a time-based change of a phenomenon represented by the variable in a space represented by the plurality of numerical grids, the spatial simulation program including the procedures of: defining a sub domain composed of the plurality of numerical grids (201); setting a forcing condition for the sub domain (204); detecting the sub domain including the numerical grid in which the variable changes with time; detecting the sub domain including the numerical grid in which the variable referred to for calculating the time-based change is positioned (205); and updating variables in the numerical grids constituting the detected sub domain (208).
摘要:
There have been problems in the facility information management system arts because when a distance-based facility database is searched for the facility information by specifying the name and distance of a facility, the location and position of a specific facility must be found on a figure such as a map. Such a location is not easily pointed out especially when the facility is damaged. To overcome the above problems, the present invention relates the distance-based facility data with map data and allows a generation of graphical figure data to be overlaid on a map from the numerical data corresponding to the facility parameters stored in the distance-based facility data.
摘要:
In a system manages a plurality of pieces of sensor information in a plant, or the like, it can be reducing an amount of data stored in a database and easily a processing for searching a place of an anomaly and an anomaly cause.A database management method for use in a computer for managing a database, the database management method including: a step of analyzing a query; a step of generating a first inquiry for searching the database for compressed data; a step of generating a second inquiry for executing a search of time-series data; a step of extracting given data from the obtained time-series data, based on a response result of the second inquiry; and a step of generating an output result by extracting data to be output to a client computer from the given data.
摘要:
A sensor-Net system includes sensor nodes which are in intermittent operation so as to save power by repeating activated state and inactivated state at a regular interval. Synchronization of time in the system is executed by aligning to the intermittent operation of the sensor nodes. A management server issues a setTime command for configuring the time to each gateway node at a specified interval. Each router node sets or corrects the time of it based on the time received from the gateway node and thereafter turns ON the time configuration flag for each sensor node in order to expand the setTime command to all of its sibling sensor nodes. The router node, upon reception of a polling, which is a command request, from the sensor node, obtains the time at that time, then uses the time to generate a setTime command to transmit to that sensor node.
摘要:
An overload on a communication path in a sensor network system is prevented while transferring information from a sensor node as close to real time as possible. When the transfer rate of events transferred from a boundary node (DR) toward a gateway (GW) exceeds a limit transfer rate (VL), one of nodes on the sensor node (S) side whose transmission rate meets a preset condition is identified as an excess transmission rate node. The excess transmission rate node, or a node that is not the excess transmission rate node and whose transmission rate should be reduced, is chosen as a deceleration node. A node that reduces the transmission rate of events from the deceleration node, or the transfer rate of the events, is chosen as a deceleration processing executing node. The deceleration processing executing node is instructed to execute preset processing.
摘要:
A sensor-Net system includes sensor nodes which are in intermittent operation so as to save power by repeating activated state and inactivated state at a regular interval. Synchronization of time in the system is executed by aligning to the intermittent operation of the sensor nodes. A management server issues a setTime command for configuring the time to each gateway node at a specified interval. Each router node sets or corrects the time of it based on the time received from the gateway node and thereafter turns ON the time configuration flag for each sensor node in order to expand the setTime command to all of its sibling sensor nodes. The router node, upon reception of a polling, which is a command request, from the sensor node, obtains the time at that time, then uses the time to generate a setTime command to transmit to that sensor node.