摘要:
Necessary unit data indicative of the type and number of equipment units used in component mounting operation is obtained on the basis of production plan data, mounting data, and component library for each of production lots in advance. New allocation processing for allocating an equipment unit necessary for production execution of a new production lot to be newly produced on an electronic component mounting line for the new production lot on the basis of the necessary unit data is executed, and component reservation processing for registering the allocation result as the inventory data is conducted by a unit reservation unit.
摘要:
Provided are a component replenishment support method, and a component replenishment support system of a component mounting line that are capable of preventing a decrease in facility operation rate due to component shortage, in which a component shortage time of each part feeder is predicted, a component replenishment work is started from the present time in a case where the component shortage time is earlier than the virtual work end time, a work end time of the work target selection feeders in sequence of early time by using the part feeder within the warning consideration start time as a target is predicted, and a worker is warned of the component replenishment to the selection feeder of which the work end time is within the warning start time, in a case where the selection feeder of which the component shortage time is earlier than the work end time is not present.
摘要:
Provided is a method for operating an electronic component mounting system including component storages including a dry box. The method includes maintaining a material management table including a whereabouts information field for indicating whether an electronic component is stored in the dry box, a target indicator field for indicating whether an electronic component is a moisture management target component, and an exposure time field for indicating an exposure time during the moisture management target component has been in an atmospheric exposure state. The method also includes pausing counting the exposure time when the moisture management target component is stored in the dry box, identifying a moisture management target component of which the exposure time has met or exceeded an exposure limit time based on the whereabouts information table, and notifying the identified moisture management target component to an apparatus.
摘要:
Provided is a method for operating an electronic component mounting system including component storages including a dry box. The method includes maintaining a material management table including a whereabouts information field for indicating whether an electronic component is stored in the dry box, a target indicator field for indicating whether an electronic component is a moisture management target component, and an exposure time field for indicating an exposure time during the moisture management target component has been in an atmospheric exposure state. The method also includes pausing counting the exposure time when the moisture management target component is stored in the dry box, identifying a moisture management target component of which the exposure time has met or exceeded an exposure limit time based on the whereabouts information table, and notifying the identified moisture management target component to an apparatus.
摘要:
After a reel of a Moisture Sensitive Device is dispatched from a component keeping area and setup to a tape feeder is performed in an external setup area, exposure time for which the Moisture Sensitive Device is in an atmospheric exposure state is timed in a reel unit, and the exposure time is compared with exposure limit time set for the Moisture Sensitive Device and stored in a storage part. An electronic component mounting apparatus equipped with the reel of the Moisture Sensitive Device whose exposure time exceeds the exposure limit time is specified, and work by the apparatus is stopped.
摘要:
An electronic component mounting system includes: mounting line management apparatuses disposed in each of mounting lines and an integrated management apparatus connected to the mounting line management apparatuses. The integrated management apparatus includes a first collation unit which performs collation of an electronic component based on identification information for identifying the electronic component. The mounting line management apparatus includes a second collation unit which performs collation of the electronic component. When the identification information is read out by the identification information reading-out unit, the collation of the electronic component is performed by the first collation unit if the mounting line management apparatus can access the integrated management apparatus, and the collation of the electronic component is performed by the second collation unit if the mounting line management apparatus cannot access the integrated management apparatus.
摘要:
Provided are a component replenishment support method, and a component replenishment support system of a component mounting line that are capable of preventing a decrease in facility operation rate due to component shortage, in which a component shortage time of each part feeder is predicted, a component replenishment work is started from the present time in a case where the component shortage time is earlier than the virtual work end time, a virtual work end time of the work target selection feeders in a case where the work is assumed to be performed in sequence of early time by using the part feeder within the warning consideration start time as a target is predicted, and a worker is warned of a man-hour lack to the selection feeder, in a case where the selection feeder of which the component shortage time is earlier than the work end time is present.
摘要:
Necessary component data indicative of the type and number of electronic components used in component mounting operation is obtained on the basis of production plan data, and mounting data in advance for each of production lots in advance. New allocation processing for allocating an electronic component necessary for production execution of a new production lot to be newly produced on an electronic component mounting line for the new production lot on the basis of the necessary unit data is executed, and component reservation processing for registering the allocation result in question as the inventory data is conducted by a unit reservation unit.
摘要:
An electronic component mounting system stores: manufacturing plan data for each manufacturing lot; unit management data including use permission information indicating a use permission status of an equipment unit; and inventory data indicating a stock status of the equipment units. In a unit reservation processing, new allocation processing is performed for allocating an equipment unit necessary for manufacture of a new manufacturing lot to an equipment unit for a new manufacturing lot, and an allocation result is registered. The system determines whether an equipment unit of an allocation subject in the new allocation processing can be allocated to an equipment unit for the new manufacturing lot by referring to use permission information of the equipment unit, and if the equipment unit is determined as being usable, the unit reservation processing is performed.
摘要:
An electronic component mounting system stores: manufacturing plan data for each manufacturing lot; unit management data including use permission information indicating a use permission status of an equipment unit; and inventory data indicating a stock status of the equipment units. In a unit reservation processing, new allocation processing is performed for allocating an equipment unit necessary for manufacture of a new manufacturing lot to an equipment unit for a new manufacturing lot, and an allocation result is registered. The system determines whether an equipment unit of an allocation subject in the new allocation processing can be allocated to an equipment unit for the new manufacturing lot by referring to use permission information of the equipment unit, and if the equipment unit is determined as being usable, the unit reservation processing is performed.