-
31.
公开(公告)号:US20230168404A1
公开(公告)日:2023-06-01
申请号:US17993050
申请日:2022-11-23
Inventor: Ka-Hyun PARK , Jin-Tae HAN , Youngno YOON
IPC: G01V1/30 , G06V10/764 , G06V10/44
CPC classification number: G01V1/30 , G06V10/764 , G06V10/454
Abstract: The present invention relates to a system and method for automatically storing boring logs information using artificial intelligence. The present invention can make a database of boring logs with high reliability without input errors by training a classification model using various forms of boring logs in advance by using artificial intelligence, identifying a form of a boring log to be actually stored in a database using the classification model when the boring log is input, and then extracting data from the boring log according to the identified form.
-
公开(公告)号:US20230133151A1
公开(公告)日:2023-05-04
申请号:US17912023
申请日:2021-03-16
Inventor: Hyun-Bon KOO , Jong-Won KWARK , Seong-Jun KIM
Abstract: Provided is a photocatalytic air-conditioning filter module, which is applied to a target space, including a first casing partition wall part having lattice-shaped spaces where photocatalytic balls are positioned, a second casing partition wall part connected to a rear end of the first casing partition wall part and having lattice-shaped spaces positioned to be staggered with respect to the lattice-shaped spaces of the first casing partition wall part, the photocatalytic balls accommodated in the lattice-shaped spaces of the first and second casing partition wall parts, a first cover configured to cover a front surface of the first casing partition wall part and prevent the photocatalytic balls from separating from the first casing partition wall part, and a second cover configured to cover a rear surface of the second casing partition wall part and prevent the photocatalytic balls from separating from the second casing partition wall part.
-
公开(公告)号:US11358894B2
公开(公告)日:2022-06-14
申请号:US17271517
申请日:2018-12-27
Inventor: Choon Man Jang , Sang Moon Lee
IPC: C02F11/04 , B01F23/23 , B01F23/20 , B01F25/60 , B01D53/78 , B01D53/14 , B01F23/231 , B01F101/00
Abstract: The present invention relates to a micro-bubble pump apparatus for a water treatment, and the micro-bubble pump apparatus for a water treatment comprises: a motor for generating rotatory power; and a micro-bubble pump connected to the motor and for mixing a feed liquid which flows into one side thereof and a feed gas which is injected into the other side thereof.
-
公开(公告)号:US11351518B2
公开(公告)日:2022-06-07
申请号:US16548085
申请日:2019-08-22
Inventor: Sung Won Kang , Young Sug Kim , Yoon Suhn Chung , Dae Min Oh , Bok Seong Kim , Sol Kim
IPC: C02F1/28 , B01J20/00 , B01J20/22 , G21F9/12 , B01J20/26 , B01J20/24 , B01J20/12 , B01J20/28 , B01J20/32 , B01J20/20
Abstract: Provided herein is a cesium adsorbent including: a support modified to have a carboxyl group on a surface thereof; and Prussian blue synthesized on the surface of the modified support, wherein the Prussian blue is at least partially chemically bound with the surface of the support. The cesium adsorbent may effectively adsorb cesium, which is a radioactive element released into the water and may be easily prepared using a simple solution process.
-
公开(公告)号:US20220135088A1
公开(公告)日:2022-05-05
申请号:US17110325
申请日:2020-12-03
Inventor: Gum Sung RYU , Byung Suk KIM , Kyung Taek KOH , Jae Joon SONG , Jae Yoon KANG , Jong Dae BAEK , Gi Hong AN
IPC: B61B13/08 , C04B14/38 , C04B16/06 , C09J121/02 , E01B25/30
Abstract: The present invention provides a crack repair material of a concrete vacuum tube segment using ultra-high performance concrete (UHPC) for a hyper-speed transportation system and a crack repairing method for the same capable of, in a case in which a vacuum tube segment of a hyper-speed transportation system, such as the Hyperloop, is manufactured using UHPC, repairing cracks formed in the UHPC vacuum tube segment easily and conveniently using a crack growth prevention material and a patch repair material and capable of immediately repairing cracks formed in the UHPC vacuum tube segment to secure airtightness so that operation of a vacuum pump is minimized and overload of the vacuum pump is prevented.
-
公开(公告)号:US11203851B2
公开(公告)日:2021-12-21
申请号:US16616948
申请日:2019-09-26
Inventor: Young Chan You , Ki Sun Choi , Hyun Jee Lee
Abstract: The present invention relates to a foundation reinforcing apparatus using a bracing-type supporting structure and a lateral prestressing device and a foundation reinforcing method using the same, wherein, in the foundation reinforcement used for remodeling construction that requires an extension of a building such as an apartment, the foundation reinforcing apparatus introduces lateral pre-stressing force into a bracing-type supporting structure to introduce a preloading load to a new pile of a new footing by using an upper supporting plate, which is connected to an existing vertical part and an existing slab, as a reaction bed and allows the new pile to share a load applied before and after the extension of the building so that reinforcement efficiency is increased, and thus construction is performed economically.
-
37.
公开(公告)号:US20210383712A1
公开(公告)日:2021-12-09
申请号:US17287832
申请日:2019-11-28
Applicant: KOREA INSTITUTE OF CIVIL ENGINEERING AND BUILDING TECHNOLOGY , DOONA INFORMATION & TECHNOLOGY CO,. LTD. , KANG NUNG CONSTRUCTION CO., LTD.
Inventor: Soon Wook CHOI , Soo Ho CHANG , Chulho LEE , Seungchul DO , Jung Hyi KIM , Kwang Eun CHO , Seung Yun LEE
Abstract: According to the present invention, a TBM operation simulation equipment includes: a server 100 in which education information a is stored; and an instruction client unit 200. According to the present invention, it is possible to improve the TBM operation capability of TBM drivers and trainees by providing a TBM simulation environment in which the construction environment is realistically simulated.
-
公开(公告)号:US20210302160A1
公开(公告)日:2021-09-30
申请号:US16979791
申请日:2019-11-29
Inventor: Ki Seok KWAK , Jae Hyun PARK , Moon Kyung CHUNG , Seung Hwan SEO , Young Hun KO , Bongkun KWAK
Abstract: Provided is an apparatus for measuring a slope change amount of a structure, the apparatus being characterized by including: a bottom body (100) formed in a spherical surface having a predetermined radius of curvature; a ball (200) installed on an upper surface of the bottom body (100) and moving due to a gravitational force; and a camera (300) for imaging the bottom body (100) on which the ball (200) is located. In accordance with the present invention, there is an effect in that a slope change amount of a structure for a certain period may accurately be measured.
-
公开(公告)号:US20210148062A1
公开(公告)日:2021-05-20
申请号:US16853694
申请日:2020-04-20
Inventor: Hyeong Yeol KIM , Jeong Hee Nam
Abstract: Provided are a textile-reinforced concrete road paving apparatus and a method of repairing concrete road pavement using the same. The textile-reinforced concrete road paving apparatus can minimize use of construction equipment by using the textile-reinforced concrete road paving apparatus integrally formed to consecutively cut concrete, dispose a reinforcement material, and construct a repaired cross section so as to reduce a construction period, thereby remarkably reducing construction costs. Further, a textile grid reinforcement material, which is a noncorroding reinforcement material, is applied to form the repaired cross section of the concrete road pavement so as to prevent concrete from being detached due to corrosion. Further, a textile reinforced grid is precisely disposed at a required position, and thus the thicknesses of the primary and secondary concrete pavement are precisely adjusted, and thus construction precision can be increased.
-
40.
公开(公告)号:US20200263369A1
公开(公告)日:2020-08-20
申请号:US16649978
申请日:2017-12-11
Inventor: Kyung Taek KOH , Gum Sung RYU , Gi Hong AN , Byung Suk KIM , Sung Yong PARK
Abstract: The present invention relates to a method of batch-casting high-fluidity high performance concrete and low-fluidity high performance concrete, wherein the method is capable of batch-casting high-fluidity high performance concrete for forming a girder portion of a bridge and low-fluidity high performance concrete for forming a deck plate portion of the bridge by using a concrete casting apparatus. Accordingly, the construction cost can be reduced and the construction period can be shortened. In addition, because a cold joint does not occur, durability can be improved, and thus the life of the bridge can be increased.
-
-
-
-
-
-
-
-
-