-
公开(公告)号:US20120109391A1
公开(公告)日:2012-05-03
申请号:US12913368
申请日:2010-10-27
申请人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
发明人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
IPC分类号: G06F1/28
CPC分类号: G06F1/26 , G06F9/4893 , Y02D10/24
摘要: In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要翻译: 在用于管理基础设施中的能量需求的方法中,确定作为时间的函数的基础设施的性能系数(COP)。 缔约方会议是对基础设施效率的衡量标准。 此外,确定基础设施作为时间的函数的能量需求,并且确定基于确定的基础设施的COP暂时地重新分配能量需求的基础设施的能量需求计划。
-
公开(公告)号:US08565931B2
公开(公告)日:2013-10-22
申请号:US12913368
申请日:2010-10-27
申请人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
发明人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
CPC分类号: G06F1/26 , G06F9/4893 , Y02D10/24
摘要: In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要翻译: 在用于管理基础设施中的能量需求的方法中,确定作为时间的函数的基础设施的性能系数(COP)。 缔约方会议是对基础设施效率的衡量标准。 此外,确定基础设施作为时间的函数的能量需求,并且确定基于确定的基础设施的COP暂时地重新分配能量需求的基础设施的能量需求计划。
-
公开(公告)号:US20120109704A1
公开(公告)日:2012-05-03
申请号:US12913494
申请日:2010-10-27
申请人: Ratnesh Kumar Sharma , Thomas W. Christian , Martin Arlitt , Cullen E. Bash , Chandrakant Patel
发明人: Ratnesh Kumar Sharma , Thomas W. Christian , Martin Arlitt , Cullen E. Bash , Chandrakant Patel
IPC分类号: G06Q10/00
CPC分类号: G06Q10/06 , G06Q10/06312
摘要: A system for managing utilization of biogas in an infrastructure includes a plurality of biogas implementing apparatuses. The system also includes a biogas source to supply biogas to the plurality of biogas implementing apparatuses and an optimizer to determine a distribution of the biogas to the plurality of biogas implementing apparatuses that substantially optimizes at least one metric associated with operating the infrastructure.
摘要翻译: 用于管理基础设施中沼气利用的系统包括多个沼气实施装置。 该系统还包括用于向多个沼气实施装置供应沼气的沼气源和优化器,用于确定生物气体向多个沼气实施装置的分布,所述多个沼气实施装置实质上优化与操作基础设施相关联的至少一个度量。
-
公开(公告)号:US20140278692A1
公开(公告)日:2014-09-18
申请号:US14353607
申请日:2011-12-23
申请人: Manish Marwah , Alan A. McReynolds , Amip J. Shah , Zhikui Wang , Chandrakant Patel , Daniel Juergen Gmach , Chris D. Hyser , Niru Kumari , Zhenhua Liu , Cullen E. Bash , Martin Arlitt , Sergey Blagodurov , Yuan Chen , Thomas W. Christian
发明人: Manish Marwah , Alan A. McReynolds , Amip J. Shah , Zhikui Wang , Chandrakant Patel , Daniel Juergen Gmach , Chris D. Hyser , Niru Kumari , Zhenhua Liu , Cullen E. Bash , Martin Arlitt , Sergey Blagodurov , Yuan Chen , Thomas W. Christian
IPC分类号: G06Q10/06
CPC分类号: G06Q10/06312
摘要: In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要翻译: 在用于管理从第一资源供应接收资源的设施的方法中,预定从第一资源供应可用的资源的供应达预定的时间段。 此外,预测在预定时段期间对设施中的资源的需求。 该设施的容量计划计划满足预定义的操作目标,其中容量计划的计划用作输入,可预测的从第一资源供应获得的资源的供应以及在预定期间对设施中的资源的预测需求 一段的时间。 此外,确定计划容量计划是否符合预定义的操作目标。
-
公开(公告)号:US20120297385A1
公开(公告)日:2012-11-22
申请号:US13110539
申请日:2011-05-18
申请人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J. Shah , Thomas W. Christian , Yuan Chen , Chandrakant Patel
发明人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J. Shah , Thomas W. Christian , Yuan Chen , Chandrakant Patel
IPC分类号: G06F9/46
CPC分类号: G06F11/3433 , G06F11/3419 , G06F11/3442 , G06F11/3495 , G06F2201/81 , G06F2201/875
摘要: In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要翻译: 在一个实现中,交互式服务管理系统包括性能简档模块和性能评估模块。 性能简档模块基于与交互式服务相关联的质量评估来定义交互式服务的性能测量。 性能评估模块将性能测量与与交互式服务相关联的性能目标进行比较,并且基于性能测量与性能目标的比较来修改与交互式服务相关联的性能目标。
-
公开(公告)号:US08725868B2
公开(公告)日:2014-05-13
申请号:US13110539
申请日:2011-05-18
申请人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J Shah , Thomas W Christian , Yuan Chen , Chandrakant Patel
发明人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J Shah , Thomas W Christian , Yuan Chen , Chandrakant Patel
IPC分类号: G06F11/00
CPC分类号: G06F11/3433 , G06F11/3419 , G06F11/3442 , G06F11/3495 , G06F2201/81 , G06F2201/875
摘要: In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要翻译: 在一个实现中,交互式服务管理系统包括性能简档模块和性能评估模块。 性能简档模块基于与交互式服务相关联的质量评估来定义交互式服务的性能测量。 性能评估模块将性能测量与与交互式服务相关联的性能目标进行比较,并且基于性能测量与性能目标的比较来修改与交互式服务相关联的性能目标。
-
公开(公告)号:US08683479B1
公开(公告)日:2014-03-25
申请号:US13028974
申请日:2011-02-16
申请人: Martin Arlitt , Thomas W. Christian , Daniel Juergen Gmach , Chris D. Hyser , Jerome Rolia , Manish Marwah , Amip J Shah , Cullen E. Bash , Chandrakant Patel
发明人: Martin Arlitt , Thomas W. Christian , Daniel Juergen Gmach , Chris D. Hyser , Jerome Rolia , Manish Marwah , Amip J Shah , Cullen E. Bash , Chandrakant Patel
IPC分类号: G06F9/46 , G06F15/173
CPC分类号: G06F9/5088
摘要: Methods, apparatus and articles of manufacture to shift information technology workload demands are disclosed. An example method disclosed herein comprises obtaining demand profiles for workloads in an information technology infrastructure, each demand profile representing resource utilization over time to support a respective workload, and evaluating the demand profiles to shift, in time, assignment of at least one of the workloads to resources of the information technology infrastructure based on a target demand profile for an aggregation of the workloads.
摘要翻译: 披露了信息技术工作量需求转移的方法,装置和制造。 本文公开的示例性方法包括获得信息技术基础设施中的工作负载的需求简档,每个需求简档表示随时间推移的资源利用以支持各自的工作负载,以及评估需求简档以及时地转移至少一个工作负载 基于用于聚合工作负载的目标需求简档的信息技术基础设施的资源。
-
公开(公告)号:US09459129B2
公开(公告)日:2016-10-04
申请号:US13528590
申请日:2012-06-20
申请人: Gowtham Bellala , Manish Marwah , Martin Arlitt , Geoff M. Lyon , Cullen E. Bash , Chandrakant Patel
发明人: Gowtham Bellala , Manish Marwah , Martin Arlitt , Geoff M. Lyon , Cullen E. Bash , Chandrakant Patel
IPC分类号: G01F15/06
CPC分类号: G01F15/063
摘要: Determining sensor placement in distributed networks includes identifying measurement locations in a distributed network with a tree topology and selecting a subset of the measurement locations for sensor placement with a mutual information function.
摘要翻译: 确定分布式网络中的传感器位置包括使用树形拓扑识别分布式网络中的测量位置,并用互信息功能选择传感器放置的测量位置的子集。
-
公开(公告)号:US09322667B2
公开(公告)日:2016-04-26
申请号:US13459143
申请日:2012-04-28
申请人: Manish Marwah , Gowtham Bellala , Martin Arlitt , Geoff M Lyon , Cullen E. Bash , Chandrakant Patel
发明人: Manish Marwah , Gowtham Bellala , Martin Arlitt , Geoff M Lyon , Cullen E. Bash , Chandrakant Patel
CPC分类号: G01D4/00 , Y02B70/343 , Y02B90/245 , Y04S20/34 , Y04S20/40
摘要: A method for detecting power consumption anomalies. The method obtains two different time power series and compares them to generate a dissimilarity matrix. A dimensionality reduction equation is applied to the dissimilarity matrix to obtain a low dimensional embedding of the power data. A probability score of each of the time series being anomalous is then calculated.
摘要翻译: 一种检测功耗异常的方法。 该方法获得两个不同的时间功率系列,并比较它们以产生不相似矩阵。 将维度降低方程应用于不相似矩阵以获得功率数据的低维嵌入。 然后计算每个时间序列的异常概率得分。
-
公开(公告)号:US20130289952A1
公开(公告)日:2013-10-31
申请号:US13458462
申请日:2012-04-27
IPC分类号: G06F17/10
CPC分类号: G06Q50/06 , G06Q10/04 , G06Q10/063 , H02J2003/143 , Y02B70/3266 , Y04S20/242
摘要: A method of determining occupancy of a building using a hidden Markov model.
摘要翻译: 使用隐马尔可夫模型确定建筑物的占用的方法。
-
-
-
-
-
-
-
-
-