-
公开(公告)号:US10317868B2
公开(公告)日:2019-06-11
申请号:US14773403
申请日:2014-01-25
Applicant: ABB TECHNOLOGY AG
Inventor: Ben Schroeter , Fan Dai , Hao Ding , Mario Hoernicke , Nicolas Mauser , Peter Weber
IPC: G06F19/00 , G05B19/048 , G05B19/418
Abstract: A system for testing a distributed control system of an industrial plant is provided. The distributed control system includes at least two industrial control devices and at least one data communication device. The system includes at least one engineering computer that includes an engineering data storage unit for storing engineering data of at least one part of the distributed control system, and at least one human machine interface for manipulating the engineering data. The system also includes at least one remote data processing server connected to the at least one engineering computer via a remote data connection and including an emulating virtual machine on which a soft emulator is installed for emulating one of the at least two industrial control devices and the at least one data communication device.
-
公开(公告)号:USD842239S1
公开(公告)日:2019-03-05
申请号:US29589439
申请日:2016-12-30
Applicant: ABB Technology AG
Designer: Robert Bruining
-
公开(公告)号:USD837751S1
公开(公告)日:2019-01-08
申请号:US29634676
申请日:2018-01-24
Applicant: ABB Technology AG
Designer: Carlo Boffelli , Luciano Chenet , Marco Riva , Roberto Penzo , Eric Bevilacqua
-
公开(公告)号:US10148618B2
公开(公告)日:2018-12-04
申请号:US15175100
申请日:2016-06-07
Applicant: ABB Technology AG
Inventor: Danurahardjo Tjahjono , Prabhat Regmi
IPC: H04L29/06 , H04L12/707 , H04L12/931 , H04L29/08 , H04L12/46 , H04L12/741
Abstract: One or more techniques and/or systems are provided for network isolation. For example, nodes within a mesh of devices may be configured with routing rules, main routing tables, and alternative routing tables, such as at a layer-3 network layer. The routing rules may specify that packets received from downstream are to be routed upstream to either a gateway or a backhaul device for evaluation as to whether such packets are allowed to be communicated back downstream to destination recipients using main routing tables. An isolation rule may be configured to specify whether to block or allow packets. In an example, the gateway may either block or allow packets based upon whether a source and destination are within a same virtual local area network or are within different virtual local area networks. In this way, selective device isolation may be provided, such as at the layer-3 network layer.
-
公开(公告)号:US10101755B2
公开(公告)日:2018-10-16
申请号:US15176018
申请日:2016-06-07
Applicant: ABB Technology AG
Inventor: Mikko Myller , Kimmo Kohvakka
Abstract: An electrical assembly comprising a first control system adapted to control a power conversion system, a sensor system adapted to detect conditions relating to the first control system, the conditions comprising temperature and/or humidity, and a heating system adapted to heat the first control system of the electrical assembly. The electrical assembly further comprises a second control system which is adapted to receive information from the sensor system and in connection with turning on the electrical assembly to selectively turn on the first control system and/or the heating system based on conditions relating to the first control system.
-
公开(公告)号:US10081029B2
公开(公告)日:2018-09-25
申请号:US13909579
申请日:2013-06-04
Applicant: ABB Technology AG
Inventor: Daniel Hermann , Wernfried Heinrich , Marcus Schnaubelt , Frederik Vandepitte
CPC classification number: B05B14/40 , B01D45/06 , B01D45/08 , B01D50/002 , B05B14/44
Abstract: The disclosure relates to a paint mist separating device, and a paint booth having a paint mist separating device. The paint mist separating device can include a tapered tube, and a collecting funnel with a funnel inlet and a funnel neck, into which the larger end of the tapered tube projects, wherein the funnel neck is provided for connection to a collecting tank for paint. The paint mist separating device can include a collecting hood, which is arranged opposite the funnel inlet and which has a paint mist inlet opening, into which a smaller end of the tapered tube opens, wherein an outlet gap is provided between the inlet opening of the collecting funnel and the collecting hood.
-
公开(公告)号:US10056740B2
公开(公告)日:2018-08-21
申请号:US14863461
申请日:2015-09-24
Applicant: ABB TECHNOLOGY AG
Inventor: Maik Hyrenbach
Abstract: TA gas cooler for a medium voltage switchgear assembly with a gas compartment, having a housing with a hollow body for accommodating the heated gas, which flows through the medium voltage switchgear assembly and is heated by at least one heat-generating current conductor, wherein the hollow body of the housing is divided at least partly in several parallel hollow bodies, which are shaped as fins.
-
公开(公告)号:US10046459B2
公开(公告)日:2018-08-14
申请号:US14941832
申请日:2015-11-16
Applicant: ABB Technology AG
Inventor: Jianjun Wang , Biao Zhang , Carlos Martinez , Carlos Winsor Morato
Abstract: Three-dimensional visual servoing for positioning a robot in an environment is facilitated. Three-dimensional point cloud data of a scene of the environment is obtained, the scene including a feature. The three-dimensional point cloud data is converted into a two-dimensional image, and a three-dimensional position of the feature is identified based on the two-dimensional image. An indication of the identified three-dimensional position of the feature is then provided.
-
399.
公开(公告)号:US10014690B2
公开(公告)日:2018-07-03
申请号:US15030795
申请日:2013-10-21
Applicant: ABB TECHNOLOGY AG
Inventor: Silvio Scaletti , Sauro Macerini , Claudio Guarducci , Leonardo Canacci
Abstract: A double-stage inverter apparatus for energy conversion systems (FIG. 1) and control method thereof, adapted to manage the operations of the on-board booster module so as to optimize the overall electrical efficiency of the system. Furthermore, the method according to the present invention allows the operations of said double-stage inverter to be managed when there is only one input channel, when there are multiple input channels called to operate both in parallel and also when there are multiple input channels called to operate independently from each other.
-
公开(公告)号:US09899810B2
公开(公告)日:2018-02-20
申请号:US14949917
申请日:2015-11-24
Applicant: ABB Technology AG
Inventor: Rahul Pawar
IPC: H02B1/56 , G06F1/20 , H05K5/00 , H05K7/20 , H02B13/025
CPC classification number: H02B1/565 , H02B13/025
Abstract: A switchgear enclosure includes a first circuit breaker compartment having an opening therein defining a first air outlet. A second circuit breaker compartment is adjacent to and vertically below the first circuit breaker compartment. A first door is associated with the first circuit breaker compartment and a second door is associated with the second circuit breaker compartment, with each door having an opening therein defining a door air inlet. A main bus compartment is adjacent to at least the second circuit breaker compartment and has an opening therein defining a second air outlet. An air passage fluidly connects the second circuit breaker compartment with the main bus compartment so that air entering through the door air inlet of the second door can flow into the main bus compartment via the air passage and flow out of the second air outlet.
-
-
-
-
-
-
-
-
-