公开(公告)号:US09825580B2
公开(公告)日:2017-11-21
申请号:US14497332
申请日:2014-09-26
申请人: State Grid Corporation of China , Gansu Electric Power Company of State Grid , Wind Power Technology Center of Gansu Electric Power Company , Tsinghua University
发明人: Ning-Bo Wang , Liang Lu , Qing-Quan Lv , Ying Qiao , Zong-Xiang Lu , Kun Ding , Shi-Yuan Zhou , Ding-Mei Wang , Ming Ma
摘要: A method for constructing real-time solar irradiation metering network of gigawatt-level photovoltaic power generation base comprises the following steps: Spatial and temporal distribution characteristics of irradiation quantity of the target area is analyzed based on the historical observation data of the irradiation quantity. The outline location of solar irradiation metering stations is determined by dividing the typical areas where the spatial and temporal distribution characteristics are consistent. The detailed location of solar irradiation metering stations is selected based on the center location distribution of photovoltaic power station clustering. A solar irradiation metering device is constructed on the detailed location of the solar irradiation metering station.
-
公开(公告)号:US09739262B2
公开(公告)日:2017-08-22
申请号:US14565443
申请日:2014-12-10
申请人: State Grid Corporation of China , Gansu Electric Power Company of State Grid , Wind Power Technology Center of Gansu Electric Power Company
发明人: Ning-Bo Wang , Shi-Yuan Zhou , Kun Ding , Liang Lu , Jin Li , Jin-Ping Zhang , Shi-En He , Yan-Hong Ma , Ding-Mei Wang , Rong Huang
CPC分类号: F03D7/00 , F03D17/00 , F05B2260/83 , F05B2270/706 , G05B11/42 , Y02E10/723
摘要: A static testing and calibrating method for PID link of control system of wind turbine includes following steps. A PID control link of the PID link of the control system of wind turbine is tested. A PID regulator response characteristics is tested. The PID link of control system is calibrated by applying test results of the PID control link and the PID regulation response characteristics.
-
公开(公告)号:US09328719B2
公开(公告)日:2016-05-03
申请号:US14515530
申请日:2014-10-16
申请人: State Grid Corporation of China , Gansu Electric Power Company of State Grid , Wind Power Technology Center of Gansu Electric Power Company , Tsinghua University
发明人: Liang Lu , Ning-Bo Wang , Ying Qiao , Zong-Xiang Lu , Qing-Quan Lv , Long Zhao
CPC分类号: F03D7/00 , F03D7/028 , F03D7/048 , F03D17/00 , F05B2260/821 , F05B2270/335 , Y02E10/723
摘要: A method of calculating available output power of wind farm includes following steps. A space vector Vk is obtained by decomposing a power sequence of benchmarking wind turbines in a wind farm based on empirical orthogonal function. A typical power sequence of the benchmarking wind turbines is calculated by restoring the space vector Vk. A total power Ptotal of a feeder on which the benchmarking wind turbines is operated is obtained by enlarging a typical power of each benchmarking wind turbine in proportion according to the quantity of the benchmarking wind turbines operated on the feeder. An output power Pestimate of the wind farm is obtained by accumulating the total power Ptotal of all the benchmarking wind turbines.
摘要翻译: 计算风电场可用输出功率的方法包括以下步骤。 通过基于经验正交函数分解风电场中基准风力发电机的功率序列,得到空间矢量Vk。 通过恢复空间矢量Vk来计算基准风力涡轮机的典型功率序列。 通过根据在馈线上运行的基准风力发电机的数量,按比例放大每个基准风力发电机的典型功率,获得运行基准风力发电机的馈线的总功率Ptotal。 输出功率通过累积所有基准风力发电机的总功率Ptotal获得风力发电场的动力。
-
-