Fabricated ocean tunnel structure with escape device and application method thereof

    公开(公告)号:US11933176B2

    公开(公告)日:2024-03-19

    申请号:US18453868

    申请日:2023-08-22

    CPC classification number: E21D9/14 B63G8/40 E21F11/00 B63G8/41

    Abstract: The present invention belongs to the technical field of ocean traffic engineering, and relates to a fabricated ocean tunnel structure with an escape device and an application method thereof. The present invention includes a fabricated ocean tunnel structure and an escape device. the partition plate separates a middle bin in the tunnel, and the escape device is connected into the middle bin; and the escape device includes a rescue capsule, transverse ladders are evenly arranged in the rescue capsule, and a balancing weight block and a rescue equipment area are arranged at the bottom of the rescue capsule. The ocean tunnel structure can be provided with a rescue device during installation, and the safety of personnel escape can be guaranteed; therefore, the safety of the ocean tunnel structure is improved, cost is relatively low, secondary damage to the ocean tunnel structure is not needed.

    Method for filling deformable karst cave

    公开(公告)号:US11933178B2

    公开(公告)日:2024-03-19

    申请号:US18456347

    申请日:2023-08-25

    CPC classification number: E21F15/005 E02D3/12 E21F15/06

    Abstract: The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a “block stone-like” structure; sealing the elastic silicone tube, separating the “block stone-like” structure from the elastic silicone tube to complete a “block stone-like” structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the “block stone-like” structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.

Patent Agency Ranking