-
公开(公告)号:US12282715B2
公开(公告)日:2025-04-22
申请号:US17650920
申请日:2022-02-14
Applicant: Schlumberger Technology Corporation
Inventor: Eric Jonathan Schoen , Lucian Johnston , Mark S. Passolt
Abstract: A method for designing a well, including: determining a first well construction discipline for a first participant and an authority level for the first participant within the first well construction discipline; obtaining a plurality of rules corresponding to the first well construction discipline and the authority level for the first participant within the first well construction discipline; operating, based on the plurality of rules, an interface that restricts decision options for the first participant; receiving a decision associated with the well and based on the interface from the first participant; and updating a design of the well based on the decision.
-
公开(公告)号:US20230410227A1
公开(公告)日:2023-12-21
申请号:US18459500
申请日:2023-09-01
Applicant: Schlumberger Technology Corporation
Inventor: Mark S. Passolt , Lucian Johnston , Jean-Marc Pietrzyk
IPC: G06Q50/02 , E21B44/00 , E21B41/00 , G06Q10/06 , E21B47/022 , E21B49/00 , G06Q10/0631
CPC classification number: G06Q50/02 , E21B44/00 , E21B41/00 , G06Q10/06 , E21B47/022 , E21B49/00 , G06Q10/06313 , E21B7/04
Abstract: A system and method that include receiving constraints that are specified as points in a three-dimensional coordinate system that represent a geological environment that includes a surface position and a subterranean portion of a wellsite and receiving data collected from at least one offset well that is located near the wellsite that pertain to a geology and at least one condition related to drilling of the at least one offset well and determining a set of points through which a wellbore is extendable at the wellsite. The system and method additionally include generating at least one well plan that is based on the constraints and the set of points for constructing a well associated with the wellbore. The system and method further include transmitting the at least one well plan to a drilling system to execute the at least one well plan to control drilling equipment to construct the well.
-
公开(公告)号:US10331288B2
公开(公告)日:2019-06-25
申请号:US14872608
申请日:2015-10-01
Applicant: Schlumberger Technology Corporation
Inventor: Lucian Johnston , Mark S. Passolt
IPC: G06F3/048 , G06F3/0481 , G06F3/0484 , G06T19/20 , E21B41/00 , G01V99/00
Abstract: A method. The method may include obtaining, from a graphical user interface (GUI), a selection of a first oilfield object. The first oilfield object may define a portion of a first wellbore design. The method may further include determining a target context of a second wellbore design. The method may further include obtaining, from the first oilfield object, source oilfield data describing the portion of the first wellbore design. The method may further include adjusting the source oilfield data, according to the target context of the second wellbore design, to obtain target oilfield data for the second wellbore design. The method may further include generating, using the target oilfield data, a second oilfield object within the target context. The method may further include presenting, within the GUI, the second oilfield object.
-
公开(公告)号:US20160098155A1
公开(公告)日:2016-04-07
申请号:US14872608
申请日:2015-10-01
Applicant: Schlumberger Technology Corporation
Inventor: Lucian Johnston , Mark S. Passolt
IPC: G06F3/0481 , G06T19/20 , G06F3/0484
CPC classification number: G06F3/0481 , E21B41/00 , G01V99/005 , G06F3/04842 , G06T19/20
Abstract: A method. The method may include obtaining, from a graphical user interface (GUI), a selection of a first oilfield object. The first oilfield object may define a portion of a first wellbore design. The method may further include determining a target context of a second wellbore design. The method may further include obtaining, from the first oilfield object, source oilfield data describing the portion of the first wellbore design. The method may further include adjusting the source oilfield data, according to the target context of the second wellbore design, to obtain target oilfield data for the second wellbore design. The method may further include generating, using the target oilfield data, a second oilfield object within the target context. The method may further include presenting, within the GUI, the second oilfield object.
Abstract translation: 一个方法。 该方法可以包括从图形用户界面(GUI)获得第一油田物体的选择。 第一油田物体可以定义第一井眼设计的一部分。 该方法还可以包括确定第二井眼设计的目标上下文。 该方法还可以包括从第一油田物体获得描述第一井眼设计的部分的源油田数据。 该方法可以进一步包括根据第二井眼设计的目标环境调整源油田数据,以获得第二井眼设计的目标油田数据。 该方法还可以包括使用目标油田数据来生成目标上下文内的第二油田物体。 该方法还可以包括在GUI内呈现第二油田物体。
-
公开(公告)号:US11319780B2
公开(公告)日:2022-05-03
申请号:US15563763
申请日:2016-04-01
Applicant: Schlumberger Technology Corporation
Inventor: Mark S. Passolt
IPC: G06G7/48 , E21B41/00 , E21B10/00 , E21B43/00 , E21B47/007 , E21B47/022 , E21B47/18 , E21B49/00 , E21B7/06
Abstract: A system can include an individual workspace well design application that includes a graphical user interface that includes selectable graphical elements corresponding to subsystems of a wellsite system and graphical alert elements; a collaborative workspace well design application operatively coupled to the individual workspace well design application; and well design evaluators operatively coupled to the individual workspace well design application and the collaborative workspace well design application where the evaluators receive and analyze design parameters associated with one or more subsystems of a wellsite system to control transmission of one or more alerts that activate one or more graphical alert elements of the individual workspace well design application.
-
公开(公告)号:US20180087321A1
公开(公告)日:2018-03-29
申请号:US15566152
申请日:2016-04-15
Applicant: Schlumberger Technology Corporation
Inventor: Lucian Johnston , Mark S. Passolt
Abstract: A method can include asynchronously receiving a well trajectory as part of a well plan, a fluid plan as part of the well plan and a bottom hole assembly plan as part of the well plan where the well trajectory is based at least in part on information associated with a geologic environment; asynchronously determining coherency metrics as to dependencies between the well trajectory, the fluid plan and the bottom hole assembly plan; and, based at least in part on the coherency metrics, issuing one or more messages that call for adjusting one or more of the well trajectory, the fluid plain and the bottom home assembly plan.
-
公开(公告)号:US20170206289A1
公开(公告)日:2017-07-20
申请号:US15324774
申请日:2015-07-10
Applicant: Schlumberger Technology Corporation
Inventor: Eric Jonathan Schoen , Lucian Johnston , Mark S. Passolt
CPC classification number: G06F17/5009 , E21B41/00 , E21B41/0092 , E21B47/00 , E21B49/00
Abstract: A method for designing a well, including: determining a first well construction discipline for a first participant and an authority level for the first participant within the first well construction discipline; obtaining a plurality of rules corresponding to the first well construction discipline and the authority level for the first participant within the first well construction discipline; operating, based on the plurality of rules, an interface that restricts decision options for the first participant; receiving a decision associated with the well and based on the interface from the first participant; and updating a design of the well based on the decision.
-
公开(公告)号:US11783434B2
公开(公告)日:2023-10-10
申请号:US16905772
申请日:2020-06-18
Applicant: Schlumberger Technology Corporation
Inventor: Mark S. Passolt , Lucian Johnston , Jean-Marc Pietrzyk
IPC: G06Q50/02 , G06Q10/06 , E21B41/00 , E21B44/00 , E21B47/022 , E21B49/00 , E21B7/04 , E21B47/18 , G06Q10/0631
CPC classification number: G06Q50/02 , E21B41/00 , E21B44/00 , E21B47/022 , E21B49/00 , G06Q10/06 , G06Q10/06313 , E21B7/04 , E21B47/18
Abstract: A method can include receiving information that includes well trajectory information, wellsite equipment information and driller information; based at least in part on the information, determining a level of detail of human executable well plan instructions; based at least in part on the information, generating a well plan where the well plan includes human executable well plan instructions based on the determined level of detail; and outputting the well plan.
-
公开(公告)号:US20220251928A1
公开(公告)日:2022-08-11
申请号:US17661185
申请日:2022-04-28
Applicant: Schlumberger Technology Corporation
Inventor: Mark S. Passolt
IPC: E21B41/00 , E21B10/00 , E21B43/00 , E21B49/00 , E21B47/18 , E21B47/007 , E21B47/022 , E21B7/06
Abstract: A system can include an individual workspace well design application that includes a graphical user interface that includes selectable graphical elements corresponding to subsystems of a wellsite system and graphical alert elements; a collaborative workspace well design application operatively coupled to the individual workspace well design application; and well design evaluators operatively coupled to the individual workspace well design application and the collaborative workspace well design application where the evaluators receive and analyze design parameters associated with one or more subsystems of a wellsite system to control transmission of one or more alerts that activate one or more graphical alert elements of the individual workspace well design application.
-
公开(公告)号:US11333006B2
公开(公告)日:2022-05-17
申请号:US15563808
申请日:2016-04-01
Applicant: Schlumberger Technology Corporation
Inventor: Lucian Johnston , Mark S. Passolt
IPC: E21B41/00 , E21B10/00 , E21B43/00 , E21B47/007 , E21B47/022 , E21B47/18 , E21B49/00 , E21B7/06
Abstract: A method can include selecting a location in an area that includes offset wells; determining design parameters of the offset wells; modeling a modeled well based at least in part on the design parameters of the offset wells to generate design parameters for the modeled well; and determining design parameters for a well at the selected location based at least in part on a portion of the design parameters of the offset wells and based at least in part on a portion of the design parameters for the modeled well.
-
-
-
-
-
-
-
-
-