摘要:
A system for erecting a drilling rig mast includes a substructure having an open area that is defined therein by two laterally spaced-apart substructure sides and a first mast section that is adapted to be positioned at least partially within the open area of the substructure after the first mast section has been removably connected to the substructure. The system further includes, among other things, a second mast section that is adapted to be removably connected to the first mast section the said first mast section has been removably connected to the substructure, and a mast connection apparatus that is adapted to removably connect the second mast section to the first mast section when an upper end of the first mast section is raised relative to a lower end of the second mast section.
摘要:
An assembly for positioning a crane mounted on a support and intended to overhang the platform of a platform structure having a base which rests on the bed of a body of water. The crane is located on the vertical axis of a column offset with respect to a central shaft which carries the platform. The assembly comprises a mobile shaft element contained in the upper part of the offset column and having a base with jacks or a block and tackle permitting its emergence as far as the upper level of the offset column. The lower face of the crane support carries a downwardly extending shaft element which has the same diameter as the mobile shaft element. The two shaft elements are substantially coaxial when the platform is carried on the central shaft so that they may be joined together and raised as a unit.
摘要:
A lifting device for building a steel structure hoistway and a method for building a steel structure hoistway. The lifting device includes a lifting mechanism and a crane mechanism. The lifting mechanism includes a bottom platform, a middle platform and a top platform. The crane mechanism is arranged on the top platform of the lifting mechanism, and includes a base and a crane on the base. The base is arranged on the top platform and is rotatable relative to the top platform along a vertical axis, and the hanger frame of the crane is movable between a vertical orientation and an inclined orientation. The lifting mechanism is configured to ascend and descend in the constructed steel structure hoistway, and the crane mechanism is configured to lift building materials, such as steel beams, steel columns, etc., for use in building the steel structure hoistway to their designed installation locations.
摘要:
The invention relates to a tower crane having a tower which carries a jib, from which a hoisting cable runs off, wherein a guying system is provided and runs, at least in part, along the tower and is spread out, by means of guy supports, in a direction transverse to the longitudinal center plane of the crane, this plane running through the tower and the jib, wherein at least one pair of guy supports which are spread out in a V-shaped manner are articulated on the tower, between the lower end of the latter and the jib.
摘要:
A telescopic tower crane system has several tower layers of different outer diameters. Tower layers of smaller outer diameters are put inside the tower layers of larger outer diameters. Each of the tower layers consists of upstanding tower masts and crossbars connecting in between. The lower end of each of the tower masts has a lifting mechanism. Hoists are combined with the lifting mechanisms to lift the tower layers upward one by one from inside outward. The positioning mechanism at the lower end of each of the tower masts is positioned to the upper end of the adjacent tower mast. The crane tower is thus lifted to an extreme height and can lift heavy or long objects.
摘要:
A lifting device for building a steel structure hoistway and a method for building a steel structure hoistway. The lifting device includes a lifting mechanism and a crane mechanism. The lifting mechanism includes a bottom platform, a middle platform and a top platform. The crane mechanism is arranged on the top platform of the lifting mechanism, and includes a base and a crane on the base. The base is arranged on the top platform and is rotatable relative to the top platform along a vertical axis, and the hanger frame of the crane is movable between a vertical orientation and an inclined orientation. The lifting mechanism is configured to ascend and descend in the constructed steel structure hoistway, and the crane mechanism is configured to lift building materials, such as steel beams, steel columns, etc., for use in building the steel structure hoistway to their designed installation locations.
摘要:
An enhanced stability crane (100) is described. Embodiments include a telescoping main support mast (114) upon which a crane base (106) resides. A boom (140) projects upwardly from the crane base and a jib (148) typically projects upwardly from the boom. A clamping assembly (108) resides on the main support mast and is configured to attach to an existing structure adjacent to the crane, in order to enhance stability. Multiple clamping assemblies can be distributed along the telescoping main support mast when it is extended. The existing structure is generally a tower structure (180) that is columnar and vertical in shape and orientation, and frequently has an elliptical horizontal cross-section. Tower structures are typically, but not necessarily, wind turbine towers. In some embodiments, the crane is mobile capable of lifting objects weighing about 110 tons to a height of about 400 feet. The crane typically adjusts to a collapsed configuration, enabling facile transport.
摘要:
Self-climbing, telescopic crane and a method for mounting pre-fabricated concrete towers of the type formed by a plurality of modules joined laterally to form diverse frustroconical segments that are subsequently stacked to form the tower, that comprises an external vertical column and another internal one that can move vertically via actuators. The top part of the internal vertical column terminates in a horizontally rotatable capstan, associated with a horizontal arm terminating at the opposite end in a pulley through which the hoist cable moves. The invention presented affords the main advantage of allowing mounting from inside the tower, dispensing with the need of expensive long-reach cranes to be operating over long periods, with a notable reduction in the economic cost and the mounting time of the tower, as well as allowing mounting to be carried out in unfavourable wind conditions.
摘要:
A system for erecting a drilling rig mast includes a substructure having an open area that is defined therein by two laterally spaced-apart substructure sides and a first mast section that is adapted to be positioned at least partially within the open area of the substructure after the first mast section has been removably connected to the substructure. The system further includes, among other things, a second mast section that is adapted to be removably connected to the first mast section the said first mast section has been removably connected to the substructure, and a mast connection apparatus that is adapted to removably connect the second mast section to the first mast section when an upper end of the first mast section is raised relative to a lower end of the second mast section.