Method for producing a hollow body provided with a stand ring by blow
moulding
    21.
    发明授权
    Method for producing a hollow body provided with a stand ring by blow moulding 失效
    通过吹塑成形设置有支架环的中空体的制造方法

    公开(公告)号:US4769206A

    公开(公告)日:1988-09-06

    申请号:US937344

    申请日:1986-12-03

    IPC分类号: B29C49/54 B29C49/16 B29C49/30

    摘要: In a blow mould firstly a convexly formed bottom is blown. An intermediate region lying between an axially displaceable bottom mould and the blow mould bears on mould portions which on introduction of the bottom mould are pivoted back for turning back the bottom region to form a stand ring and release the path for the bottom mould which is finally positioned on the blow mould so that a closed mould cavity is formed on which the transformed bottom region can be reliably applied by blow pressure.

    摘要翻译: 首先,在吹塑模具中,吹制凸形的底部。 位于可轴向移动的底模和吹塑模之间的中间区域承载在模具部分上,在底部模具的引入时,底部模具被枢转以用于转回底部区域以形成支架环并释放底部模具的路径, 定位在吹塑模具上,从而形成封闭的模腔,通过吹气压力可以在其上可靠地施加变形的底部区域。

    Apparatus for manufacturing reinforcements
    24.
    发明授权
    Apparatus for manufacturing reinforcements 失效
    用于制造加强件的装置

    公开(公告)号:US4789010A

    公开(公告)日:1988-12-06

    申请号:US46897

    申请日:1987-05-07

    IPC分类号: B21F27/20 B28B23/02 B21F15/00

    摘要: The invention relates to an apparatus for producing reinforcements, intended for construction purposes, of reinforced concrete plates for prefabricated ceilings, without manual aid. The apparatus comprises a straightening and cutting device 1 for the transverse rods 22 of the reinforcement having a transverse rod outlet path 4, a displacement apparatus 46 and a transverse rod magazine 7; a straightening, cutting and bending device 2 for the longitudinal rods 23 having a longitudinal rod outlet path 5; and a combination device 3 for producing the lattice girders 24, having a lattice girder outlet path 6 and a lattice girder magazine 8. With the aid of the transverse rod magazine 7 and two insertion robots 9 and 10 that are displaceable on rails 67, the reinforcement can be inserted and positioned under electronic control into the form 18 that is arranged on a pallet 15 and is moved through the apparatus on a travel path 13. A slip-on device 29 serving to slip spacers 30 onto the transverse rods 22 is disposed between the straightening and cutting device 1 and the transverse rod outlet path 4. The entire reinforcement is made from round wires and bands of structural steel wound into rings.

    摘要翻译: 本发明涉及一种用于生产用于预制制天花板的钢筋混凝土板,用于建造目的的加固装置,无需手动辅助装置。 该装置包括一个矫直切割装置1,用于加强件的横杆22具有横杆出口路径4,位移装置46和横杆仓7; 具有纵向杆出口路径5的纵向杆23的矫直切割和弯曲装置2; 以及用于制造格栅梁24的组合装置3,其具有格栅梁出口路径6和格栅箱8。借助横向杆仓7和可在轨道67上移动的两个插入机器人9和10, 可以将加强件插入并定位在电子控制下形成布置在托盘15上的形式18,并且在行进路径13上移动通过设备。布置用于将间隔件30滑动到横杆22上的滑动装置29 矫直切割装置1和横杆出口路径4之间。整个加强件由缠绕成环的圆形线和结构钢带制成。