Construction management method based on a current landform and a design landform of a construction site

    公开(公告)号:US11157849B2

    公开(公告)日:2021-10-26

    申请号:US15747286

    申请日:2016-10-05

    Applicant: Komatsu Ltd.

    Inventor: Chikashi Shike

    Abstract: A construction management system includes a construction amount data calculation unit configured to calculate, based on a current landform and a design landform of a construction site, construction amount data of the construction site, an original unit data acquisition unit configured to acquire original unit data indicating a specific condition of a work device that constructs the construction site, a construction plan data calculation unit configured to calculate, based on the construction amount data and the original unit data, a construction plan corresponding to a target construction period, and a construction cost required when construction is executed using the construction plan, and a construction plan data output unit configured to cause an output device to output the construction cost corresponding to the target construction period.

    EVALUATION DEVICE, MANAGEMENT DEVICE, EVALUATION SYSTEM, AND EVALUATION METHOD

    公开(公告)号:US20180341901A1

    公开(公告)日:2018-11-29

    申请号:US15778414

    申请日:2017-02-22

    Applicant: Komatsu Ltd.

    Inventor: Chikashi Shike

    Abstract: An evaluation device incudes: a detected data acquisition unit to acquire detected data including the moving state of a work machine on the basis of movement data detected by a detector; an evaluation data generation unit to generate evaluation data of an operator on the basis of the detected data; a position data acquisition unit to acquire position data of the detector; a link processing unit to generate link data associating the evaluation data with the position data, and a link data output unit to output the link data.

    CONSTRUCTION PLANNING SYSTEM
    4.
    发明申请
    CONSTRUCTION PLANNING SYSTEM 审中-公开
    建筑规划系统

    公开(公告)号:US20160321763A1

    公开(公告)日:2016-11-03

    申请号:US14930980

    申请日:2015-11-03

    Applicant: Komatsu Ltd.

    Inventor: Chikashi Shike

    CPC classification number: G06Q50/08 G06Q10/06313

    Abstract: A construction planning system includes: a current topography data acquisition unit configured to acquire current topography data indicating a current topography of a construction site; a design topography data acquisition unit configured to acquire design topography data indicating a design topography of the construction site; a basic unit data acquisition unit configured to acquire basic unit data indicating conditions of a work machine carrying out a construction in the construction site; a construction plan data calculation unit configured to calculate construction plan data indicating a construction plan of the construction site based on the current topography data, the design topography data, and the basic unit data; and a construction plan data output unit configured to output the construction plan data.

    Abstract translation: 一种施工规划系统,包括:当前地形数据获取单元,被配置为获取表示施工现场的当前地形的当前地形数据; 设计地形数据获取单元,被配置为获取表示施工现场的设计地形的设计地形数据; 基本单元数据获取单元,被配置为获取表示在施工现场进行施工的作业机械的状况的基本单位数据; 构造计划数据计算单元,被配置为基于当前地形数据,设计地形数据和基本单位数据计算表示施工现场的施工计划的施工计划数据; 以及构造成输出构造计划数据的构造计划数据输出单元。

    Work vehicle, server device, load weight management system, and load weight management method

    公开(公告)号:US11131576B2

    公开(公告)日:2021-09-28

    申请号:US16339084

    申请日:2017-12-26

    Applicant: Komatsu Ltd.

    Inventor: Chikashi Shike

    Abstract: A work vehicle includes a working device which is configured to excavate and unload soil, a load meter which is configured to measure weight of the soil loaded by the working device, a transport vehicle specifier which is configured to specify a transport vehicle to be loaded with the soil, a vehicle weight acquirer which is configured to acquire vehicle weight information on loadable weight of the transport vehicle, a load weight calculator which calculates load weight of the soil loaded on the transport vehicle, according to the weight measured by the load meter, and an output unit which is configured to output information on a remaining loading capacity of the transport vehicle obtained from the vehicle weight information and the load weight.

    Construction management system
    8.
    发明授权

    公开(公告)号:US09767523B2

    公开(公告)日:2017-09-19

    申请号:US14889256

    申请日:2015-01-30

    Applicant: Komatsu Ltd.

    Inventor: Chikashi Shike

    CPC classification number: G06Q50/08 E02F9/26 G06Q10/06313 G07C5/02 G08G1/20

    Abstract: A construction management system includes: a transmitter disposed in a transportation vehicle and configured to transmit radio waves including specific data of the transportation vehicle; a mobile terminal disposed in a loading machine; a reception section provided in the mobile terminal and configured to receive the radio waves from the transmitter; a detection section provided in the mobile terminal and configured to detect intensity of the radio waves received by the reception section; a specific data acquisition section provided in the mobile terminal and configured to acquire the specific data from the radio waves received by the reception section; and a work management section configured to generate result data indicating that the transportation vehicle has approached the loading machine based on the intensity detected by the detection section and the specific data acquired by the specific data acquisition section.

    WORK MANAGEMENT DEVICE, WORK MANAGEMENT SYSTEM, OPERATION MACHINE, WORK MANAGEMENT METHOD, AND PROGRAM

    公开(公告)号:US20220108243A1

    公开(公告)日:2022-04-07

    申请号:US17429364

    申请日:2019-11-18

    Applicant: Komatsu Ltd.

    Abstract: A work management device includes a present topography acquisition unit which acquires a present topography at a work site, a final design surface acquisition unit which acquires a final design surface at the work site, a work area acquisition unit which acquires a work area of an operation machine at the work site, a target operation volume acquisition unit which acquires a target operation volume per unit time of the operation machine, an intermediate design surface generation unit which generates an intermediate design surface for the operation machine on the basis of the final design surface, the present topography, the work area, and the target operation volume per unit time, and a notification processing unit which notifies the intermediate design surface to an operator of the operation machine.