-
公开(公告)号:US11408257B2
公开(公告)日:2022-08-09
申请号:US16065050
申请日:2017-08-03
IPC分类号: E21B43/10 , E21B7/28 , E21B33/127 , E21B10/34
摘要: A method to provide support within a wellbore includes underreaming a section of the wellbore at a depth spanning a layer of an unstable formation. The method also includes deploying a bistable structure within the wellbore at the depth of the layer of the unstable formation. Additionally, the method includes actuating an expandable packer within the bistable structure to expand the bistable structure in a radially outward direction from a longitudinal axis of the bistable structure. The bistable structure is in contact with walls of the underreamed section of the wellbore upon expanding in the radially outward direction.
-
公开(公告)号:US11353017B2
公开(公告)日:2022-06-07
申请号:US16769234
申请日:2018-02-14
摘要: An intensifier pump includes a piston including at least two selectable piston diameters. Additionally, the intensifier pump includes a plunger that in operation interacts with the piston. The plunger includes a plunger diameter that is smaller than each of the at least two selectable piston diameters.
-
公开(公告)号:US11339629B2
公开(公告)日:2022-05-24
申请号:US17002569
申请日:2020-08-25
摘要: A downhole power generating apparatus comprising a low pressure chamber, a floating piston, a high pressure chamber, a first flow through path, a second flow through path, and a turbine. The low pressure chamber includes an inlet and an outlet for cycling tubing fluid. The floating piston separates the low pressure chamber into an upper and lower section. The floating piston is cyclically responsive to a cycle of tubing fluid and another cycle of tubing fluid. The first flow through path couples a fluid from the lower section of the low pressure chamber to the high pressure chamber in response to a cyclical response of the floating piston. The second flow through path couples the fluid from the high pressure chamber to the lower section in response to another cyclical response of the floating piston.
-
公开(公告)号:US11333002B2
公开(公告)日:2022-05-17
申请号:US16776270
申请日:2020-01-29
发明人: Mark Douglas Macek , Colin E. Kappe
摘要: Completion Systems and Methods to Perform Completion Operations are disclosed. A completion system includes a tubular having a wall that defines a flowbore within the tubular and extending into a zone of an annular region external to the tubular. The completion system also includes a first port disposed in the wall and configured to provide fluid communication between the flowbore and the annular region, and a communication path disposed at least partially within the wall and configured to provide fluid communication with an annulus of a well outside of the zone. The completion system further includes a second port disposed in the wall and configured to provide fluid communication between the flowbore and the communication path, a cover disposed over the second port and configured to prevent fluid communication during a fracturing operation, and a diverter seat disposed in the flowbore of the tubular uphole of the second port.
-
公开(公告)号:US11299955B2
公开(公告)日:2022-04-12
申请号:US16485737
申请日:2018-02-23
IPC分类号: E21B33/12
摘要: Swell packers comprising swellable metal sealing elements and methods for forming a seal in a wellbore are provided. An example method includes providing a swell packer comprising a swellable metal sealing element; wherein the swell packer is disposed on a conduit in the wellbore, exposing the swellable metal sealing element to a brine, and allowing or causing to allow the swellable metal sealing element to swell.
-
公开(公告)号:US11261674B2
公开(公告)日:2022-03-01
申请号:US16776298
申请日:2020-01-29
发明人: Mark Douglas Macek , Colin E. Kappe
IPC分类号: E21B17/18 , E21B34/14 , E21B43/26 , E21B33/124 , E21B41/00
摘要: Completion systems and methods to perform completion operations include a completion system that includes a tubular having a wall that defines a flowbore. The completion system also includes a first port disposed in the wall and configured to provide fluid communication between the flowbore and the annular region, and a communication path disposed at least partially within the wall and configured to provide fluid communication with an annulus of a well outside of the zone. The completion system further includes a second port disposed in the wall and configured to provide fluid communication between the flowbore and the communication path, a first diverter seat disposed in the flowbore uphole of the second port and configured to receive a diverter flowing through the flowbore; and a second diverter seat disposed in the flowbore uphole of the diverter seat and configurable to receive a second diverter flowing through the flowbore.
-
17.
公开(公告)号:US11260644B2
公开(公告)日:2022-03-01
申请号:US16457651
申请日:2019-06-28
申请人: tesa SE
IPC分类号: B32B38/04 , B32B7/12 , B32B37/12 , B32B37/00 , B32B37/06 , B32B37/10 , B32B37/18 , B32B41/00 , B29C65/00
摘要: The invention relates to an applicator for die-cut parts (2), having a die-cut part strip (1) with a longitudinal direction (L) having a carrier layer (3) and an adhesive layer (4), where an outer contour of the die-cut parts (2) is punched through the carrier layer and adhesive layer (3, 4) down to predetertnined breaking points (18) and a die-cut part complement (19) protrudes beyond the die-cut parts (2) continuously laterally to a longitudinal direction (L), and a punch head (8) over which the die-cut part strip (1) runs, where the die-cut parts (2) running over the punch head (8) face away from the punch head (8) by their adhesive layer (4), and the die-cut parts (2) can be pressed by means of the punch head (8) onto a surface (11).
-
公开(公告)号:US11236560B2
公开(公告)日:2022-02-01
申请号:US16639396
申请日:2019-05-03
发明人: Rajesh C. Kapila , Barry Hoffman
IPC分类号: E21B21/06 , E21B43/34 , E21B21/01 , E21B36/04 , B01D21/24 , F26B11/12 , F26B17/20 , B01D21/00
摘要: Provided are systems and methods that are related to a fluid processing unit. A method for separating a drilling waste fluid, the method comprising: introducing drilling waste fluid into a thermal extraction chamber; allowing drilling waste fluid to flow longitudinally along two screws disposed within thermal extraction chamber, wherein each screw comprises a shaft, an orifice, and an internal heating element; allowing internal heating element to provide heat to thermal extraction chamber; allowing at least a portion of the drilling waste fluid to evaporate; removing evaporated fluid through a first outlet; removing solids through a second outlet. A thermal extraction chamber for separating drilling waste fluids, wherein thermal extraction chamber comprises: a barrel; a first screw; a second screw, wherein first screw and the second screw comprise a shaft, an orifice, a an internal heating element; an inlet port; a first outlet port; and a second outlet port.
-
公开(公告)号:US11203904B2
公开(公告)日:2021-12-21
申请号:US16331917
申请日:2016-12-21
摘要: Fixed-cutter matrix bits comprising hardfaced elements on the gauge pads, and methods of manufacture and using. An example fixed-cutter matrix bit comprises a matrix bit body, a plurality of cutter elements secured at fixed locations to the matrix bit body, and a plurality of gauge pads disposed on the matrix bit body; wherein at least one of the gauge pads includes a hardfaced exterior surface. The hardfaced exterior surface may comprise a material selected from the group consisting of tungsten, niobium, vanadium, molybdenum, silicon, titanium, tantalum, zirconium, chromium, yttrium, boron, carbon, carbides thereof, nitrides thereof, borides thereof, oxides thereof, silicides thereof, and combinations thereof. The hardfaced exterior surface may be fused to the at least one gauge pad during the infiltration process of manufacturing the matrix bit body.
-
20.
公开(公告)号:US11169846B2
公开(公告)日:2021-11-09
申请号:US16116771
申请日:2018-08-29
申请人: TIBCO Software Inc.
发明人: Reza Fatemi , John Driver
摘要: A system for scheduling and dispatching workload items between tasks can include an aggregated file structure and a task scheduler. The aggregated file structure comprises at least one logical partition with each partition having a secondary operating system and address spaces and a plurality of tasks executable therein. The task scheduler is executable from the primary operating system and can receive a service request from a task requesting an action from at least one other task and writing the action, a first task identifier, and at least one other task identifier to at least one private memory address associated with the other task or tasks. The service request action can be a start service request, a stop service request, a suspend service request, a resume service request, change the order of execution service request, or a change priority of executing tasks service request.
-
-
-
-
-
-
-
-
-