CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD

    公开(公告)号:US20230322522A1

    公开(公告)日:2023-10-12

    申请号:US18329983

    申请日:2023-06-06

    CPC classification number: B66B11/0045

    Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway formed in a building, the hoistway comprising at least one hoistway opening leading in horizontal direction out from the hoistway, the opening being delimited by a lower edge structure and an upper edge structure; and a load in the hoistway lower than said opening; and a hoisting arrangement for hoisting said load, wherein said hoisting arrangement comprises a support structure mounted higher than said load; and a hoisting device; and at least one flexible tension member connected or at least connectable to said load; wherein the at least one flexible tension member is movable with said hoisting device in particular for thereby transmitting a hoisting force to said load to be hoisted. Said support structure comprises an anchoring beam structure comprising a lower end engaging the lower edge structure, and an upper end engaging the upper edge structure; and a support beam structure connected to the anchoring beam structure and protruding from the anchoring beam structure into the hoistway; and wherein said at least one flexible tension member hangs in the hoistway supported by the support beam structure. The invention also relates to a method implementing the construction arrangement.

    ELEVATOR ARRANGEMENT TO OPEN THE ROOF OF AN ELEVATOR CAR

    公开(公告)号:US20190119072A1

    公开(公告)日:2019-04-25

    申请号:US16220290

    申请日:2018-12-14

    Abstract: The invention relates to an elevator arrangement comprising an elevator with a control system, and an inspection or maintenance mode, which elevator further comprises an elevator car arranged to run up and down in an elevator shaft along its guide rails, and which elevator car is equipped with a roof and a car operating panel. The arrangement comprises actuating means to open the roof of the elevator car, which actuating means are operatively connected to the car operating panel of the elevator.

    METHOD IN THE MANAGEMENT OF DATA RELATING TO AN ELEVATOR
    27.
    发明申请
    METHOD IN THE MANAGEMENT OF DATA RELATING TO AN ELEVATOR 审中-公开
    管理与电梯相关的数据的方法

    公开(公告)号:US20150158699A1

    公开(公告)日:2015-06-11

    申请号:US14622159

    申请日:2015-02-13

    CPC classification number: B66B5/0087 B66B19/00 B66B19/007

    Abstract: A method in the management of data relating to an elevator structure is provided, wherein data is collected about the structures of the elevator, and the collected data is recorded in memory. In the method, a database is formed about a plurality of known devices of elevators, said database including device-specific information, the structures of an elevator are scanned with scanning apparatus, which collects scanning data relating to the shape of the structures being scanned and/or the surface patterning of the structures, the scanning data is compared to the data of the aforementioned database, the type and/or mark of the device of an elevator are deduced if a correspondence to the scanning data is found from the aforementioned database, the type and/or mark of the aforementioned device is linked to form at least a part of the data that is in the database and is linked to the elevator-identification of the elevator in question, which database comprises a plurality of elevator-identifications and the data of an identified elevator connected to each elevator-identification

    Abstract translation: 提供了一种管理与电梯结构有关的数据的方法,其中收集关于电梯结构的数据,并将收集的数据记录在存储器中。 在该方法中,形成关于电梯的多个已知装置的数据库,所述数据库包括装置专用信息,电梯的结构用扫描装置扫描,扫描装置收集与被扫描结构的形状有关的扫描数据, /或结构的表面图案化,扫描数据与上述数据库的数据进行比较,如果从上述数据库发现与扫描数据的对应关系,则推导出电梯的设备的类型和/或标记, 上述设备的类型和/或标记被链接以形成在数据库中的数据的至少一部分并被链接到所讨论的电梯的电梯标识,该数据库包括多个电梯标识和 连接到每个电梯标识的识别电梯的数据

    METHOD FOR INSTALLATION OF ROPING OF AN ELEVATOR AND ELEVATOR ARRANGEMENTS

    公开(公告)号:US20250011134A1

    公开(公告)日:2025-01-09

    申请号:US18891147

    申请日:2024-09-20

    Abstract: A method and arrangement for installation of roping of an elevator. The method comprises providing at least one rope, providing an elevator car comprising first and second rope clamps, routing the at least one rope to the elevator car and attaching to the first rope clamp(s), so that there is an extra length of the at least one rope extending past the first rope clamp(s), driving the elevator car to proximity of a motor pulley and installing the extra length on the motor pulley, attaching the extra length to the second rope clamp(s), releasing the at least one rope from the first rope clamp(s), driving the elevator car to a lower part of the elevator shaft, the ropes being attached to the second rope clamp(s), installing a length of the ropes including the extra length on a counterweight pulley, attaching extra length back to the elevator car, installing second end sections of the at least one rope to car pulleys arranged in the elevator car, attaching the second end sections to the elevator car, driving the elevator car to the upper part of the elevator shaft, and fixing the first rope ends and second rope ends to rope fixing(s) arranged in the upper part of the elevator shaft.

    ELEVATOR CONSTRUCTION ARRANGEMENT AND A METHOD

    公开(公告)号:US20240417220A1

    公开(公告)日:2024-12-19

    申请号:US18817026

    申请日:2024-08-27

    Abstract: An elevator construction arrangement comprises: a first hoistway in a building, a first elevator car, a first counterweight, car guide rails for guiding the first car, and counterweight guide rails for guiding the first counterweight, a first elevator hoisting machine and a first suspension roping arranged to suspend the first elevator car and the first counterweight during construction time use, a protection deck mounted within the first hoistway during a first elevator installation in a bottom section of the first hoistway, a hoist device for hoisting a working platform, the hoist device preferably comprises a man riding hoist attachable to the first car or to an installation platform, and a hoist rope attachable to the first car or the installation platform and movable with the hoist device, and a first hoisting point configured to support the working platform via the hoist device and the hoist rope. During a first elevator installation in the bottom section of the first hoistway the first hoisting point is configured to be mounted to the protection deck and the working platform guided on the car guide rails is configured to be used as an installation platform in the bottom section of the first hoistway, and after the first elevator installation, the first car is in construction time use configured to be moved in the bottom section of the first hoistway by the first elevator hoisting machine which is installed at a top of the bottom section of the first hoistway and supported by the car guide rail, the first elevator hoisting machine suspending the first car and the first counterweight together with the first suspension roping, while the first hoisting point and the hoist device are removed from the first hoistway. A method for installing an elevator during construction of a building.

    ELEVATOR CONTROL
    30.
    发明公开
    ELEVATOR CONTROL 审中-公开

    公开(公告)号:US20240010461A1

    公开(公告)日:2024-01-11

    申请号:US18472712

    申请日:2023-09-22

    Abstract: According to an example embodiment, an elevator control system is provided, the elevator control system comprising an elevator controller for controlling movement of one or more elevators of an elevator transport system between one or more floors of a building under construction; and a scheduling system for maintaining a transport reservation schedule pertaining to said one or more elevators, wherein the transport reservation schedule comprises one or more transport reservations that comprise at least a first transport reservation that defines at least a first reserved transport time period, a first origin floor, and a first activation code, wherein the elevator controller is arranged to: control an elevator allocated to serve the first transport reservation to arrive at the first origin floor by the beginning of the first transport time period, and control, during the first reserved transport time period, said elevator allocated to serve the first transport reservation to move to a destination floor in response to receiving an activation code that matches the first activation code.