公开(公告)号:US11933511B2
公开(公告)日:2024-03-19
申请号:US17176477
申请日:2021-02-16
申请人: NEXTracker LLC
发明人: Bruce Christopher Wootton , Rory Joseph Timar , Colin Patrick Murphy , Francesco Borrelli , Allan Daly
CPC分类号: F24F11/49 , F24F11/30 , F24F11/48 , F24F11/52 , F24F11/61 , F24F11/63 , G05B23/0251 , G05B23/0256 , G05B2219/24053 , G05B2219/2614
摘要: A testing platform tests an electrical and mechanical system such as an HVAC unit according to an algorithm that reduces the total testing time of the components of the system, while ensuring the safety of the system during system-wide testing. The platform uses constraints that are checked both before and during the testing to ensure that HVAC operating conditions are acceptable for starting and maintaining component tests. Preferably, the platform uses finite-state machines for each device to organize the component tests, allowing for monitoring of constraints and starting, pausing, and stopping component tests. Preferably, total test execution time is reduced by running component tests in parallel, running component tests based on loads of the components, or combinations of both.
-
2.
公开(公告)号:US20240263821A1
公开(公告)日:2024-08-08
申请号:US18442473
申请日:2024-02-15
申请人: Nextracker LLC
发明人: Bruce Christopher Wootton , Rory Joseph Timar , Colin Patrick Murphy , Francesco Borrelli , Allan Daly
CPC分类号: F24F11/49 , F24F11/30 , F24F11/48 , F24F11/52 , F24F11/61 , F24F11/63 , G05B23/0251 , G05B23/0256 , G05B2219/24053 , G05B2219/2614
摘要: A testing platform tests an electrical and mechanical system such as an HVAC unit according to an algorithm that reduces the total testing time of the components of the system, while ensuring the safety of the system during system-wide testing. The platform uses constraints that are checked both before and during the testing to ensure that HVAC operating conditions are acceptable for starting and maintaining component tests. Preferably, the platform uses finite-state machines for each device to organize the component tests, allowing for monitoring of constraints and starting, pausing, and stopping component tests. Preferably, total test execution time is reduced by running component tests in parallel, running component tests based on loads of the components, or combinations of both.
-