Process for short-time arc-welding and short-time arc-welding system

    公开(公告)号:US07301119B2

    公开(公告)日:2007-11-27

    申请号:US11346539

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    Process for short-time arc-welding and short-time arc-welding system
    2.
    发明授权
    Process for short-time arc-welding and short-time arc-welding system 有权
    短时间弧焊和短时弧焊系统的工艺

    公开(公告)号:US07279653B2

    公开(公告)日:2007-10-09

    申请号:US11346535

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了一种用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件的相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Process for short-time arc welding and short-time arc welding system
    3.
    发明授权
    Process for short-time arc welding and short-time arc welding system 有权
    短时电弧焊和短时电弧焊接系统的工艺

    公开(公告)号:US07045736B2

    公开(公告)日:2006-05-16

    申请号:US10763123

    申请日:2004-01-22

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element.The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Process for short-time arc welding and short-time arc welding system
    4.
    发明授权
    Process for short-time arc welding and short-time arc welding system 有权
    短时电弧焊和短时电弧焊接系统的工艺

    公开(公告)号:US07009144B2

    公开(公告)日:2006-03-07

    申请号:US10763124

    申请日:2004-01-22

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc welding, in particular for stud welding, with the step of sampling a welding parameter, in particular the arc voltage (U), during at least one time segment (Ts) of the welding operation, in order to detect disturbances, wherein the measurement curve determined from the sampling operation is smoothed and subsequently wherein at least one tolerance curve is generated which lies at a previously adjustable distance from the smoothed measurement curve, and subsequently the unsmoothed measurement curve is compared with the tolerance curve in order to detect high-frequency disturbances.

    摘要翻译: 提出了一种用于短时间电弧焊接的过程和系统,特别是用于螺柱焊接的步骤,其中在至少一个时间段(T s)期间采样焊接参数,特别是电弧电压(U)的步骤 ),以便检测干扰,其中从取样操作确定的测量曲线被平滑化,随后其中产生至少一个公差曲线,其位于与平滑的测量曲线之前的可调节距离处, 然后将未平滑的测量曲线与公差曲线进行比较,以便检测高频干扰。

    Stud welding apparatus
    5.
    发明授权
    Stud welding apparatus 失效
    螺柱焊接设备

    公开(公告)号:US4797529A

    公开(公告)日:1989-01-10

    申请号:US203535

    申请日:1988-05-23

    IPC分类号: B23K9/073 B23K9/06 B23K9/20

    CPC分类号: B23K9/201

    摘要: Control circuit for arc welding components to workpieces, in which a component is placed on to a workpiece by a weld gun and after a welding stroke is lifted from the workpiece in a return stroke by igniting a pre-current arc and is brought up to the workpiece again in a forward stroke during the burning of an interconnected welding arc, in which a sequencing control determines the tripping moments of return stroke and forward stroke as well as of the welding arc and a monitoring voltage is bypassed from the pre-current arc ignited at the welding point, characterized in that the monitoring voltage (V) is converted into a correction voltage (line 27) by means of a set-point comparator (25) and is superposed on a control voltage (line 18) for principally controlling a high-frequency modulated switching mode power supply unit (15) and said switching mode power supply unit (15), in accordance with the thus corrected control voltage, adjusts its output current (lines 13,14) during the respective welding operation to the resistance value of the pre-current arc established by the monitoring voltage (V) representing the respective welding data.

    摘要翻译: 用于电弧焊接部件到工件的控制电路,其中通过焊枪将部件放置在工件上,并且在焊接冲程之后通过点燃预电弧而在返回行程中从工件被提起并被带到 在相互连接的焊接电弧燃烧期间,工件再次向前冲击,其中排序控制确定返回行程和向前冲程以及焊接电弧的跳闸力矩,并且从预先电弧点火中监控电压旁路 在焊点处,其特征在于,通过设定点比较器(25)将监视电压(V)转换成校正电压(线27),并叠加在控制电压(线18)上,主要控制 高频调制开关模式电源单元(15)和所述开关模式电源单元(15)根据这样校正的控制电压,在呼叫期间调节其输出电流(线路13,14) 根据表示相应焊接数据的监视电压(V)建立的预电弧电阻值的实际焊接操作。

    Arc welding of a weld stud
    6.
    发明授权
    Arc welding of a weld stud 失效
    焊接电弧焊

    公开(公告)号:US5171959A

    公开(公告)日:1992-12-15

    申请号:US805674

    申请日:1991-12-21

    IPC分类号: B23K9/073 B23K9/20

    CPC分类号: B23K9/201

    摘要: Process for welding a weld stud onto a workpiece by means of a drawn arc, in which the weld stud is placed onto the workpiece and, with performance of a welding stroke, is removed from the workpiece in a return stroke, igniting a pilot arc, and is advanced toward the workpiece again in a forward stroke during the combustion of a connected welding arc. The welding arc is divided by pulse-wise current reduction to a minimum value into a sequence of current pulses and the last of these current pulses is extended in time by at least about 1.5 times relative to the preceding current pulses. This extended current pulse lasts substantially to the end of the forward stroke.

    Process for short-time arc-welding and short-time arc-welding system

    公开(公告)号:US20060124609A1

    公开(公告)日:2006-06-15

    申请号:US11346535

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element. The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    Process for short-time arc-welding and short-time arc-welding system
    8.
    发明申请
    Process for short-time arc-welding and short-time arc-welding system 有权
    短时间弧焊和短时弧焊系统的工艺

    公开(公告)号:US20060124608A1

    公开(公告)日:2006-06-15

    申请号:US11346539

    申请日:2006-02-02

    IPC分类号: B23K9/20

    摘要: A process and a system are proposed for short-time arc-welding elements, such as for example metal studs, on to components, such as for example metal sheets, wherein an element in the context of a welding operation is initially raised in relation to the component, a welding arc is formed between the element and the component, and the element is lowered again, the lifting height of the element in relation to the component being detected at least within a time segment between raising and lowering of the element. The initiation of the lowering operation and/or the lowering operation itself is controlled as a factor of the detected lifting height such that a previously specified total welding time is achieved.

    摘要翻译: 提出了一种用于短时间电弧焊接元件(例如金属螺柱)到组件(例如金属板)的工艺和系统,其中在焊接操作的上下文中的元件最初相对于 在元件和部件之间形成焊接电弧,并且元件再次降低,元件的相对于元件的提升高度至少在元件的升高和降低之间的时间段内被检测。 降低操作和/或降低操作本身的启动被控制为检测到的提升高度的因素,从而实现先前指定的总焊接时间。

    Radiation sensing device and control circuit

    公开(公告)号:US09354119B2

    公开(公告)日:2016-05-31

    申请号:US14119501

    申请日:2012-05-24

    申请人: Wolfgang Schmidt

    发明人: Wolfgang Schmidt

    摘要: A radiation sensing device for sensing first radiation (15) comprises a radiation sensor (11) for sensing the first radiation and at least one first radiation guiding member (13) forming at least a part of a first radiation path for guiding, and preferably converging or focusing, the first radiation towards the sensor. The first radiation guiding member (13) also forms at least a part of a second radiation path for guiding second radiation emitted by an illumination device (12). A control circuit (20) comprises a first sensor circuit (21) for operating one or more radiation sensors (11), an illumination circuit (22) for operating one or more illumination devices (22), and at least one connection (26) amongst said circuits (21, 22).