摘要:
A method and apparatus for arranging a progress schedule of a project includes steps for causing a computer to execute multiple simulations of the project, to select the simulation results indicating that the project would not be complete by the deadline among all the obtained simulation results, to modify the schedule of the selected results by increasing the workload per day for each process so that the project would be completed by the deadline, and to present the increased workload per day as recommended workload per day for each process.
摘要:
The invention relates to a turbine casing (1) of an exhaust-gas turbocharger (62), having an inlet connection piece (2) adjoined by a spiral (3), and having an outlet connection piece (4), characterized by an insulating device (5) for reducing the input of heat into the inlet connection piece (2), the spiral (3) and/or the outlet connection piece (4).