摘要:
A method of selecting a crack resistant layer to be applied to an existing surface, the method comprising the steps of: selecting at least one emulsified bituminous binder to examine, where the emulsified bituminous binder comprises bitumen, one or more emulsifier, and one or more polymers, where the one or more polymers, the one or more emulsifier, or both include a sufficient amount of conjugated diene such that at least 2.5% of the weight of the emulsified bituminous binder residuum comprises conjugated diene, preferably at least 3.0%, more preferably at least 3.5%, and most preferably 4.0%; forming at least one bituminous mixture comprising the emulsified bituminous binder and an aggregate; testing each bituminous mixture for fatigue properties; and selecting a bituminous binder for use in the crack resistant layer. The method may further comprise the steps of testing the bituminous mixture for fracture energy and selecting the emulsified bituminous binder for use in the crack resistant layer based on fatigue properties and fracture energy properties, and/or testing the emulsified bituminous binder residuum for fracture energy and selecting the emulsified bituminous binder for use in the crack resistant layer based on fatigue properties and bituminous binder residuum fracture energy properties.
摘要:
A method of reconstructing a road is provided. This method includes taking representative cores of the road, analyzing the cores, selecting a substantially solvent-free emulsion based on climate history, mixing the emulsion and reclaimed asphalt pavement particles to form an asphalt emulsion mix, testing the asphalt emulsion mix for performance using a raveling test, a thermal cracking prediction test by an indirect tensile testing, a moisture susceptibility test utilizing vacuum saturation, and a dry Marshall stability test. It also includes designing a CIR layer based on this test data. It further includes grinding off a layer of the existing asphalt road leaving at least about an inch, adding an emulsion to the reclaimed asphalt pavement particles, applying the designed cold in-place recycling layer to the road, and compacting it.
摘要:
A method of selecting a crack resistant layer to be applied to an existing surface, the method comprising the steps of: selecting at least one emulsified bituminous binder to examine, where the emulsified bituminous binder comprises bitumen, one or more emulsifier, and one or more polymers, where the one or more polymers, the one or more emulsifier, or both include a sufficient amount of conjugated diene such that at least 2.5% of the emulsified bituminous binder residuum weight comprises conjugated diene, preferably at least 3.0%, more preferably at least 3.5%, and most preferably 4.0%; forming at least one bituminous mixture comprising the emulsified bituminous binder and an aggregate; testing each bituminous mixture for mixture fracture energy properties; and selecting a emulsified bituminous binder for use in the crack resistant layer. The method may further comprise the steps of testing the bituminous mixture for fatigue properties and selecting the emulsified bituminous binder for use in the crack resistant layer based on fatigue properties and mixture fracture energy properties, and/or testing the emulsified bituminous binder residuum for fracture energy and selecting the emulsified bituminous binder for use in the crack resistant layer based on mixture fracture energy properties and bituminous binder fracture residuum energy properties.
摘要:
A method of selecting a crack resistant layer to be applied to an existing surface, the method comprising the steps of: selecting at least one bituminous binder to examine, where the bituminous binder comprises bitumen and one or more polymers, where the one or more polymers include a sufficient amount of conjugated diene such that at least 2.5% of the bituminous binder's weight comprises conjugated diene, preferably at least 3.0%, more preferably at least 3.5%, and most preferably 4.0%; forming at least one bituminous mixture comprising the bituminous binder and an aggregate; testing each bituminous mixture for mixture fracture energy properties; and selecting a bituminous binder for use in the crack resistant layer. The method may further comprise the steps of testing the bituminous mixture for fatigue properties and selecting the bituminous binder for use in the crack resistant layer based on fatigue properties and mixture fracture energy properties, and/or testing the bituminous binder for fracture energy and selecting the bituminous binder for use in the crack resistant layer based on mixture fracture energy properties and bituminous binder fracture energy properties.
摘要:
A method of selecting a crack resistant layer to be applied to an existing surface, the method comprising the steps of: selecting at least one bituminous binder to examine, where the bituminous binder comprises bitumen and one or more polymers, where the one or more polymers include a sufficient amount of conjugated diene such that at least 2.5% of the bituminous binder's weight comprises conjugated diene, preferably at least 3.0%. more preferably at least 3.5%, and most preferably 4.0%; forming at least one bituminous mixture comprising the bituminous binder and an aggregate; testing each bituminous binder for binder fracture energy properties; and selecting a bituminous binder for use in the crack resistant layer. The method may further comprise the steps of testing the bituminous mixture for fatigue properties and selecting the bituminous binder for use in the crack resistant layer based on fatigue properties and binder fracture energy properties, and/or testing the bituminous mixture for fracture energy and selecting the bituminous binder for use in the crack resistant layer based on mixture fracture energy properties and bituminous binder fracture energy properties.
摘要:
A system for repairing roads is provided. The system includes a highly strain tolerant, substantially impermeable, reflective crack relief interlayer. The interlayer includes a polymer modified asphalt binder mixed with a dense fine aggregate mixture. About 100% of the aggregate should be able to pass through about a 9.5 mm sieve. The interlayer mix is designed using volumetrics and verified using a Flexural Beam Fatigue test and a Hveem Stability test. Preferably, an HMA overlay that is compatible with the interlayer, as well as the demands of local traffic, is placed over the interlayer so that a protected, smooth road surface is provided. The system may delay the first appearance of cracks and the severity of cracks for several years compared with traditional hot mix overlays and extend pavement service life.
摘要:
A delinked polymer modified bitumen comprising a delinked polymer-bitumen composite and additional bituminous material. The delinked polymer-bitumen composite comprises sulfur-cured elastomeric material having a vulcanized network and a plurality of polymer backbones; at least one rubber accelerator and at least one activator in sufficient quantities to delink the vulcanized network of the sulfur-cured elastomeric material; and at least one bituminous material, where the sulfur-cured elastomeric material, the rubber accelerator, the activator, and the bituminous material are mixed under high shear conditions at a temperature greater than 70° C. to produce the delinked polymer-bitumen composite.
摘要:
A method of selecting a crack resistant layer to be applied to an existing surface, the method comprising the steps of: selecting at least one bituminous binder to examine, where the bituminous binder comprises bitumen and one or more polymers, where the one or more polymers include a sufficient amount of conjugated diene such that at least 2.5% of the bituminous binder's weight comprises conjugated diene, preferably at least 3.0%, more preferably at least 3.5%, and most preferably 4.0%; forming at least one bituminous mixture comprising the bituminous binder and an aggregate; testing each bituminous mixture for fatigue properties; and selecting a bituminous binder for use in the crack resistant layer. The method may further comprise the steps of testing the bituminous mixture for fracture energy and selecting the bituminous binder for use in the crack resistant layer based on fatigue properties and fracture energy properties, and/or testing the bituminous binder for fracture energy and selecting the bituminous binder for use in the crack resistant layer based on fatigue properties and bituminous binder fracture energy properties.
摘要:
A method for formulating an emulsified polymer modified asphalt, and the emulsion thus created. The method includes mixing at least one polymer and a first binder in a high shear device to produce a polymer-binder composite; mixing the polymer-binder composite with a second binder to form a polymer modified asphalt; and emulsifying the polymer modified asphalt by combining effective amounts of an emulsifying agent and of water with the polymer modified asphalt.
摘要:
An apparatus for use in shearing paving material applied to a surface is provided. This apparatus includes a blade for shearing the asphalt mixture to a desired thickness, cylinders for raising and lowering the blade in response to elevational changes in the surface, at least one signal generator associated with each cylinder and adapted to produce a signal indicative of the elevation of the surface, and at least one signal receiver associated with each signal generator. This blade apparatus is coupled with a prime mover. The receiver is operable to activate the cylinders in response to a signal received from the generator. The blade is raised and lowered as the elevation of the surface changes in response to signals emanating from the generator allowing surface level variations to be evened out while paving.