Drilling rig masts and methods of assembly and erection
    2.
    发明授权
    Drilling rig masts and methods of assembly and erection 有权
    钻机桅杆和组装和架设方法

    公开(公告)号:US09441423B2

    公开(公告)日:2016-09-13

    申请号:US14016703

    申请日:2013-09-03

    摘要: A system for erecting a drilling rig mast includes a substructure having an open area that is defined therein by two laterally spaced-apart substructure sides and a first mast section that is adapted to be positioned at least partially within the open area of the substructure after the first mast section has been removably connected to the substructure. The system further includes, among other things, a second mast section that is adapted to be removably connected to the first mast section the said first mast section has been removably connected to the substructure, and a mast connection apparatus that is adapted to removably connect the second mast section to the first mast section when an upper end of the first mast section is raised relative to a lower end of the second mast section.

    摘要翻译: 用于竖立钻机桅杆的系统包括具有通过两个横向间隔开的子结构侧限定在其中的开放区域的子结构,以及第一桅杆部分,其适于至少部分地位于所述子结构的开放区域内 第一桅杆段已经可拆卸地连接到子结构。 该系统还包括第二桅杆部分,其适于可移除地连接到第一桅杆部分,所述第一桅杆部分已经可移除地连接到基础结构;以及桅杆连接装置,其适于可拆卸地连接 当第一桅杆部分的上端相对于第二桅杆部分的下端升高时,第二桅杆部分到达第一桅杆部分。

    Assembly positioning a crane on a platform installed in the sea
    3.
    发明授权
    Assembly positioning a crane on a platform installed in the sea 失效
    将起重机组装在安装在海上的平台上

    公开(公告)号:US4192110A

    公开(公告)日:1980-03-11

    申请号:US841372

    申请日:1977-10-12

    摘要: An assembly for positioning a crane mounted on a support and intended to overhang the platform of a platform structure having a base which rests on the bed of a body of water. The crane is located on the vertical axis of a column offset with respect to a central shaft which carries the platform. The assembly comprises a mobile shaft element contained in the upper part of the offset column and having a base with jacks or a block and tackle permitting its emergence as far as the upper level of the offset column. The lower face of the crane support carries a downwardly extending shaft element which has the same diameter as the mobile shaft element. The two shaft elements are substantially coaxial when the platform is carried on the central shaft so that they may be joined together and raised as a unit.

    摘要翻译: 一种用于定位安装在支撑件上并旨在悬挂在具有搁置在水体床上的基座的平台结构的平台上的起重机的组件。 起重机位于相对于承载平台的中心轴偏移的列的垂直轴上。 组件包括容纳在偏移列的上部中的移动轴元件,并且具有带有千斤顶的基座或具有允许其出现在偏移列的上部水平面上的块和滑块的基座。 起重机支撑件的下表面带有一个向下延伸的轴元件,该轴元件具有与移动轴元件相同的直径。 当平台承载在中心轴上时,两个轴元件基本上是同轴的,使得它们可以连接在一起并作为一个单元升高。

    Lifting device for building steel structure hoistway and method for building steel structure hoistway

    公开(公告)号:US11993485B2

    公开(公告)日:2024-05-28

    申请号:US17981048

    申请日:2022-11-04

    IPC分类号: B66B19/00 B66C23/30

    CPC分类号: B66B19/00 B66C23/30

    摘要: A lifting device for building a steel structure hoistway and a method for building a steel structure hoistway. The lifting device includes a lifting mechanism and a crane mechanism. The lifting mechanism includes a bottom platform, a middle platform and a top platform. The crane mechanism is arranged on the top platform of the lifting mechanism, and includes a base and a crane on the base. The base is arranged on the top platform and is rotatable relative to the top platform along a vertical axis, and the hanger frame of the crane is movable between a vertical orientation and an inclined orientation. The lifting mechanism is configured to ascend and descend in the constructed steel structure hoistway, and the crane mechanism is configured to lift building materials, such as steel beams, steel columns, etc., for use in building the steel structure hoistway to their designed installation locations.

    TOWER CRANE
    5.
    发明公开
    TOWER CRANE 审中-公开

    公开(公告)号:US20230339731A1

    公开(公告)日:2023-10-26

    申请号:US18308231

    申请日:2023-04-27

    摘要: The invention relates to a tower crane having a tower which carries a jib, from which a hoisting cable runs off, wherein a guying system is provided and runs, at least in part, along the tower and is spread out, by means of guy supports, in a direction transverse to the longitudinal center plane of the crane, this plane running through the tower and the jib, wherein at least one pair of guy supports which are spread out in a V-shaped manner are articulated on the tower, between the lower end of the latter and the jib.

    TELESCOPIC TOWER CRANE SYSTEM
    6.
    发明申请
    TELESCOPIC TOWER CRANE SYSTEM 审中-公开
    TELESCOPIC塔式起重机系统

    公开(公告)号:US20140144860A1

    公开(公告)日:2014-05-29

    申请号:US13685913

    申请日:2012-11-27

    IPC分类号: B66C23/16

    CPC分类号: B66C23/30

    摘要: A telescopic tower crane system has several tower layers of different outer diameters. Tower layers of smaller outer diameters are put inside the tower layers of larger outer diameters. Each of the tower layers consists of upstanding tower masts and crossbars connecting in between. The lower end of each of the tower masts has a lifting mechanism. Hoists are combined with the lifting mechanisms to lift the tower layers upward one by one from inside outward. The positioning mechanism at the lower end of each of the tower masts is positioned to the upper end of the adjacent tower mast. The crane tower is thus lifted to an extreme height and can lift heavy or long objects.

    摘要翻译: 伸缩塔式起重机系统具有不同外径的几个塔层。 较小外径的塔层放置在较大外径的塔层内。 每个塔层都由直立的塔架桅杆和连接在其间的十字架组成。 每个塔架的下端具有提升机构。 起重机与提升机构相结合,将塔层向内逐层向上提升。 每个塔架桅杆下端的定位机构位于相邻塔桅杆的上端。 因此,起重机塔被提升到极高,可以提起重物或长物体。

    LIFTING DEVICE FOR BUILDING STEEL STRUCTURE HOISTWAY AND METHOD FOR BUILDING STEEL STRUCTURE HOISTWAY

    公开(公告)号:US20240067503A1

    公开(公告)日:2024-02-29

    申请号:US17981048

    申请日:2022-11-04

    IPC分类号: B66B19/00 B66C23/30

    CPC分类号: B66B19/00 B66C23/30

    摘要: A lifting device for building a steel structure hoistway and a method for building a steel structure hoistway. The lifting device includes a lifting mechanism and a crane mechanism. The lifting mechanism includes a bottom platform, a middle platform and a top platform. The crane mechanism is arranged on the top platform of the lifting mechanism, and includes a base and a crane on the base. The base is arranged on the top platform and is rotatable relative to the top platform along a vertical axis, and the hanger frame of the crane is movable between a vertical orientation and an inclined orientation. The lifting mechanism is configured to ascend and descend in the constructed steel structure hoistway, and the crane mechanism is configured to lift building materials, such as steel beams, steel columns, etc., for use in building the steel structure hoistway to their designed installation locations.

    Enhanced stability crane and methods of use
    8.
    发明授权
    Enhanced stability crane and methods of use 有权
    增强稳定性起重机和使用方法

    公开(公告)号:US09266701B2

    公开(公告)日:2016-02-23

    申请号:US14346823

    申请日:2012-07-14

    摘要: An enhanced stability crane (100) is described. Embodiments include a telescoping main support mast (114) upon which a crane base (106) resides. A boom (140) projects upwardly from the crane base and a jib (148) typically projects upwardly from the boom. A clamping assembly (108) resides on the main support mast and is configured to attach to an existing structure adjacent to the crane, in order to enhance stability. Multiple clamping assemblies can be distributed along the telescoping main support mast when it is extended. The existing structure is generally a tower structure (180) that is columnar and vertical in shape and orientation, and frequently has an elliptical horizontal cross-section. Tower structures are typically, but not necessarily, wind turbine towers. In some embodiments, the crane is mobile capable of lifting objects weighing about 110 tons to a height of about 400 feet. The crane typically adjusts to a collapsed configuration, enabling facile transport.

    摘要翻译: 描述了一种增强的稳定性起重机(100)。 实施例包括伸缩主支撑杆(114),起重机基座(106)驻留在该主支撑杆上。 起重臂(140)从起重机基座向上突出,并且起重臂(148)通常从起重臂向上突出。 夹紧组件(108)位于主支撑杆上,并被构造成附接到与起重机相邻的现有结构,以便增强稳定性。 多个夹紧组件可以沿伸缩式主支撑杆延伸时分布。 现有的结构通常是塔形结构(180),其在形状和方向上是柱状和垂直的,并且通常具有椭圆形水平横截面。 塔式结构通常但不一定是风力涡轮机塔架。 在一些实施例中,起重机是移动的,能够将重约110吨的物体提升到约400英尺的高度。 起重机通常调整到收缩构型,从而实现便于运输。

    Self-Climbing Telescopic Crane and Method for Mounting Pre-Fabricated Concrete Towers
    9.
    发明申请
    Self-Climbing Telescopic Crane and Method for Mounting Pre-Fabricated Concrete Towers 审中-公开
    自爬式起重机和预制混凝土塔的安装方法

    公开(公告)号:US20150167342A1

    公开(公告)日:2015-06-18

    申请号:US14401788

    申请日:2013-05-17

    摘要: Self-climbing, telescopic crane and a method for mounting pre-fabricated concrete towers of the type formed by a plurality of modules joined laterally to form diverse frustroconical segments that are subsequently stacked to form the tower, that comprises an external vertical column and another internal one that can move vertically via actuators. The top part of the internal vertical column terminates in a horizontally rotatable capstan, associated with a horizontal arm terminating at the opposite end in a pulley through which the hoist cable moves. The invention presented affords the main advantage of allowing mounting from inside the tower, dispensing with the need of expensive long-reach cranes to be operating over long periods, with a notable reduction in the economic cost and the mounting time of the tower, as well as allowing mounting to be carried out in unfavourable wind conditions.

    摘要翻译: 自爬式起重机和一种用于安装由多个模块形成的预制混凝土塔的方法,所述多个模块横向连接以形成多个截头锥形段,随后堆叠形成塔架,其包括外部垂直柱和另一个内部 一个可以通过执行器垂直移动。 内部垂直柱的顶部终止于水平旋转的绞盘,其与水平臂相关联,水平臂终止于起重缆索移动的滑轮中的相对端。 本发明提供了允许从塔内部进行安装的主要优点,可以省去长时间运行昂贵的长距离起重机的需要,同时显着降低了塔的经济成本和安装时间 因为允许在不利的风力条件下进行安装。

    DRILLING RIG MASTS AND METHODS OF ASSEMBLY AND ERECTION
    10.
    发明申请
    DRILLING RIG MASTS AND METHODS OF ASSEMBLY AND ERECTION 审中-公开
    钻井钻机和组装和拆卸方法

    公开(公告)号:US20150059262A1

    公开(公告)日:2015-03-05

    申请号:US14016703

    申请日:2013-09-03

    IPC分类号: E21B15/00

    摘要: A system for erecting a drilling rig mast includes a substructure having an open area that is defined therein by two laterally spaced-apart substructure sides and a first mast section that is adapted to be positioned at least partially within the open area of the substructure after the first mast section has been removably connected to the substructure. The system further includes, among other things, a second mast section that is adapted to be removably connected to the first mast section the said first mast section has been removably connected to the substructure, and a mast connection apparatus that is adapted to removably connect the second mast section to the first mast section when an upper end of the first mast section is raised relative to a lower end of the second mast section.