Abstract:
A power estimation circuit including: a power estimation manager circuit configured to receive power data and temperature data; and a storage circuit that includes a first region storing resistive-capacitive (RC) thermal modeling data, a second region storing the power data and a third region storing the temperature data, wherein the power estimation manager circuit is configured to estimate power consumption of a first node at a second time point, which occurs after a first time point, using the RC thermal modeling data, the power data and the temperature data.
Abstract:
A computing system includes: a monitoring block configured to calculate a present power for each of multiple resource units; a thermal block, coupled to the monitoring block, configured to dynamically calculate a thermal candidate set based on the present power, the thermal candidate set for representing a present thermal load for the multiple resource units; and a target block, coupled to the thermal block, configured to determine a target resource based on the thermal candidate set for performing a target task using the target resource.