摘要:
A bridge for heterogeneous QoS networks is provided. The bridge comprises an UPnP QoS processing unit, a bridge function unit and at least two of network drive drivers. The UPnP QoS processing unit collects connection information connected through the networks and QoS requirement information thereof through an UPnP QoS structure. The bridge function unit establishes and releases connection by allocating resources based on the collected connection information and QoS requirement information, and performs a bridging operation according to connection information of a received frame. At least two of network device drivers are physically connected to the networks.
摘要:
Provided are an apparatus and method for providing en electronic program guide (EPG) and a terminal and method for displaying the EPG. The apparatus includes an information extracting unit extracting the information about the electronic program guide, which specifies broadcasts according to time and channel, from a broadcast signal, a document creating unit converting the extracted information about the electronic program guide into a document in a data format permitted in a user's terminal, and a command processor processing a service command regarding a broadcast selected based on the converted document. Accordingly, it is possible to make an EPG based on a user's favorite broadcasts and provide the EPG to the user's terminal.
摘要:
A method of mechanized construction has developed for installing an earth wire under-bracing by using an auger crane and adjustable excavating unit with an auger crane. The extendable excavating unit is mounted to the lower end of an auger shaft of the auger crane and excavation teeth extendable and retractable are mounted to the excavating unit, thereby allowing excavation of a burial hole suitable to the size of the earth wire under-bracing. Whether it is needed to bury the earth wire under-bracing having a larger diameter than the diameter of excavation existing on the auger crane, or bury small-sized earth wire under-bracing, a method for mechanized construction of the earth wire under-bracing is enabled without difficulty by using an auger crane and adjustable excavating unit.
摘要:
A method of mechanized construction has developed for installing an earth wire under-bracing by using an auger crane and adjustable excavating unit with an auger crane. The extendable excavating unit is mounted to the lower end of an auger shaft of the auger crane and excavation teeth extendable and retractable are mounted to the excavating unit, thereby allowing excavation of a burial hole suitable to the size of the earth wire under-bracing. Whether it is needed to bury the earth wire under-bracing having a larger diameter than the diameter of excavation existing on the auger crane, or bury small-sized earth wire under-bracing, a method for mechanized construction of the earth wire under-bracing is enabled without difficulty by using an auger crane and adjustable excavating unit.