摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
A method for automated design of an IT infrastructure, includes a) identifying IT equipment to support services to be provided to meet one or more user requirements; b) identifying one or more auxiliary infrastructures to meet requirements of the identified computer equipment; c) synthesizing the IT equipment and the one or more auxiliary infrastructures to generate a candidate design; d) analyzing one or more operating characteristics of the candidate design; e) repeating steps a)-d) on at least one additional candidate design that differs from the candidate design generated at step c); and f) storing at least one of the candidate design and the at least one additional candidate design.
摘要:
In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要:
In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要:
In a method for generating a resource management plan for an infrastructure, a resource supply available from a combination of resource sources is determined, an operation of the infrastructure in performing an objective using the determined supply of resources is simulated, in which the simulation is to simulate resource demand of a plurality of infrastructure components in performing the objective, a metric(s) associated with operating the infrastructure based upon the simulation is determined, a determination as to whether the metric(s) satisfies a predetermined goal(s) is made, the resources supplied and/or the simulation of the resource demand of the plurality of infrastructure components is modified in response to the at least one metric failing to satisfy the predetermined goal(s), and a resource management plan for the infrastructure that has been determined to result in the metric(s) satisfying the predetermined goal(s) is generated.
摘要:
A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.
摘要:
In a method of determining cooling resource capacity allocations for resource units in a shared environment for optimized operations, cost parameters associated with operating the resource units in at least one of delivering and receiving cooling resources are identified, one or more constraints associated with operating the resource units are identified, in which at least one of the one or more constraints comprises meeting at least a total cooling demand of components in the shared environment, a cost function that correlates the plurality of identified cost parameters is developed, a minimized cost function is solved for through application of a Lagrange multiplier subject to the identified one or more constraints, and cooling resource capacity allocations for the resource units that result in optimized operations in the shared environment based upon the minimized cost function solution are determined.
摘要:
A system for managing a structure having cooling fluid configured to flow around and absorb heat from components contained in the structure includes a plurality of separate cooling mechanisms configured to absorb heat from the cooling fluid. At least two of the plurality of separate cooling mechanisms have at least one different level of a metric with respect to each other. The system also includes a controller configured to implement the plurality of separate cooling mechanisms in a staged manner to remove heat from the cooling fluid. The staged manner includes implementing the cooling mechanism having a relatively lower at least one metric level first and implementing a cooling mechanism having a relatively higher at least one metric level last, to cool the structure.
摘要:
A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.