摘要:
Systems and methods to condition air are disclosed. An example system includes a desiccant heat transfer device to supply conditioned air to a facility, an air intake to receive air to be conditioned via the desiccant heat transfer device, and a make-up exhaust to provide exhaust air from a heat dissipating device in the facility to provide heated air to reactivate the desiccant heat transfer device.
摘要:
A method for automated design of an IT infrastructure, includes a) identifying IT equipment to support services to be provided to meet one or more user requirements; b) identifying one or more auxiliary infrastructures to meet requirements of the identified computer equipment; c) synthesizing the IT equipment and the one or more auxiliary infrastructures to generate a candidate design; d) analyzing one or more operating characteristics of the candidate design; e) repeating steps a)-d) on at least one additional candidate design that differs from the candidate design generated at step c); and f) storing at least one of the candidate design and the at least one additional candidate design.
摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要:
In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要:
A system for managing utilization of biogas in an infrastructure includes a plurality of biogas implementing apparatuses. The system also includes a biogas source to supply biogas to the plurality of biogas implementing apparatuses and an optimizer to determine a distribution of the biogas to the plurality of biogas implementing apparatuses that substantially optimizes at least one metric associated with operating the infrastructure.
摘要:
According to one example of the present invention, a cooling system is provided. The cooling system comprises a water-cooled air conditioning module for cooling air from a chamber. The chamber is arranged for receiving air to be cooled and hot humid air. The cooling system also comprises a control system for controlling the flow of hot humid air to the chamber such that the air input to the air conditioning module has a predetermined relative humidity level within a predetermined range.
摘要:
According to one example of the present invention, a cooling system is provided. The cooling system comprises a water-cooled air conditioning module for cooling air from a chamber. The chamber is arranged for receiving air to be cooled and hot humid air. The cooling system also comprises a control system for controlling the flow of hot humid air to the chamber such that the air input to the air conditioning module has a predetermined relative humidity level within a predetermined range.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for generating a resource management plan for an infrastructure, a resource supply available from a combination of resource sources is determined, an operation of the infrastructure in performing an objective using the determined supply of resources is simulated, in which the simulation is to simulate resource demand of a plurality of infrastructure components in performing the objective, a metric(s) associated with operating the infrastructure based upon the simulation is determined, a determination as to whether the metric(s) satisfies a predetermined goal(s) is made, the resources supplied and/or the simulation of the resource demand of the plurality of infrastructure components is modified in response to the at least one metric failing to satisfy the predetermined goal(s), and a resource management plan for the infrastructure that has been determined to result in the metric(s) satisfying the predetermined goal(s) is generated.