Method and System to Eliminate Disruptions in Enterprises
    1.
    发明申请
    Method and System to Eliminate Disruptions in Enterprises 失效
    消除企业中断的方法与制度

    公开(公告)号:US20100174949A1

    公开(公告)日:2010-07-08

    申请号:US12348984

    申请日:2009-01-06

    IPC分类号: G06F11/07

    摘要: A method is implemented in a computer infrastructure having computer executable code tangibly embodied on a computer readable storage medium having programming instructions. The programming instructions are operable to receive disruption data for an enterprise and determine optimal selected disruption data from the received disruption data. Additionally, the programming instructions are operable to correlate triggering events of the optimal selected disruption data to one or more systemic root cause categories and identify a systemic root cause based on the triggering events of the optimal selected disruption data. Furthermore, the programming instructions are operable to determine an optimal enterprise solution set based on the identified systemic root cause and determine an optimal enterprise transformation set based on the optimal enterprise solution set. Moreover, the programming instructions are operable to output the optimal enterprise transformation set for implementing the optimal enterprise transformation set in the enterprise.

    摘要翻译: 在具有计算机可执行代码的计算机基础设施中实现一种方法,其有形地体现在具有编程指令的计算机可读存储介质上。 编程指令可操作以接收企业的中断数据,并根据接收到的中断数据确定最佳选择的中断数据。 另外,编程指令可操作以将最佳选择的中断数据的触发事件与一个或多个系统根本原因类别相关联,并且基于最佳选择的中断数据的触发事件来识别系统根本原因。 此外,编程指令可操作以基于所识别的系统根本原因来确定最佳企业解决方案集合,并且基于最佳企业解决方案集合确定最优企业变换集合。 此外,编程指令可操作以输出用于实现企业中的最佳企业变革集的最优企业变革集。

    Method and system to eliminate disruptions in enterprises
    2.
    发明授权
    Method and system to eliminate disruptions in enterprises 失效
    杜绝企业中断的方法和制度

    公开(公告)号:US07904753B2

    公开(公告)日:2011-03-08

    申请号:US12348984

    申请日:2009-01-06

    IPC分类号: G06F11/00

    摘要: A method is implemented in a computer infrastructure having computer executable code tangibly embodied on a computer readable storage medium having programming instructions. The programming instructions are operable to receive disruption data for an enterprise and determine optimal selected disruption data from the received disruption data. Additionally, the programming instructions are operable to correlate triggering events of the optimal selected disruption data to one or more systemic root cause categories and identify a systemic root cause based on the triggering events of the optimal selected disruption data. Furthermore, the programming instructions are operable to determine an optimal enterprise solution set based on the identified systemic root cause and determine an optimal enterprise transformation set based on the optimal enterprise solution set. Moreover, the programming instructions are operable to output the optimal enterprise transformation set for implementing the optimal enterprise transformation set in the enterprise.

    摘要翻译: 在具有计算机可执行代码的计算机基础设施中实现一种方法,其有形地体现在具有编程指令的计算机可读存储介质上。 编程指令可操作以接收企业的中断数据,并根据接收到的中断数据确定最佳选择的中断数据。 另外,编程指令可操作以将最佳选择的中断数据的触发事件与一个或多个系统根本原因类别相关联,并且基于最佳选择的中断数据的触发事件来识别系统根本原因。 此外,编程指令可操作以基于所识别的系统根本原因来确定最佳企业解决方案集合,并且基于最佳企业解决方案集合确定最优企业变换集合。 此外,编程指令可操作以输出用于实现企业中的最佳企业变革集的最优企业变革集。

    Systems engineering process
    3.
    发明授权
    Systems engineering process 失效
    系统工程流程

    公开(公告)号:US08195492B2

    公开(公告)日:2012-06-05

    申请号:US12557891

    申请日:2009-09-11

    IPC分类号: G06F10/00

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。

    SYSTEMS ENGINEERING PROCESS
    4.
    发明申请
    SYSTEMS ENGINEERING PROCESS 失效
    系统工程流程

    公开(公告)号:US20100004966A1

    公开(公告)日:2010-01-07

    申请号:US12557891

    申请日:2009-09-11

    IPC分类号: G06Q10/00

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。

    Time compression correlator
    5.
    发明授权
    Time compression correlator 失效
    时间压缩相关器

    公开(公告)号:US4162533A

    公开(公告)日:1979-07-24

    申请号:US873324

    申请日:1978-01-30

    申请人: David P. Ricci

    发明人: David P. Ricci

    IPC分类号: G06F17/15 G06F15/34

    CPC分类号: G06F17/15

    摘要: A shift register time compression correlator for determining the degree ofoincidence between two signals designed specifically for battery power or other power limited applications. The correlator introduces variable delays to one input signal and compares the delayed input signal with the other input signal which remains undelayed. The output is a stream of digital pulses, the density of which is a measure of the degree of coincidence between the two input signals.

    摘要翻译: 一种移位寄存器时间压缩相关器,用于确定专为电池功率或其他功率受限应用而设计的两个信号之间的一致度。 相关器将可变延迟引入一个输入信号,并将延迟的输入信号与保持不延迟的另一个输入信号进行比较。 输出是数字脉冲流,其密度是两个输入信号之间一致度的量度。

    SYSTEMS ENGINEERING PROCESS
    6.
    发明申请
    SYSTEMS ENGINEERING PROCESS 审中-公开
    系统工程流程

    公开(公告)号:US20120173437A1

    公开(公告)日:2012-07-05

    申请号:US13417753

    申请日:2012-03-12

    IPC分类号: G06Q10/06

    摘要: A method and system for implementing a project for a customer. A computer readable Requirements Traceability and Verification Matrix (RTVM). The RTVM is stored in a computer readable storage device. A verification is implemented, which verifies: an acceptability of business requirements of the project due to business requirements review (BRR) exit criteria having been satisfied, an acceptability of system requirements of the project due to system requirements review (SRR) exit criteria having been satisfied, an acceptability of component requirements of the project due to component requirements review (PDR) exit criteria having been satisfied. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. In response to the verification, the RVTM is updated with verification information relating to the business requirements, verification information relating to the system requirements, and verification information relating to the component requirements.

    摘要翻译: 为客户实施项目的方法和系统。 计算机可读要求可追溯性和验证矩阵(RTVM)。 RTVM存储在计算机可读存储设备中。 实施验证,验证:由于业务需求审查(BRR)退出条件已被满足,可以接受项目的业务需求,系统需求审查(SRR)退出标准已经可以接受项目的系统要求 满意,由于组件要求审查(PDR)退出标准已被满足,项目组件要求的可接受性。 业务需求分解为系统要求。 系统要求分解为组件要求。 响应于验证,RVTM更新为与业务需求相关的验证信息,与系统要求相关的验证信息以及与组件要求相关的验证信息。

    Systems engineering process
    7.
    发明授权
    Systems engineering process 失效
    系统工程流程

    公开(公告)号:US07590552B2

    公开(公告)日:2009-09-15

    申请号:US10839583

    申请日:2004-05-05

    IPC分类号: G06F17/60

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。