Abstract:
Provided is a method for operating an electronic component mounting system including component storages including a keeping rack, a dry box and a dryer. The method includes, after a reel of a moisture sensitive device is dispatched from a component keeping area and setup to a tape feeder is performed in an external setup area, measuring a exposure time for which the moisture sensitive device is in an atmospheric exposure state is in a reel unit, and comparing the exposure time with an exposure limit time set for the moisture sensitive device and stored in a storage. The method includes stopping using the reel of the moisture sensitive device whose exposure time exceeds the exposure limit time.
Abstract:
A production activity support system for supporting production activity in a component mounting system, comprises: a production information acquirer obtaining production information including a production plan of a production operation executed in the component mounting system and production performance information; a storage storing maintenance relevant information regarding execution history information indicating a history of the maintenance work executed on each of the maintenance targets; a maintenance work plan creation unit creating a work plan of the maintenance work executed on at the maintenance targets; and a display displaying a notification that the maintenance work indicated by the work plan created by the maintenance work plan creation unit is executed at the set maintenance execution date and time along with the production plan.
Abstract:
Necessary unit data indicative of the type and number of equipment units used in component mounting operation is obtained on the basis of production plan data, mounting data, and component library for each of production lots in advance. New allocation processing for allocating an equipment unit necessary for production execution of a new production lot to be newly produced on an electronic component mounting line for the new production lot on the basis of the necessary unit data is executed, and component reservation processing for registering the allocation result as the inventory data is conducted by a unit reservation unit.
Abstract:
Necessary component data indicative of the type and number of electronic components used in component mounting operation is obtained on the basis of production plan data, and mounting data in advance for each of production lots in advance. New allocation processing for allocating an electronic component necessary for production execution of a new production lot to be newly produced on an electronic component mounting line for the new production lot on the basis of the necessary unit data is executed, and component reservation processing for registering the allocation result in question as the inventory data is conducted by a unit reservation unit.