SOLAR CELL AND METHOD OF FABRICATING THE SAME
    81.
    发明申请
    SOLAR CELL AND METHOD OF FABRICATING THE SAME 审中-公开
    太阳能电池及其制造方法

    公开(公告)号:US20090032094A1

    公开(公告)日:2009-02-05

    申请号:US12162260

    申请日:2007-01-26

    申请人: Satoshi Aoki

    发明人: Satoshi Aoki

    IPC分类号: H01L31/00 B32B37/02

    摘要: A light absorbing layer 3 and a buffer layer 4 are divided by removing the light absorbing layer and the buffer layer by a laser, a metal needle or the like, successively, laser anneal working is carried out by thermally melting an end portion by irradiating a laser to include the divided end portion to constitute the end portion which has been substantially vertical in an inclined shape. Thereby, a thickness of TCO laminated on the inclined end portion is substantially equal to a thickness of TCO formed at an upper face of the light absorbing layer.

    摘要翻译: 依次通过激光,金属针等去除光吸收层和缓冲层来分割光吸收层3和缓冲层4,通过将端部热照射进行热熔化来进行激光退火加工 激光器包括分开的端部以构成已经基本垂直于倾斜形状的端部。 由此,层叠在倾斜端部的TCO的厚度与形成在光吸收层的上表面的TCO的厚度基本相同。

    Data processing device designing method, data processing device designing apparatus, program and computer readable information recording medium
    82.
    发明授权
    Data processing device designing method, data processing device designing apparatus, program and computer readable information recording medium 失效
    数据处理装置设计方法,数据处理装置设计装置,程序和计算机可读信息记录介质

    公开(公告)号:US07447617B2

    公开(公告)日:2008-11-04

    申请号:US11018964

    申请日:2004-12-22

    IPC分类号: G06F17/50

    CPC分类号: G06F17/5045 G06F17/5022

    摘要: A method includes steps of calculating, for each predetermined operation included in a program, an execution time required when the operation is executed by a predetermined processor, or calculating, for each predetermined operation included in the program, a circuit size required when the operation is realized in a form of hardware according to a predetermined technology; and calculating, for the entirety of the predetermined program or operations corresponding to a part the entirety of the predetermined program, a total execution time required when the entirety of the predetermined program is executed by the predetermined processor, as a result of applying in sequence the required execution time, or calculating, for the entirety of the predetermined program or operations corresponding to a part the entirety of the predetermined program, a total circuit size required when the entirety of the predetermined program or programs corresponding to a part of the entirety of the predetermined program, as a result of applying in sequence the required circuit size.

    摘要翻译: 一种方法包括以下步骤:对于包括在程序中的每个预定操作,计算当由预定处理器执行操作所需的执行时间,或者对于包括在程序中的每个预定操作,计算操作所需的电路大小 根据预定技术以硬件形式实现; 并且对于与预定程序的整体的一部分相对应的预定程序或操作的整体,计算由预定处理器执行预定程序的整体所需的总执行时间,作为依次应用的结果 所需的执行时间或计算对应于预定程序的整体的一部分的预定程序或操作的整体,当整个预定程序或程序的整体的一部分相对应时,所需的总电路大小 作为依次应用所需电路尺寸的结果的预定程序。

    Chalcopyrite solar cell and method of manufacturing the same
    83.
    发明申请
    Chalcopyrite solar cell and method of manufacturing the same 审中-公开
    黄铜矿太阳能电池及其制造方法

    公开(公告)号:US20080216895A1

    公开(公告)日:2008-09-11

    申请号:US11802312

    申请日:2007-05-22

    摘要: A single unit cell (herein, referred to as “a unit cell”) is formed out of a lower electrode layer (Mo electrode layer) 2 formed on a substrate 1, a light-absorbing layer (CIGS LIGHT-ABSORBING LAYER) 3 including copper, indium, gallium, and selenium, a high-resistance buffer layer thin film 4 formed of InS, ZnS, CdS, and the like on the light-absorbing layer thin film, and an upper electrode thin film (TCO) 5 formed of ZnOAl and the like. In order to connect the unit cell, a part of a contact electrode 6 connecting the upper electrode and the lower electrode is formed to overlap with a dividing line of the lower electrode 2 formed by a first scribing.

    摘要翻译: 由形成在基板1上的下电极层(Mo电极层)2,光吸收层(CIGS遮光层)3形成单个电池单元(以下称为“单元电池”) 铜,铟,镓和硒,在光吸收层薄膜上由InS,ZnS,CdS等形成的高电阻缓冲层薄膜4,以及上部电极薄膜(TCO)5,其由 ZnOA1等。 为了连接单电池,连接上电极和下电极的接触电极6的一部分形成为与通过第一划线形成的下电极2的分界线重叠。

    Compound thin-film solar cell and process for producing the same
    84.
    发明申请
    Compound thin-film solar cell and process for producing the same 有权
    复合薄膜太阳能电池及其制造方法

    公开(公告)号:US20050236032A1

    公开(公告)日:2005-10-27

    申请号:US10509303

    申请日:2003-03-24

    申请人: Satoshi Aoki

    发明人: Satoshi Aoki

    摘要: A method of fabricating a thin-film compound solar cell having an n-type buffer layer formed therein for providing a heterojunction with a p-type compound semiconductor light absorbing layer formed on a back electrode by applying a chemical bath deposition (CBD) process using an aqueous solution for dipping the light absorbing layer to deposit particles on the surface thereof. In this process, the temperature of the solution is controlled from low to high to increase sizes of the particles to be deposited on the light absorbing layer so as to form the buffer layer which possesses a high optical transmittance, tight adherence to the light absorbing layer and conformity with the transparent electrode formed thereon even if it would be made of InS material generally possessing a small bandgap and hard to pass light of short wavelengths.

    摘要翻译: 一种制造其中形成有n型缓冲层的薄膜化合物太阳能电池的方法,用于通过使用化学浴沉积(CBD)方法使用形成在背面电极上的p型化合物半导体光吸收层来提供异质结,该方法使用 用于浸渍光吸收层以在其表面上沉积颗粒的水溶液。 在该过程中,溶液的温度从低到高控制以增加沉积在光吸收层上的颗粒的尺寸,从而形成具有高透光率的缓冲层,对光吸收层的紧密附着 并且与其上形成的透明电极一致,即使其由通常具有小带隙并且难以通过短波长的光的InS材料制成。

    Load supporting apparatus
    90.
    发明授权
    Load supporting apparatus 失效
    负载支撑装置

    公开(公告)号:US5350151A

    公开(公告)日:1994-09-27

    申请号:US959909

    申请日:1992-10-13

    申请人: Satoshi Aoki

    发明人: Satoshi Aoki

    摘要: Load such as a large screen TV set is supported with improved stability without losing mobility, by providing resilient members such as compression springs between the supporting fiat base whereon the TV set is mounted and plural load supporting bodies which are rollers held vertically movable to some extent. When a strong outside force is applied, for instance, the TV set is strongly pushed from its back, the front rollers are retracted by compression of the spring, thereby the front bottom edge of the console touches the floor and resisting force or reaction force against the fall down of the TV set much increases.

    摘要翻译: 支持诸如大屏幕电视机的负载,通过提供诸如压缩弹簧之类的弹性构件,其中安装有电视机的支撑平台和多个负载支撑体之间提供稳定性而不失去移动性,所述负载支撑体是可在一定程度上垂直移动的辊 。 当施加强大的外力时,例如,电视机从其后面被强力推动,前辊通过弹簧的压缩而缩回,从而控制台的前底边缘接触地板并抵抗力或反作用力抵抗 电视机的跌倒大大增加。