-
公开(公告)号:US07003365B1
公开(公告)日:2006-02-21
申请号:US11001769
申请日:2004-12-02
申请人: Wei-Kuo Yen , Jen-Lin Chao , Wei-Chuan Huang , Chao-Hsin Chang
发明人: Wei-Kuo Yen , Jen-Lin Chao , Wei-Chuan Huang , Chao-Hsin Chang
IPC分类号: G06F19/00
CPC分类号: G06Q10/06
摘要: In a foundry that produces a product family a system and method of reserving capacity for a pre-process order includes a plurality of products, a common pre-process operation and a plurality of distinct post-process operations corresponding to the products. When a pre-process order related to the pre-process operation from a customer is received, pre-process capacity and post-process operating capacity are reserved according to the pre-process order, and the pre-process capacity is provided for the pre-process. When a post-process order for a product corresponding to a specific post-process operation in the product family is received before a cutoff date, the reserved post-process operating capacity is provided for the corresponding post-process operation. If no post-process order is received before the cutoff date, the reserved post-process operating capacity is released as remnant supply. Other systems and methods are also provided.
摘要翻译: 在生产产品系列的铸造厂中,为预处理订单预留容量的系统和方法包括多个产品,共同的预处理操作和对应于产品的多个不同的后处理操作。 当接收到与客户的预处理操作相关的预处理订单时,根据预处理顺序保留预处理能力和后处理操作容量,并为预处理提供预处理能力 -处理。 当在截止日期之前收到与产品系列中的特定后处理操作相对应的产品的后处理订单时,为相应的后处理操作提供保留的后处理操作容量。 如果在截止日期之前没有收到后处理订单,则保留的后处理操作容量作为剩余供应被释放。 还提供了其他系统和方法。
-
公开(公告)号:US07103435B2
公开(公告)日:2006-09-05
申请号:US10677569
申请日:2003-10-02
申请人: Jen-Lin Chao , Chin-Yung Chang , Wei-Kuo Yen
发明人: Jen-Lin Chao , Chin-Yung Chang , Wei-Kuo Yen
IPC分类号: G05B19/418 , G06F19/00
CPC分类号: G06Q10/06 , G06Q10/06312
摘要: A system and method for control factor management for a work-in-process (WIP) in a production system. A plan engine is programmed to receive an order for a product, reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors, and generate a plan for the WIP of the order according to a control factor. A control factor management module adjusts the control factor of the plan engine according to a current value of the control factor in the production system, a target value of the control factor, and a priority of the WIP. Preferably, a control factor matrix of the product is provided in the control factor management module as a function of the current value of the control factor in the production system, the target value of the control factor, the priority of the WIP, and a target date of the order.
摘要翻译: 用于生产系统中的在制品(WIP)的控制因素管理的系统和方法。 计划引擎被编程为接收产品的订单,基于考虑多个容量向量的容量模型来保留订单的容量,并且根据控制因素生成用于订单的WIP的计划。 控制因素管理模块根据生产系统中的控制因素的当前值,控制因素的目标值以及WIP的优先级来调整计划引擎的控制因素。 优选地,控制因子管理模块中的控制因子矩阵作为生产系统中的控制因素的当前值,控制因子的目标值,WIP的优先级和目标值 订单日期
-
公开(公告)号:US20050075747A1
公开(公告)日:2005-04-07
申请号:US10677569
申请日:2003-10-02
申请人: Jen-Lin Chao , Chin-Yung Chang , Wei-Kuo Yen
发明人: Jen-Lin Chao , Chin-Yung Chang , Wei-Kuo Yen
CPC分类号: G06Q10/06 , G06Q10/06312
摘要: A system and method for control factor management for a work-in-process (WIP) in a production system. A plan engine is programmed to receive an order for a product, reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors, and generate a plan for the WIP of the order according to a control factor. A control factor management module adjusts the control factor of the plan engine according to a current value of the control factor in the production system, a target value of the control factor, and a priority of the WIP. Preferably, a control factor matrix of the product is provided in the control factor management module as a function of the current value of the control factor in the production system, the target value of the control factor, the priority of the WIP, and a target date of the order.
摘要翻译: 用于生产系统中的在制品(WIP)的控制因素管理的系统和方法。 计划引擎被编程为接收产品的订单,基于考虑多个容量向量的容量模型来保留订单的容量,并且根据控制因素生成用于订单的WIP的计划。 控制因素管理模块根据生产系统中的控制因素的当前值,控制因素的目标值以及WIP的优先级来调整计划引擎的控制因素。 优选地,控制因子管理模块中的控制因子矩阵作为生产系统中的控制因素的当前值,控制因子的目标值,WIP的优先级和目标值 订单日期
-
公开(公告)号:US07181305B2
公开(公告)日:2007-02-20
申请号:US10844085
申请日:2004-05-12
申请人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
发明人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
CPC分类号: G05B19/4184 , G06Q10/06311 , G06Q30/0601 , Y02P90/14 , Y02P90/18 , Y02P90/20
摘要: A system for exception management. The system comprises an input/output mechanism, a back-end server, and a management server. The input/output mechanism is configured to interface with a user and receive a requirement to suspend a progressing production. The back-end server provides online service according to the requirement. The management server estimates the impact of the required suspension on the production progress according to the requirement and a preset schedule of the production run.
摘要翻译: 用于异常管理的系统。 该系统包括输入/输出机构,后端服务器和管理服务器。 输入/输出机制被配置为与用户接口并接收暂停进行生产的要求。 后端服务器根据需要提供在线服务。 管理服务器根据要求和生产运行的预设时间表,估计所需暂停对生产进度的影响。
-
公开(公告)号:US20050203788A1
公开(公告)日:2005-09-15
申请号:US10797213
申请日:2004-03-10
申请人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
发明人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
IPC分类号: G06F17/60
CPC分类号: G06Q10/06 , G06Q10/0631
摘要: A system and method for capacity management. The system includes at least an order management module and a pull-in engine. The order management module receives at least a first order having a period delivery demand directing a supplier to deliver products corresponding to the order before the end of the period. The pull-in engine pushes out the first order, and directs capacity reserved for the first order to meet a second order with a pull-in demand or if a production event occurs.
摘要翻译: 一种容量管理的系统和方法。 该系统至少包括订单管理模块和引入引擎。 订单管理模块至少接收具有期限交货需求的第一订单,指示供应商在期间结束之前交付与订单对应的产品。 引入引擎推出第一个订单,并指定第一个订单的预留容量,以满足第二个订单的拉入需求或生产事件发生。
-
公开(公告)号:US07130707B2
公开(公告)日:2006-10-31
申请号:US10739843
申请日:2003-12-18
申请人: Jen-Lin Chao , Chen-Wei Hsu , Chin-Yung Chang , Chiang-Chou Lo , Wei-Chuan Huang , Cheng-Hsi Wen
发明人: Jen-Lin Chao , Chen-Wei Hsu , Chin-Yung Chang , Chiang-Chou Lo , Wei-Chuan Huang , Cheng-Hsi Wen
IPC分类号: G06F19/00
CPC分类号: G06Q10/00 , G05B19/41865 , G05B2219/32086 , Y02P90/20
摘要: A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.
摘要翻译: 以客户为导向的制造规划和控制系统。 订单管理模块被编程为接收产品的订单并且基于在生产系统中考虑多个容量向量的容量模型来保留订单的容量。 计划引擎根据容量模型生成订单的固定生产计划。 优先级管理引擎为订单提供优先级。 生产进度监视和评估模块通过统计过程控制(SPC)确定进程中的订单是否符合固定生产计划,以及是否根据历史固定生产计划的动态成果模型调整固定生产计划并调整优先级 基于存储生产系统生产信息的生产数据库中的历史生产信息。
-
公开(公告)号:US20050216330A1
公开(公告)日:2005-09-29
申请号:US10811222
申请日:2004-03-26
申请人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
发明人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
CPC分类号: G06Q10/00 , G06Q10/06312 , G06Q10/06315 , G06Q10/06375
摘要: A system and method for balancing production capacity between different production technologies. The system includes at least an order management module, a reservation module and a capacity management module. The order management module receives a first order, and generates a dummy order corresponding to the first order. The reservation module reserves a first capacity of a first production technology for the first order and a second capacity of a second production technology for the dummy order. The capacity management module cancels the first order and directs the dummy order to substitute the first order if a second order requesting the first production technology is received, and releases the first capacity to fulfill the second order.
摘要翻译: 一种用于平衡不同生产技术之间的生产能力的系统和方法。 该系统至少包括订单管理模块,预约模块和容量管理模块。 订单管理模块接收第一订单,并且生成与第一订单对应的虚拟订单。 预留模块为第一阶段保留第一个生产技术的第一个容量,第二个生产技术的第二个容量用于虚拟订单。 如果接收到请求第一生产技术的第二个订单,则容量管理模块取消第一订单并指示虚拟订单来替换第一订单,并且释放第一容量以实现第二订单。
-
公开(公告)号:US07831459B2
公开(公告)日:2010-11-09
申请号:US10811222
申请日:2004-03-26
申请人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
发明人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
IPC分类号: G06Q10/00
CPC分类号: G06Q10/00 , G06Q10/06312 , G06Q10/06315 , G06Q10/06375
摘要: A system and method for balancing production capacity between different production technologies. The system includes at least an order management module, a reservation module and a capacity management module. The order management module receives a first order, and generates a dummy order corresponding to the first order. The reservation module reserves a first capacity of a first production technology for the first order and a second capacity of a second production technology for the dummy order. The capacity management module cancels the first order and directs the dummy order to substitute the first order if a second order requesting the first production technology is received, and releases the first capacity to fulfill the second order.
摘要翻译: 一种用于平衡不同生产技术之间的生产能力的系统和方法。 该系统至少包括订单管理模块,预约模块和容量管理模块。 订单管理模块接收第一订单,并且生成与第一订单对应的虚拟订单。 预留模块为第一阶段保留第一个生产技术的第一个容量,第二个生产技术的第二个容量用于虚拟订单。 如果接收到请求第一生产技术的第二个订单,则容量管理模块取消第一订单并指示虚拟订单来替换第一订单,并且释放第一容量以实现第二订单。
-
公开(公告)号:US20050267617A1
公开(公告)日:2005-12-01
申请号:US10844085
申请日:2004-05-12
申请人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
发明人: Jen-Lin Chao , Chen-Wei Hsu , Wei-Chuan Huang
IPC分类号: G05B19/418 , G06F19/00
CPC分类号: G05B19/4184 , G06Q10/06311 , G06Q30/0601 , Y02P90/14 , Y02P90/18 , Y02P90/20
摘要: A system for exception management. The system comprises an input/output mechanism, a back-end server, and a management server. The input/output mechanism is configured to interface with a user and receive a requirement to suspend a progressing production. The back-end server provides online service according to the requirement. The management server estimates the impact of the required suspension on the production progress according to the requirement and a preset schedule of the production run.
摘要翻译: 用于异常管理的系统。 该系统包括输入/输出机构,后端服务器和管理服务器。 输入/输出机制被配置为与用户接口并接收暂停进行生产的要求。 后端服务器根据需要提供在线服务。 管理服务器根据要求和生产运行的预设时间表,估计所需暂停对生产进度的影响。
-
公开(公告)号:US20050137732A1
公开(公告)日:2005-06-23
申请号:US10739843
申请日:2003-12-18
申请人: Jen-Lin Chao , Chen-Wei Hsu , Chin-Yung Chang , Chiang-Chou Lo , Wei-Chuan Huang , Cheng-Hsi Wen
发明人: Jen-Lin Chao , Chen-Wei Hsu , Chin-Yung Chang , Chiang-Chou Lo , Wei-Chuan Huang , Cheng-Hsi Wen
IPC分类号: G05B19/418 , G06F19/00 , G06Q10/00
CPC分类号: G06Q10/00 , G05B19/41865 , G05B2219/32086 , Y02P90/20
摘要: A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.
摘要翻译: 以客户为导向的制造规划和控制系统。 订单管理模块被编程为接收产品的订单并且基于在生产系统中考虑多个容量向量的容量模型来保留订单的容量。 计划引擎根据容量模型生成订单的固定生产计划。 优先级管理引擎为订单提供优先级。 生产进度监视和评估模块通过统计过程控制(SPC)确定进程中的订单是否符合固定生产计划,以及是否根据历史固定生产计划的动态成果模型调整固定生产计划并调整优先级 基于存储生产系统的生产信息的生产数据库中的历史生产信息。
-
-
-
-
-
-
-
-
-