摘要:
A tracing device includes an appropriateness determination section configured to determine whether an image processing, which is executed in a production process of a board product by a board work machine, satisfies an appropriateness condition indicating reliability of a result of the image processing when the result of the image processing stays within a permissible range in which the result of the image processing is determined normal and an information management section configured to record image data used in the image processing as traceability information according to the result of the determination made by the appropriateness condition determination section.
摘要:
A component verification method includes a component ID reading process of reading a component ID corresponding to a stored component of a subsequent tape, a tape insertion detecting process of detecting that the subsequent tape has been inserted into a tape feeder, a feeder specifying process of specifying a tape feeder in which the insertion of the subsequent tape has been detected, and a component verifying process of verifying whether or not a correspondence relationship between the read component ID and the specified tape feeder is correct.
摘要:
A board ID code label on which a coded board ID is recorded is affixed to circuit board. Provided are a code reading device (camera) that reads a board ID of the circuit board from board ID code label, a code label feeder that supplies provisional board ID code label, and a code label affixing device that affixes provisional board ID code label to circuit board when reading of the board ID fails. Management is performed by linking traceability information to the read board ID or provisional board ID for each circuit board and registering the information in database.
摘要:
The present invention is related to a component and material traceability control apparatus for controlling manufacturing lot identification information of any of a component and material constituting a product manufactured according to a process where a manufacturing apparatus with not less than one component and material reserve unit picks up a needed amount out of the component and material reserved in the component and material reserve unit and manufactures the product, and the component and material traceability control apparatus is equipped with at least a processing unit, a memory unit used as a work area by the processing unit, a manufacturing performance information memory unit, a component and material supply performance information memory unit, and a manufacturing lot trace information memory unit.
摘要:
An information processing apparatus includes a line information storage unit for storing pieces of line information, a data reception unit for receiving numerical control (NC) data for producing a first board, a line identifier acquiring unit for acquiring a line identifier from line identifiers stored in the line information storage unit according to the NC data, and an output unit for outputting the line identifier acquired by the line identifier acquiring unit. Each of the pieces of line information includes a line identifier for identifying a production line of a board, board size information indicating a size of the board that can be produced by the production line identified by the line identifier, and component information about at least one component mountable on the board in the production line identified by the line identifier. The NC data includes board size information and first component information about a component mountable on the first board. This information processing apparatus accurately selects a production line appropriate for producing the board.
摘要:
A component mounting apparatus includes a first cassette, a second cassette, a cassette attachment part, a first wireless communicator, and an information updater. The first cassette and the second cassette are cassettes each having a space that accommodates a roll body of a carrier tape, an opening that allows the roll body to be loaded into and unloaded from the space, and an RFID tag. The first and second cassettes are attached to the cassette attachment part such that they are arranged, with their respective openings facing each other. The first wireless communicator communicates with an RFID tag of the first cassette attached to the cassette attachment part. The information updater updates, through the first wireless communicator, information stored in the RFID tag of the first cassette, in linkage with start of conveyance of the carrier tape from the second cassette by the component supply unit.
摘要:
A substrate standby unit that is capable of keeping only one substrate 4 on standby in a substrate sorting mechanism 40 that moves the substrate 4 from the print inspection device M2 to the component installation device M4, a memory device 60 that stores a substrate ID on the substrate 4 that is on standby in the substrate standby unit, and a substrate ID management unit 46 that updates the substrate ID that is stored in the memory device 60 accompanying the transfer of the substrate 4 from the print inspection device M2 to the substrate standby unit are included. The substrate ID stored in the memory device 60 and the inspection result data associated with this substrate ID and stored in an inspection result data memory unit 45 are transmitted to the component installation device M4.
摘要:
A component verification method includes a component ID reading process of reading a component ID corresponding to a stored component of a subsequent tape, a tape insertion detecting process of detecting that the subsequent tape has been inserted into a tape feeder, a feeder specifying process of specifying a tape feeder in which the insertion of the subsequent tape has been detected, and a component verifying process of verifying whether or not a correspondence relationship between the read component ID and the specified tape feeder is correct.
摘要:
An electronic-circuit assembling process to be carried out in an electronic-circuit assembling system, for assembling an electronic circuit, by mounting electronic circuit components supplied from a component supplier, onto a circuit board, wherein the electronic circuit components includes at least one of different-property components having respective different electrical properties. The process includes: (a) a different-property-component-related information obtaining step of obtaining a different-property-component-related information including (a-i) a property-related information that enables recognition of the electrical property of the different-property component supplied from the component supplier and (a-ii) a different-property-component supply position that is a position of the component supplier supplying the different-property component, such that the different-property-component-related information is obtained by detecting the property-related information and/or the different-property-component supply position; (b) a mounting step of mounting, based on information related to the different-property-component supply position, the electronic circuit components including the different-property component, onto the circuit board; and (c) a property-related information providing step of providing the circuit board with the property-related information of the different-property component mounted on the circuit board.
摘要:
The invention relates to a device for characterising component carriers (100, 200, 310) provided with a plurality of electrical components (110, 210) to be fitted, and to a method for using one such device. Said device comprises at least one data carrier (150, 250, 350) which is coupled to the components (110, 210) to be fitted, and in which at least technical data of the components (110, 210) is stored. Said data carrier (150, 250, 350) can be detected and read by means of a processing unit, and is designed in such a way that it can store other technical component data, logistical component data and/or operating data of the fitting installation. It is thus possible to take into account all operating states of a fitting installation, defective components, defective fitting processes etc. during a fitting process in a fitting program, and/or to evaluate the corresponding data, and use it for optimising and improving the fitting process.