-
公开(公告)号:US12111510B2
公开(公告)日:2024-10-08
申请号:US18383605
申请日:2023-10-25
CPC分类号: G02B6/4488 , B23K26/24 , G02B6/443 , G02B6/4438 , G02B6/4485
摘要: Certain aspects of the present disclosure provide techniques for making armored cables. An example method for making an armored cable includes forming a strip stock into an armor tubing; welding a seam of the armor tubing in a welding zone; inserting at least one of a first optical fiber or a first wire into a first end of a first guide tube, wherein: the first guide tube extends through the welding zone; the first guide tube protects the at least one of the first optical fiber or the first wire during the welding of the seam; and the first guide tube is not part of the armored cable after the making of the armored cable; and supporting the first guide tube within the armor tubing by a plurality of support legs such that the first guide tube does not contact the armor tubing.
-
公开(公告)号:US12078025B2
公开(公告)日:2024-09-03
申请号:US17844467
申请日:2022-06-20
发明人: Travis Massey , Joshua V. Symms , Mike Bock
IPC分类号: E21B33/16
CPC分类号: E21B33/16
摘要: A multistage cementing assembly is used for cementing casing in a borehole. A subsurface tool on the casing holds a subsurface plug therein using a temporary retainer. The subsurface plug is located in a subsurface location below one or more stage tools or cementing collars on the casing. First stage cement passing down the casing can pass through a passage of the subsurface plug to flow out of a float valve. A wiper plug passed through the casing behind the cement is then engaged with the subsurface plug. Pressure buildup can release the two plugs as a unit from the temporary retainer. Before reaching the float valve, a deformable ring on the subsurface plug can engage in a locator ring on the casing to indicate the plug unit's location during operations. Eventually, additional stages can be cemented using the one or more stage tools uphole on the casing.
-
公开(公告)号:US12055010B2
公开(公告)日:2024-08-06
申请号:US17881037
申请日:2022-08-04
IPC分类号: E21B33/16
CPC分类号: E21B33/16
摘要: A cementing operation cements casing in a borehole. A bottom plug pumped down the casing ahead of cement lands at a float valve. Circulation of the cement is established through the bottom plug to a shoe track downhole from the float valve. A top plug pumped down the casing behind the cement lands on the bottom plug. An internal component of the float valve is released by building-up pressure in the casing behind the internal component up to a release threshold. The internal component can latch at the shoe. At least some of the cement in the shoe track is displaced from the casing's shoe to the borehole by pumping the plugs and the internal component to the shoe. With the cement displaced out of the shoe track, the time required to drill out the assembly can be greatly reduced.
-
4.
公开(公告)号:US11905825B2
公开(公告)日:2024-02-20
申请号:US17660753
申请日:2022-04-26
发明人: Omer Haldun Unalmis
IPC分类号: E21B47/107 , G01F1/66 , G01F1/74 , G01N33/28
CPC分类号: E21B47/107 , G01F1/666 , G01F1/74 , G01N33/2823
摘要: Methods and apparatus for hydrocarbon monitoring are provided. An example method (e.g., performed by a monitoring system) includes receiving one or more first downhole measurements including a first speed of sound (SoS) measurement of a flowing fluid at a first location, wherein a pressure of the flowing fluid at the first location is greater than a bubble-point pressure of the flowing fluid; receiving one or more second downhole measurements including a second SoS measurement of the flowing fluid at a second location, wherein a pressure of the flowing fluid at the second location is less than the bubble-point pressure of the flowing fluid and wherein the flowing fluid is a 3-phase fluid mixture at the second location; and calculating one or more phase flow rates of the 3-phase fluid mixture, based on the first SoS measurement, the second SoS measurement, and a measurement of a bulk velocity of the flowing fluid.
-
公开(公告)号:US11886024B2
公开(公告)日:2024-01-30
申请号:US16220162
申请日:2018-12-14
发明人: Thomas W. F. Engel
CPC分类号: G02B6/4248 , G02B6/2856 , G02B6/3816 , G02B6/3851 , G02B6/3855 , G02B6/3885 , Y10T156/1052 , Y10T156/1062
摘要: Methods and apparatus are provided for a monolithic multi-optical-waveguide penetrator or connector. One example apparatus generally includes a plurality of large diameter optical waveguides, each having a core and a cladding, and a body having a plurality of bores with the optical waveguides disposed therein, wherein at least a portion of the cladding of each of the optical waveguides is fused with the body, such that the apparatus is a monolithic structure. Such an apparatus provides for a cost- and space-efficient technique for feedthrough of multiple optical waveguides. Also, the body may have a large outer diameter which can be shaped into features of interest, such as connection alignment or feedthrough sealing features.
-
公开(公告)号:US11846277B2
公开(公告)日:2023-12-19
申请号:US17730492
申请日:2022-04-27
发明人: Kavan Graybill
CPC分类号: F04B47/022 , F04B17/006 , F04B17/02
摘要: A system for supplementing the electric power needed by a pump jack electric motor, thereby reducing the electric power purchased from the local utility or power supplier. The system comprises a solar photovoltaic system, or other forms of renewable energy, and regenerated power from the electric motor or drive. The system can be both “on-grid” and “off-grid.” Battery banks and capacitor banks may be used to store energy.
-
公开(公告)号:US11799410B2
公开(公告)日:2023-10-24
申请号:US17813703
申请日:2022-07-20
发明人: Mohammed S. Arefeen
CPC分类号: H02P27/06 , H02J7/0063
摘要: An electrical ride-through (ERT) unit is configured to apply a voltage to a drive circuit during disruptions of line voltage to the drive circuit. The ERT unit includes a capacitor on an ERT circuit that is prevented from applying the voltage to the drive circuit during normal operation of the drive circuit, and applies the voltage to the drive circuit during a voltage drop on the drive circuit.
-
公开(公告)号:US11643892B2
公开(公告)日:2023-05-09
申请号:US17580028
申请日:2022-01-20
IPC分类号: E21B23/01 , E21B33/128 , E21B33/129 , E21B29/00
CPC分类号: E21B23/01 , E21B33/128 , E21B33/1293 , E21B29/005
摘要: A method of separating a downhole tubular includes running a tool into a wellbore to a predetermined location on a work string and actuating flow actuated slips. The method also includes maintaining slips in a set position by providing a first upward force on the work string. The method further includes rotating the work string to separate an upper portion of the tubular from a lower portion using a cutter assembly disposed on the work string below the slips and pulling the upper portion of the tubing and the tool from the wellbore.
-
公开(公告)号:US11512439B2
公开(公告)日:2022-11-29
申请号:US17019663
申请日:2020-09-14
发明人: Michael Cook , Piet Nooren
IPC分类号: E01D15/12
摘要: A system and method transports a load across an expanse between first and second locations. The first and second locations can be on land and/or water and having a base surface of ground, waterbed, and/or vessel between them. The system includes supports, ramps, and a bridge assembly. The supports mounting on the base surface and are disposed on first and second sides of the expanse. The ramps mount on adjacent ones of the supports and/or on at least one the supports and the base surface. The bridge assembly has one or more longitudinal girders configured to extend parallel to one another across the expanse. Each girder has beams being modular and being hingedly connected end-to-end. Each girder has a first end supported on a first support, has a second end supported on a second support, and has an entire length between the ends that is self-supported. The entire self-supported length supports and transfers weight of the load to the ends supported on the supports. In this way, weight from the load is not transferred to a levee or the like in the expanse.
-
公开(公告)号:US12129718B1
公开(公告)日:2024-10-29
申请号:US18205197
申请日:2023-06-02
发明人: Micheal Bock
CPC分类号: E21B17/1078 , C23C4/16
摘要: A tubular is prepared for downhole use to include integrated centralizer feature disposed thereon. Blade elements are disposed about a surface of the tubular. An interconnection, such as a band, connected between the blade elements can be used to wrap them circumferentially about the tubular. The blade elements are then affixed to the surface of the tubular to produce the integrated centralizer features by coating a spray welding material over at least a portion of the plurality of blade elements and over at least an adjacent portion of the surface of the tubular. The blade elements can be hollow vanes or fins so they are collapsible when a restriction is encountered downhole to avoid a stuck pipe situation.
-
-
-
-
-
-
-
-
-