-
11.
公开(公告)号:US10165718B2
公开(公告)日:2018-12-25
申请号:US15141821
申请日:2016-04-29
Inventor: Hisashi Maezono , Hideki Sumi , Yasuhiro Maenishi
Abstract: Provided are a component replenishment support method, and a component replenishment support system of a component mounting line that are capable of preventing a decrease in facility operation rate due to component shortage, in which a component shortage time of each part feeder is predicted, a component replenishment work is started from the present time in a case where the component shortage time is earlier than the virtual work end time, a work end time of the work target selection feeders in sequence of early time by using the part feeder within the warning consideration start time as a target is predicted, and a worker is warned of the component replenishment to the selection feeder of which the work end time is within the warning start time, in a case where the selection feeder of which the component shortage time is earlier than the work end time is not present.
-
公开(公告)号:US09801318B2
公开(公告)日:2017-10-24
申请号:US14605518
申请日:2015-01-26
Inventor: Hideki Sumi
IPC: G06F19/00 , H05K13/04 , H05K13/02 , G05B19/418
CPC classification number: H05K13/0417 , G05B19/4183 , G05B2219/35288 , H05K13/021 , H05K13/0215 , H05K13/084 , H05K13/086 , Y02P90/04 , Y02P90/10
Abstract: A component verification method includes a component ID reading process of reading a component ID corresponding to a stored component of a subsequent tape, a tape insertion detecting process of detecting that the subsequent tape has been inserted into a tape feeder, a feeder specifying process of specifying a tape feeder in which the insertion of the subsequent tape has been detected, and a component verifying process of verifying whether or not a correspondence relationship between the read component ID and the specified tape feeder is correct.
-