-
公开(公告)号:US11162323B2
公开(公告)日:2021-11-02
申请号:US16847683
申请日:2020-04-14
Applicant: SOUTHWEST PETROLEUM UNIVERSITY
Inventor: Gao Li , Long He , Zujun Jiang , Rui Li , Yi Feng
IPC: E21B33/134 , C04B14/20 , C04B18/18 , C04B18/24 , C04B26/26 , C09K8/42 , C09K8/44 , E21B33/138 , E21B49/00
Abstract: A multi-slug staged method for plugging a fractured formation includes: determining an average opening of fractures around a well as D, an average particle size of bridging particles for first-stage plugging as D1 that is slightly less than D, and average particle sizes of plugging particles for second to last-stage plugging as D2-Dn, where Dn is small enough to form a tight plugging layer; and sequentially injecting a plugging slurry only containing the bridging particles having the average particle size of D1, plugging slurries containing the plugging particles having the average particle sizes of D2-Dn-1, and a plugging slurry containing the plugging particles having the average particle size of Dn into the fractures to achieve the fractured formation plugging.