公开(公告)号:US11783248B2
公开(公告)日:2023-10-10
申请号:US15575004
申请日:2016-04-28
Applicant: Komatsu Ltd.
Inventor: Chikashi Shike , Yuichi Nemoto , Masahiro Kurihara
IPC: G06Q10/0631 , E02D17/18 , G06Q50/08 , G06Q10/0633 , E02F9/20 , E02F9/26
CPC classification number: G06Q10/06313 , E02D17/18 , E02F9/20 , E02F9/2054 , E02F9/26 , E02F9/261 , G06Q10/0633 , G06Q50/08
Abstract: A construction management system includes: a current topography data acquisition unit configured to acquire current topography data indicating a current topography of a construction site; a design topography data acquisition unit configured to acquire design topography data indicating a design topography of the construction site; a construction plan data calculation unit configured to calculate construction plan data including earth cutting plan data and earth banking plan data by collating the current topography data with the design topography data; and a construction plan data output unit configured to output the construction plan data to an output device. The construction plan data output unit causes an output device to output at least two of the design topography data, the cutting plan data, and the banking plan data in parallel.
-
公开(公告)号:US20180218301A1
公开(公告)日:2018-08-02
申请号:US15747466
申请日:2016-10-05
Applicant: Komatsu Ltd.
Inventor: Chikashi Shike , Yuichi Nemoto , Masahiro Kurihara
CPC classification number: G06Q10/0637 , E02F9/20 , G06Q30/0645 , G06Q50/08
Abstract: A construction management system includes a construction plan data calculation unit configured to calculate, based on construction plan data indicating a construction plan of a construction site, the construction plan data having been calculated based on a current landform and a design landform of the construction site and original unit data indicating a specific condition of a work device, necessary work device data indicating a work device necessary for executing construction of the construction site using the construction plan, and a construction plan data output unit configured to cause an output device to output the necessary work device data.
-
公开(公告)号:US20180137446A1
公开(公告)日:2018-05-17
申请号:US15575004
申请日:2016-04-28
Applicant: Komatsu Ltd.
Inventor: Chikashi Shike , Yuichi Nemoto , Masahiro Kurihara
CPC classification number: G06Q10/06313 , E02D17/18 , E02F9/20 , E02F9/2054 , E02F9/26 , E02F9/261 , G06Q10/0633 , G06Q50/08
Abstract: A construction management system includes: a current topography data acquisition unit configured to acquire current topography data indicating a current topography of a construction site; a design topography data acquisition unit configured to acquire design topography data indicating a design topography of the construction site; a construction plan data calculation unit configured to calculate construction plan data including earth cutting plan data and earth banking plan data by collating the current topography data with the design topography data; and a construction plan data output unit configured to output the construction plan data to an output device. The construction plan data output unit causes an output device to output at least two of the design topography data, the cutting plan data, and the banking plan data in parallel.
-
-