公开(公告)号:US20240193547A1
公开(公告)日:2024-06-13
申请号:US18286884
申请日:2022-08-24
Applicant: Samsung Engineering Co., Ltd.
Inventor: Won Sang CHUNG , Hoon Yi KEUN , Baek Hun SONG , Hyun Il LEE , Hyeon Gi BAEK , Hyo Jin KIM , Eun Hye KWON
IPC: G06Q10/10 , G06Q10/0631 , G06Q10/067 , G06Q50/08
CPC classification number: G06Q10/103 , G06Q10/063114 , G06Q10/067 , G06Q50/08
Abstract: According to a preferred embodiment of the present disclosure, a project management device includes: a division unit configured to divide a project into n construction work packages (CWPs) based on a construction type constituting the project, a minimum unit area for managing the project, and design information; and a display unit configured to classify the n CWPs according to construction statuses and work front statuses and display the n CWPs in a grid form.
-
2.
公开(公告)号:US20240013113A1
公开(公告)日:2024-01-11
申请号:US18266122
申请日:2022-09-08
Applicant: Samsung Engineering Co., Ltd.
Inventor: Byung Chul YOO , Hyeon Gi BAEK , Hyun Il LEE , Yong Duk PARK , Ki Yong JEONG , Jae Eun KIM , Syung Houn BAE
IPC: G06Q10/0631 , G06Q50/08
CPC classification number: G06Q10/06314 , G06Q10/06313 , G06Q10/06316 , G06Q50/08
Abstract: Disclosed is a method and system for automatic establishment of an optimal schedule for a construction project. The disclosed method of automatic establishment of an optimal schedule for a construction project is a computer-implemented method of automatic establishment of an optimal schedule for a construction project, the method including: providing project data, standardized schedule data, and characteristic data (S10); generating project schedule data by combining the project data, the standardized schedule data, and the characteristic data (S20); and deriving an optimal project schedule by processing the project schedule data through a scheduling optimization algorithm (S30).
-