MULTIPLE OPERATOR RADIO ACCESS NETWORK (MORAN) IN A TELECOMMUNICATIONS SYSTEM
    1.
    发明公开
    MULTIPLE OPERATOR RADIO ACCESS NETWORK (MORAN) IN A TELECOMMUNICATIONS SYSTEM 审中-公开
    多操作无线接入网络(MORAN)电信系统中

    公开(公告)号:EP2904853A1

    公开(公告)日:2015-08-12

    申请号:EP13776444.5

    申请日:2013-10-03

    IPC分类号: H04W48/16

    摘要: The embodiments herein relate to a method in a network node (110) for configuring the network node (110) for a first and at least one second PLMN in a telecommunications system (100). The network node (110) is adapted to serve one or more cells (140). The network node (110) configures a primary PLMN information for the one or more cells (140) to comprise neither of the first or the at least one second PLMN. The network node (110) configures further PLMN information for each cell of the one or more cells (140) in the network node (110) based on information indicating to which of the first or at least one second PLMNs each cell belongs to.

    A METHOD AND A NETWORK NODE FOR IMPROVED RESOURCE UTILIZATION IN A LOAD BALANCED RADIO COMMUNICATION SYSTEM
    2.
    发明授权
    A METHOD AND A NETWORK NODE FOR IMPROVED RESOURCE UTILIZATION IN A LOAD BALANCED RADIO COMMUNICATION SYSTEM 有权
    负载平衡无线电通信系统中改进资源利用的方法和网络节点

    公开(公告)号:EP2944119B1

    公开(公告)日:2017-05-17

    申请号:EP13870605.6

    申请日:2013-01-11

    IPC分类号: H04W36/16 H04W36/30 H04W36/22

    摘要: The present disclosure concerns movements, such as handovers, of user equipments (UEs) 120a-e from one radio cell 130a to another radio cell 130b. Disclosed herein are methods as well radio network nodes 110a, 110b. A radio network node 110a, 110b may, for example, select the most suitable UE(s) 20a-e to move from a source radio cell 130a to a target radio cell 130b in case the traffic load in the source radio cell 130a is below or equal to the traffic load of the target radio cell 130b. Hereby it is made possible to improve the resource utilization.

    摘要翻译: 本公开涉及用户设备(UE)120a-e从一个无线电小区130a到另一个无线电小区130b的移动(例如,越区切换)。 这里公开的还有无线电网络节点110a,110b的方法。 无线电网络节点110a,110b可以例如在源无线电小区130a中的业务量负载低于该值的情况下选择最适合的UE20a-e以从源无线电小区130a移动到目标无线电小区130b 或等于目标无线电小区130b的业务负载。 因此可以提高资源利用率。