-
公开(公告)号:US08250816B2
公开(公告)日:2012-08-28
申请号:US12074264
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liui , Hui Chun Sheng , Yan Yu , He Hui Chen
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liui , Hui Chun Sheng , Yan Yu , He Hui Chen
摘要: A method for installing rig structure (e.g. cabin, house, a doghouse) on a drilling rig, the method including: connecting support apparatus to a substructure of a drilling rig, supporting a drilling floor; moving a movement apparatus supporting a rig structure to position it adjacent the support apparatus, by moving movement apparatus on ground adjacent the substructure, moving the support apparatus into a connecting orientation with respect to the structure; connecting raising apparatus to the structure, the raising apparatus connected to the support apparatus; raising the structure up to the drill floor with the raising apparatus; and securing the structure to the support apparatus. This abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
摘要翻译: 一种用于将钻机结构(例如,舱室,房屋,狗屋)安装在钻机上的方法,所述方法包括:将支撑装置连接到钻井平台的底部结构,支撑钻井底板; 移动支撑钻机结构的运动装置将其靠近支撑装置定位,通过将运动装置移动到邻近底部结构的地面上,将支撑装置移动到相对于结构的连接方位; 连接提升装置到结构,提升装置连接到支撑装置; 用提升装置将结构提升到钻台; 并将结构固定到支撑装置上。 提供此摘要是为了遵守规定要求摘要的规则,允许搜索者或其他读者快速确定技术信息的主题,并提交一个理解,即它不会用于解释或限制范围或含义 的权利要求,37 CFR 1.72(b)。
-
公开(公告)号:US20120047820A1
公开(公告)日:2012-03-01
申请号:US13148771
申请日:2010-04-20
申请人: Robert B. Donnally , Chunqiao Ren , Xi Lin Liu , Yan Yu , Peng Yue , Wei Wang
发明人: Robert B. Donnally , Chunqiao Ren , Xi Lin Liu , Yan Yu , Peng Yue , Wei Wang
CPC分类号: E21B15/00
摘要: Systems and methods for rig assembly and for erecting a mast of a rig and such systems with roller apparatus to facilitate movement of a mast section from a mover. In a first embodiment, the method includes erecting a rig mast section on a substructure, the substructure including a first substructure box spaced-apart from a second substructure box, the first substructure box comprising a first upper box above a first lower box and the second substructure box comprising a second upper box above a second lower box.
摘要翻译: 用于钻机组装和用于竖立钻机桅杆的系统和方法以及具有滚柱装置的这种系统以便于桅杆部分从动子移动。 在第一实施例中,该方法包括在子结构上架设钻机桅杆部分,所述子结构包括与第二子结构箱间隔开的第一子结构箱,所述第一子结构箱包括位于第一下部箱体上方的第一上部箱体, 子结构箱包括在第二下部箱上方的第二上部箱。
-
公开(公告)号:US08047303B2
公开(公告)日:2011-11-01
申请号:US12074232
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
IPC分类号: E21B15/00
CPC分类号: E21B7/02
摘要: Methods and systems for installing a drawworks on a drilling rig, the method, in certain aspects, including moving a drawworks on movement apparatus on the ground adjacent a drill floor of a rig, connecting the drawworks to the drill floor, moving the movement apparatus away from the rig, and raising the drill floor with the drawworks thereon using raising apparatus of a rig substructure supporting the drill floor. This abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
摘要翻译: 一种用于在绞车上安装绞车的方法和系统,所述方法在某些方面包括将靠近钻机钻台的地面上的移动装置上的绞车移动,将绞车连接到钻台上,将运动装置移开 并且使用支撑钻台的钻机底座的升高装置将其上的绞车提升钻地板。 提供此摘要是为了遵守规定要求摘要的规则,允许搜索者或其他读者快速确定技术信息的主题,并提交一个理解,即它不会用于解释或限制范围或含义 的权利要求,37 CFR 1.72(b)。
-
公开(公告)号:US20090218138A1
公开(公告)日:2009-09-03
申请号:US12074264
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liui , Hui Chun Sheng , Yan Yu , He Hui Chen
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liui , Hui Chun Sheng , Yan Yu , He Hui Chen
IPC分类号: E21B7/00
摘要: A method for installing rig structure (e.g. cabin, house, a doghouse) on a drilling rig, the method including: connecting support apparatus to a substructure of a drilling rig, supporting a drilling floor; moving a movement apparatus supporting a rig structure to position it adjacent the support apparatus, by moving movement apparatus on ground adjacent the substructure, moving the support apparatus into a connecting orientation with respect to the structure; connecting raising apparatus to the structure, the raising apparatus connected to the support apparatus; raising the structure up to the drill floor with the raising apparatus; and securing the structure to the support apparatus. This abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
摘要翻译: 一种用于将钻机结构(例如,舱室,房屋,狗屋)安装在钻机上的方法,所述方法包括:将支撑装置连接到钻井平台的底部结构,支撑钻井底板; 移动支撑钻机结构的运动装置将其靠近支撑装置定位,通过将运动装置移动到邻近底部结构的地面上,将支撑装置移动到相对于结构的连接方位; 连接提升装置到结构,提升装置连接到支撑装置; 用提升装置将结构提升到钻台; 并将结构固定到支撑装置上。 提供此摘要是为了遵守规定要求摘要的规则,允许搜索者或其他读者快速确定技术信息的主题,并提交一个理解,即它不会用于解释或限制范围或含义 的权利要求,37 CFR 1.72(b)。
-
公开(公告)号:US20090218144A1
公开(公告)日:2009-09-03
申请号:US12074258
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
摘要: Methods for connection parts of a mast of a drilling rig without using a crane or other lifting machine are disclosed. In certain aspects, these methods include moving parts of a mast to be assembled with trucks and positioning the parts with the trucks to facilitate their connection. This Abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
摘要翻译: 公开了一种不使用起重机或其他起重机械的钻机的桅杆的连接部件的方法。 在某些方面,这些方法包括用于与卡车组装的桅杆的移动部件并且使用卡车定位零件以便于它们的连接。 提供本摘要以符合要求抽象的规则,允许搜索者或其他读者快速确定技术披露的主题,并提交其理由是不会用于解释或限制范围或含义 的权利要求,37 CFR 1.72(b)。
-
公开(公告)号:US08549815B2
公开(公告)日:2013-10-08
申请号:US12074258
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
摘要: Methods for connection parts of a mast of a drilling rig without using a crane or other lifting machine are disclosed. In certain aspects, these methods include moving parts of a mast to be assembled with trucks and positioning the parts with the trucks to facilitate their connection. This Abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
-
公开(公告)号:US08468753B2
公开(公告)日:2013-06-25
申请号:US12074270
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
摘要: Systems and methods for erecting a drilling rig. This abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
-
公开(公告)号:US20090218137A1
公开(公告)日:2009-09-03
申请号:US12074232
申请日:2008-02-29
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
CPC分类号: E21B7/02
摘要: Methods and systems for installing a drawworks on a drilling rig, the method, in certain aspects, including moving a drawworks on movement apparatus on the ground adjacent a drill floor of a rig, connecting the drawworks to the drill floor, moving the movement apparatus away from the rig, and raising the drill floor with the drawworks thereon using raising apparatus of a rig substructure supporting the drill floor. This abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure and is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims, 37 C.F.R. 1.72(b).
摘要翻译: 一种用于在绞车上安装绞车的方法和系统,所述方法在某些方面包括将靠近钻机钻台的地面上的移动装置上的绞车移动,将绞车连接到钻台上,将运动装置移开 并且使用支撑钻台的钻机底座的升高装置将其上的绞车提升钻地板。 提供此摘要是为了遵守规定要求摘要的规则,允许搜索者或其他读者快速确定技术信息的主题,并提交一个理解,即它不会用于解释或限制范围或含义 的权利要求,37 CFR 1.72(b)。
-
公开(公告)号:US09441423B2
公开(公告)日:2016-09-13
申请号:US14016703
申请日:2013-09-03
申请人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
发明人: Robert Benjamin Donnally , Chunqiao Ren , Stuart Arthur Lyall McCurdy , Xi Lin Liu , Hui Chun Sheng , Yan Yu
摘要: A system for erecting a drilling rig mast includes a substructure having an open area that is defined therein by two laterally spaced-apart substructure sides and a first mast section that is adapted to be positioned at least partially within the open area of the substructure after the first mast section has been removably connected to the substructure. The system further includes, among other things, a second mast section that is adapted to be removably connected to the first mast section the said first mast section has been removably connected to the substructure, and a mast connection apparatus that is adapted to removably connect the second mast section to the first mast section when an upper end of the first mast section is raised relative to a lower end of the second mast section.
摘要翻译: 用于竖立钻机桅杆的系统包括具有通过两个横向间隔开的子结构侧限定在其中的开放区域的子结构,以及第一桅杆部分,其适于至少部分地位于所述子结构的开放区域内 第一桅杆段已经可拆卸地连接到子结构。 该系统还包括第二桅杆部分,其适于可移除地连接到第一桅杆部分,所述第一桅杆部分已经可移除地连接到基础结构;以及桅杆连接装置,其适于可拆卸地连接 当第一桅杆部分的上端相对于第二桅杆部分的下端升高时,第二桅杆部分到达第一桅杆部分。
-
公开(公告)号:US08875911B2
公开(公告)日:2014-11-04
申请号:US13148771
申请日:2010-04-20
申请人: Robert B. Donnally , Chunqiao Ren , Xi Lin Liu , Yan Yu , Peng Yue , Wei Wang
发明人: Robert B. Donnally , Chunqiao Ren , Xi Lin Liu , Yan Yu , Peng Yue , Wei Wang
CPC分类号: E21B15/00
摘要: Systems and methods for rig assembly and for erecting a mast of a rig and such systems with roller apparatus to facilitate movement of a mast section from a mover. In a first embodiment, the method includes erecting a rig mast section on a substructure, the substructure including a first substructure box spaced-apart from a second substructure box, the first substructure box comprising a first upper box above a first lower box and the second substructure box comprising a second upper box above a second lower box.
摘要翻译: 用于钻机组装和用于竖立钻机桅杆的系统和方法以及具有滚柱装置的这种系统以便于桅杆部分从动子移动。 在第一实施例中,该方法包括在子结构上架设钻机桅杆部分,所述子结构包括与第二子结构箱间隔开的第一子结构箱,所述第一子结构箱包括位于第一下部箱体上方的第一上部箱体, 子结构箱包括在第二下部箱上方的第二上部箱。
-
-
-
-
-
-
-
-
-