Traction boring device using multiple trepans for producing large cuts
in concrete works and the like and method of producing cuts
    1.
    发明授权
    Traction boring device using multiple trepans for producing large cuts in concrete works and the like and method of producing cuts 失效
    用于生产大型切割混凝土工程的多台铲斗的牵引钻孔装置及其制作方法

    公开(公告)号:US5570934A

    公开(公告)日:1996-11-05

    申请号:US405173

    申请日:1995-03-16

    CPC分类号: B28D1/062 E21B7/001 E21C25/16

    摘要: A multiple trepan boring device for producing substantially large cuts in large works, such as concrete dams, comprises a drilling shaft adapted to be translationally displaced along its longitudinal axis and carrying a series of spaced apart cylindrical rotatable trepans each having a peripheral cutting surface and an annular cutting surface, the latter extending in plane perpendicular to the axis of the shaft and radially between the shaft and the peripheral cutting surface. Weights apply continuous downwards forces on the shaft and thus on the trepans. With the trepans resting on the top of the work to be cut, the trepans are rotated in place, and under the aforementioned forces the peripheral cutting surface of each trepan bores a hole until the shaft rests on the top of the work. Then the shaft is displaced translationally while the trepans continue to rotate thereby causing the annular cutting surfaces to remove a layer of the work extending between the shaft and the peripheral cutting surface. This procedure is repeated so as to produce a cut of a width corresponding to the outside diameter of the trepans by successive removal of crescent-shaped layers from the work. After the removal of each layer, the shaft is lowered along a distance corresponding to the difference in radii between the drilling shaft and the trepans.

    摘要翻译: 用于在诸如混凝土坝的大型工程中生产大量切割的多重镗孔钻孔装置包括:钻杆,其适于沿着其纵向轴线平移移位,并且承载一系列间隔开的圆柱形可旋转铲刀,每个具有周边切割表面和 环形切割表面,后者在与轴的轴线垂直的平面中并且在轴和外围切割表面之间径向延伸。 重量在轴上施加连续的向下的力,因此在横梁上施加。 将踩踏器放在待切割的工件的顶部上,将支架旋转就位,并且在上述力的作用下,每个平底锅的周边切割表面钻孔,直到轴搁在工件的顶部。 然后轴平移地移动,同时延伸器继续旋转,从而使得环形切割表面移除在轴和周边切割表面之间延伸的工件层。 重复该过程,以便通过从工件中连续移除月牙形层来产生对应于花斑的外径的宽度的切口。 在去除每个层之后,轴沿着对应于钻井轴和铲斗之间的半径差的距离降低。

    Method for installing an expansion joint in a concrete dam
    2.
    发明授权
    Method for installing an expansion joint in a concrete dam 失效
    在混凝土坝中安装膨胀节的方法

    公开(公告)号:US5735636A

    公开(公告)日:1998-04-07

    申请号:US479044

    申请日:1995-06-07

    摘要: A method for installing expansion joints in concrete dams using a sealing device includes the steps of boring a hole in the dam intended for receiving the sealing device at a distance from water retained by the dam, installing the sealing device in the hole, and completing the expansion joint by cutting the dam on each side of the hole such that the hole communicates with the downstream side of the dam and with the water on the upstream side thereof. The cut is also made to communicate with the hole and thus with the sealing device. Second and third holes are bored before installing the sealing device in the first hole with the second and third holes overlapping on each side of the first hole. The sealing device comprises a tubular and elastic cell adapted to be inserted and installed in the first hole and includes reinforcements spaced from each other. The sealing device is first positioned in the first hole with its reinforcements located opposite the second and third holes, and is then filled under required pressure with an appropriate fluid.

    摘要翻译: 使用密封装置将膨胀节设置在混凝土坝中的方法包括以下步骤:在坝的孔中钻孔,用于接收密封装置,与水坝保持一定距离的距离,将密封装置安装在孔中,并完成 通过在孔的每一侧切割坝,使得孔与坝的下游侧和其上游侧的水连通。 切口也与孔连通,因此与密封装置连通。 在将密封装置安装在第一孔中之前,第二和第三孔是无孔的,其中第二孔和第三孔在第一孔的每一侧重叠。 该密封装置包括一个适于插入并安装在第一孔中的管状和弹性单元,并且包括彼此分开的增强件。 密封装置首先定位在第一孔中,其加强件与第二孔和第三孔相对,然后用适当的流体在所需压力下填充。

    Sealing device for expansion joints of concrete dams and method for
installing same
    3.
    发明授权
    Sealing device for expansion joints of concrete dams and method for installing same 失效
    混凝土坝伸缩缝密封装置及其安装方法

    公开(公告)号:US5449248A

    公开(公告)日:1995-09-12

    申请号:US031465

    申请日:1993-03-15

    摘要: A sealing device for sealing an expansion joint cut in a concrete dam comprises a tubular cell made of an elastic material and provided at its upper and lower ends respectively with a rigid upper ferrule and a rigid and rounded lower ferrule. Cables are mounted between the upper and lower ferrules for preventing the longitudinal stretching of the cell. The cell includes two longitudinal reinforcements spaced one from another and disposed opposite the cut for preventing the radial deformation of the cell in the cut. A continuous peripheral space is defined on the cell between the lower ends of the reinforcements and the upper end of the lower ferrule to allow the cell to form a continuous peripheral seal against the walls of a hole bored along the expansion joint. A method for the installation of the expansion joint in the concrete dam using the sealing device is also proposed, wherein the sealing device is installed in a hole bored on the expansion joint, the reinforcements being positioned in the direction of the water flow. The cell is then filled and pressurized with appropriate fluids. The expansion joint is obtained by the completion of the cut.

    摘要翻译: 用于密封在混凝土坝中切割的膨胀节的密封装置包括由弹性材料制成的管状电池,并在其上端和下端分别设置有刚性上套圈和刚性和圆形的下套圈。 电缆安装在上下套圈之间,以防止电池的纵向拉伸。 电池包括彼此间隔开并与切割件相对设置的两个纵向加强件,以防止切割中的电池的径向变形。 在加强件的下端和下套圈的上端之间的单元上限定连续的外围空间,以允许电池对沿着膨胀接头钻出的孔的壁形成连续的周边密封。 还提出了一种使用密封装置将膨胀接头安装在混凝土坝中的方法,其中密封装置安装在膨胀接头上钻孔中,加强件沿水流方向定位。 然后将细胞用适当的流体填充和加压。 通过切割完成膨胀接头。