摘要:
A model predictive maintenance (MPM) system for building equipment includes an equipment controller configured to operate the building equipment to affect a variable state or condition in a building and an operational cost predictor configured to predict a cost of operating the building equipment over a duration of an optimization period. The MPM system includes a maintenance cost predictor configured to predict a cost of performing maintenance on the building equipment over the duration of the optimization period and an objective function optimizer configured to optimize an objective function to predict a total cost associated with the building equipment over the duration of the optimization period. The objective function includes the predicted cost of operating the building equipment and the predicted cost of performing maintenance on the building equipment.
摘要:
Ein Produktionsplanungssystem (6) für eine Anlage (ANL) der Grundstoffindustrie ermittelt deren Produktionsplanungsdaten (Pi) und gibt sie dem Automatisierungssystem (1) der Anlage (ANL) vor. Ein Zustandsüberwachungssystem (7) ermittelt bisherige und zukünftig erwartete Zustände (Z1) von Komponenten der Anlage (ANL). Ein Qualitätsermittlungssystem (8) ermittelt Zustände (Z2) von von der Anlage (ANL) erzeugten und noch zu erzeugenden Ausgangsprodukten (Ai) und/oder vergangene und zukünftige Zustände (Z3) der Anlage (ANL) als Ganzes. Ein Wartungsplanungssystem (9) und/oder das Produktionsplanungssystem (6) nehmen vom Zustandsüberwachungssystem (7) die von diesem ermittelten Zustände (Z1) der Komponenten der Anlage (ANL) und vom Qualitätsermittlungssystem (8) die von diesem ermittelten Zustände (Z2, Z3) der Ausgangsprodukte (Ai) und/oder der Anlage (ANL) als Ganzes entgegen. Sie berücksichtigen bei der Ermittlung von Wartungsplanungsdaten (W) und/oder der Produktionsplanungsdaten (Pi) die vom Zustandsüberwachungssystem (7) und vom Qualitätsermittlungssystem (8) entgegengenommenen Daten.
摘要:
A system and method of adaptively managing a plurality of engines in a multiengine system, where each engine comprises hot gas components and non-hot gas components, and each engine exhibits a performance margin and a remaining useful life, includes continuously, and in real-time, determining a plurality of different degradation mechanisms for each of the plurality of engines, and continuously, and in real-time, determining which of the determined degradation mechanisms is most limiting. The engines are controlled, based on the most limiting degradation mechanism, in a manner that the remaining useful lives of each engine are substantially equal. The plurality of different degradation mechanisms of each engine are determined based on the engine performance margin, modeled failure predictions of the hot gas components, and modeled failure predictions of the non-hot gas components.
摘要:
A method for monitoring equipment and gathering consumption and diagnostic information can comprise receiving, at a server, a corrugate usage indicator. The corrugate usage indicator can comprise information relating to an amount of corrugate used by a first packaging system. The method can also comprise creating a usage profile for the first packaging system. The usage profile can comprise a corrugate usage profile. The corrugate usage profile can comprise an association between the amount of corrugate used by the first packaging system and the specifications and number of boxes created. Additionally, the method can comprise automatically generating, based upon the corrugate usage profile, a predicted time when a stock of corrugate associated with the first packaging system will be depleted.
摘要:
Die vorliegende Erfindung beschreibt ein innovatives Verfahren wie ein komplexes elektronisches System zur Steuerung eines sicherheitskritischen technischen Prozesses, z.B. die Führung eines autonomen Fahrzeugs, realisiert werden kann. Es wird zwischen einfacher und komplexer Software unterschieden, wobei die einfache Software auf einer fehlertoleranten Hardware ausgeführt wird und wo mehrere diversitäre Versionen der komplexen Software gleichzeitig auf unabhängigen Fault-Containment Units (FCU) ausgeführt werden und wo aus den Ergebnissen der komplexen Software von einer Entscheidungsinstanz, die mittels einer einfachen Software realisiert ist, ein Ergebnis ausgewählt wird das an die Aktuatoren weitergeleitet wird.
摘要:
A method includes fusing multi-modal sensor data from a plurality of sensors having different modalities. At least one region of interest is detected in the multi-modal sensor data. One or more patches of interest are detected in the multi-modal sensor data based on detecting the at least one region of interest. A model that uses a deep convolutional neural network is applied to the one or more patches of interest. Post-processing of a result of applying the model is performed to produce a post-processing result for the one or more patches of interest. A perception indication of the post-processing result is output.
摘要:
Die Erfindung betrifft eine Einrichtung (2) und ein Verfahren zur Optimierung eines Arbeitspunktes für den Betrieb einer automatisierten prozesstechnischen Anlage (1). Zur Bestimmung des Arbeitspunktes werden historische Prozessdaten ausgewertet, welche in Form von zeitlichen Datenfolgen, die bei einem Betrieb der Anlage erfasst wurden, in einem Datenspeicher (6) abgespeichert sind. Für verschiedene Arbeitspunkte, die vorzugsweise jeweils einen stationären Zustand des Anlagenbetriebs entsprechen, wird jeweils eine Maßzahl für die Güte des Betriebs der Anlage bestimmt. Der Arbeitspunkt aus der Vergangenheit mit der besten Güte kann vorteilhaft für den zukünftigen Betrieb der Anlage verwendet werden oder für eine sich anschließende weitere Optimierung genutzt werden.
摘要:
A control system is configured to remotely read data associated with a process system in real time and perform various functions associated with the obtained data. The data may be stored to a database and/or analyzed to provide various operating parameters to one or more remote clients.