Process for short-time arc-welding and short-time arc-welding system

    公开(公告)号:US07301119B2

    公开(公告)日:2007-11-27

    申请号:US11346539

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    Process for short-time arc-welding and short-time arc-welding system
    2.
    发明授权
    Process for short-time arc-welding and short-time arc-welding system 有权
    短时间弧焊和短时弧焊系统的工艺

    公开(公告)号:US07279653B2

    公开(公告)日:2007-10-09

    申请号:US11346535

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了一种用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件的相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Process for short-time arc welding and short-time arc welding system
    3.
    发明授权
    Process for short-time arc welding and short-time arc welding system 有权
    短时电弧焊和短时电弧焊接系统的工艺

    公开(公告)号:US07045736B2

    公开(公告)日:2006-05-16

    申请号:US10763123

    申请日:2004-01-22

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Short-time arc welding system and method for short-time arc welding
    4.
    发明授权
    Short-time arc welding system and method for short-time arc welding 有权
    短时电弧焊短时电弧焊接系统及方法

    公开(公告)号:US07119302B2

    公开(公告)日:2006-10-10

    申请号:US10769722

    申请日:2004-01-30

    IPC分类号: B23K9/20

    摘要: A short-cycle arc-welding system (10) and a method for welding elements (32), such as metal bolts (32) to components (34) such as sheet metal (34) includes a robot (12), having at least one arm (16) displaceable on at least two co-ordinate axes (x, y, z), a welding head base (20) fixed to robot arm (16), a welding head (22) displaceably mounted on welding head base (20), a retaining device (30) retaining an element, a lifting device (36) for setting and re-positioning retaining device (30) in relation to welding head (22), and a measuring system (44,46) determining the relative position between component (34) and element (32). Measuring system (44,46) has a control device (46), controlling lifting device (36) such that element (32) displaces towards component (34) until contacting component (34) to determine the relative position.

    摘要翻译: 一种短周期电弧焊接系统(10)和用于将元件(32)(诸如金属螺栓(32))焊接到诸如金属板(34)的部件(34)的方法包括:机器人(12),至少具有 至少两个坐标轴(x,y,z)可移动的一个臂(16),固定到机械手臂(16)的焊接头基座(20),可移动地安装在焊接头基座上的焊接头 20),保持元件的保持装置(30),用于相对于焊接头(22)设置和重新定位保持装置(30)的提升装置(36),以及测量系统(44,46),其确定 组件(34)和元件(32)之间的相对位置。 测量系统(44,46)具有控制装置(46),控制提升装置(36),使得元件(32)朝向部件(34)移动,直到接触部件(34)以确定相对位置。

    Process for short-time arc-welding and short-time arc-welding system
    5.
    发明申请
    Process for short-time arc-welding and short-time arc-welding system 有权
    短时间弧焊和短时弧焊系统的工艺

    公开(公告)号:US20060124608A1

    公开(公告)日:2006-06-15

    申请号:US11346539

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element. The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了一种用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件的相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Process for short-time arc-welding and short-time arc-welding system

    公开(公告)号:US20060124609A1

    公开(公告)日:2006-06-15

    申请号:US11346535

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element. The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    Fastening tool and method for fastening an element to a component
    7.
    发明申请
    Fastening tool and method for fastening an element to a component 审中-公开
    用于将元件紧固到部件的紧固工具和方法

    公开(公告)号:US20070056935A1

    公开(公告)日:2007-03-15

    申请号:US11511662

    申请日:2006-08-29

    IPC分类号: B23K9/20

    摘要: Disclosed is a fastening tool for fastening elements to components, having a holding device for holding an element. The holding device can be moved along a fastening direction relative to a fastening tool housing by a fastening drive device in order to fasten the held element to a component. In this tool, a restraining device is provided in order to hold the holding device in a defined position during a movement of the fastening tool housing.

    摘要翻译: 公开了一种用于将元件紧固到部件的紧固工具,具有用于保持元件的保持装置。 保持装置可以通过紧固驱动装置相对于紧固工具壳体沿紧固方向移动,以便将保持的元件紧固到部件上。 在该工具中,设置约束装置,以便在紧固工具壳体移动期间将保持装置保持在限定位置。