SELF-ERECTING CRANE WITH CONTROL OF THE CONFIGURATION CHANGE OPERATIONS

    公开(公告)号:US20220388817A1

    公开(公告)日:2022-12-08

    申请号:US17834292

    申请日:2022-06-07

    IPC分类号: B66C23/68 B66C23/34

    摘要: A self-erecting crane includes a mast supporting a foldable jib having jib elements articulated together, configurable between a transport configuration and a work configuration. The crane also includes a motor-driven folding/unfolding system for performing configuration change operations implementing kinematics of folding and unfolding the jib, and a control/command system connected to the motor-driven folding/unfolding system to drive it. One or several inclinometer(s) are mounted on one or several jib element(s) to measure actual inclinations of the jib element(s) with respect to a reference axis. The control/command system is configured to drive the motor-driven folding/unfolding system according to the actual inclinations of the jib element(s) during the kinematics of folding and unfolding the jib.

    AUTOMATICALLY FOLDING AND UNFOLDING TOWER CRANE

    公开(公告)号:US20220144600A1

    公开(公告)日:2022-05-12

    申请号:US17522250

    申请日:2021-11-09

    IPC分类号: B66C23/68 B66C23/34 B66C23/00

    摘要: An automated collapsible tower crane comprising a mast with telescopic portions, a boom with boom sections articulated with each other by respective rotary joints, a boom folding system to unfold and fold the boom by the rotary joints wherein each proximal and distal rotary joint is associated with at least one hydraulic actuator to unfold and fold boom sections, a mast folding system to fold the mast down, wherein in the transport position the boom sections are folded down one on top of the other and on the mast, and the boom folding and unfolding system acts independently of the folding and telescoping system of the mast, and comprises hydraulic actuators to fold and unfold the boom sections.

    Crane assembling method
    3.
    发明授权

    公开(公告)号:US10526176B2

    公开(公告)日:2020-01-07

    申请号:US16214579

    申请日:2018-12-10

    发明人: Tetsuya Kobatake

    摘要: Provided is a crane assembling method which can easily assemble a crane. In the crane assembling method, a step of connecting an (n+1)th partial jib includes the steps of: placing a distal end of an nth partial jib connected to a boom on a pedestal on the ground; connecting an upper side connector on a proximal end of the (n+1)th partial jib to an upper side connector on the distal end of the nth partial jib in a state where the (n+1)th partial jib is lifted; mounting a wheel on the lower side connector on a distal end of the (n+1)th partial jib; and connecting a lower side connector of the nth partial jib and a lower side connector on a proximal end of the (n+1)th partial jib to each other by lifting the nth partial jib.

    METHOD FOR RAISING STRUT, AND CRANE
    5.
    发明申请

    公开(公告)号:US20180346290A1

    公开(公告)日:2018-12-06

    申请号:US15995362

    申请日:2018-06-01

    发明人: Detlef Brueckner

    IPC分类号: B66C23/34 B66C23/42 B66C23/68

    摘要: Disclosed is a technique of executing: a fixing step of coupling a pulling-raising rope 171 to a vicinity of a distal end 73 of a strut 70; a first raising step of pulling the pulling-raising rope 171 rearwardly to cause a swingable portion 78 of the strut 70 to swing upwardly and rearwardly; a second raising step of pulling the pulling-raising rope 171 rearwardly until a strut body portion 76 has a rearwardly inclined posture with respect to a vertical direction; a strut returning step of pulling a pulling-returning rope 23a forwardly to a position where a forward swinging movement of the swingable portion 78 with respect to the strut body portion 76 is restricted; and a coupling step of coupling the swingable portion 78 and the strut body portion 76 to each other in a non-swingable manner.

    Folding Boom
    8.
    发明申请
    Folding Boom 审中-公开
    折叠臂

    公开(公告)号:US20090107945A1

    公开(公告)日:2009-04-30

    申请号:US11989499

    申请日:2006-07-11

    IPC分类号: B66C23/34

    CPC分类号: B66C23/348 E04G21/0418

    摘要: The invention concerns a collapsible boom, such as a crane jib, concrete pump, camera support, searchlight mast and similar narrow far-projecting structures with several elements (10, 20, 30 . . . ), tiltable around parallel axes, which can be tilted around the axis by actuators (15, 13, 25, 23, . . . ) and fixed in at least one position.The invention is characterized by the fact that the individual elements (10, 20, 30 . . . ) of the boom are hinged to each other via intermediate pieces (50, 60, 70) and the actuators (15, 13, 25, 23, . . . ) engage on one end on an intermediate piece and on the other end on its adjacent element.

    摘要翻译: 本发明涉及一种可折叠起重臂,例如起重机起重臂,混凝土泵,照相机支架,探照灯桅杆以及具有可围绕平行轴倾斜的多个元件(10,20,30 ...)的类似的窄远突出结构,其可以是 通过致动器(15,13,​​25,23 ...)围绕轴线倾斜并固定在至少一个位置。 本发明的特征在于,悬臂的各个元件(10,20,30 ...)通过中间件(50,60,70)和致动器(15,13,​​25,23)彼此铰接 ,...)接合在中间件的一端上,另一端接合在其相邻元件上。

    Automatic leveling and synchronization system for counterweight removal
and installation
    9.
    发明授权
    Automatic leveling and synchronization system for counterweight removal and installation 有权
    自动调平和同步系统,用于配重拆卸和安装

    公开(公告)号:US6050430A

    公开(公告)日:2000-04-18

    申请号:US182464

    申请日:1998-10-30

    IPC分类号: B66C23/74 F15B11/22 B66C23/34

    CPC分类号: F15B11/22 B66C23/74

    摘要: The automatic leveling and synchronization system for raising and lowering a counterweight includes at least a primary and secondary cylinder connected in series hydraulic communication. The primary cylinder includes a first rod connected to a first piston, and the first rod is attached to one end of a counterweight. The secondary cylinder includes a second rod connected to a second piston, and the second rod is attached to another end of the counterweight. A surface area of a bottom of the second piston is set equal to a surface area of a top of the first piston.

    摘要翻译: 用于升降配重的自动调平同步系统包括至少连接有串联液压连接的主缸和副缸。 主缸包括连接到第一活塞的第一杆,并且第一杆附接到配重的一端。 次级气缸包括连接到第二活塞的第二杆,并且第二杆附接到配重的另一端。 将第二活塞的底部的表面积设定为等于第一活塞的顶部的表面积。

    Apparatus and method for building construction
    10.
    发明授权
    Apparatus and method for building construction 失效
    建筑施工设备及方法

    公开(公告)号:US5839239A

    公开(公告)日:1998-11-24

    申请号:US831164

    申请日:1997-04-01

    申请人: Byung K. Jang

    发明人: Byung K. Jang

    CPC分类号: B66F7/20 E04B1/3511

    摘要: Two methods of constructing either a metal or wooden framed multi-story building and corresponding apparatus utilized in the construction. Building includes erecting roof frame beams and subsequent floor levels. For a metal framed building, motorized lifting devices are positioned on specific metal bars. Each metal floor frame has corresponding metal lifting bars. Metal post beams are supported by metal assembly brackets of several lengths, including a spacer block during the repositioning of the motorized lifting devices for the next floor level. The metal corner post beams and the motorized lifting device can further be supported during the lifting procedure by a collar and bracket system. The horizontal level of each floor is controlled by a central control system including lasers, laser sensors and a computer. A second embodiment is directed to the building of wood houses to utilize cantilevered metal lifting bar assemblies supported by lifting devices. The lifting bar assemblies have adjustable framing spaces on top for forming one to three joists in a space. The corner and intermediate outside posts can be formed to have a predetermined set of holes for fastening a glass facade for the building. The construction can be aided by the use of a combination building support and work area assembly placed in the ground on the outside of the building.

    摘要翻译: 建造金属或木质框架多层建筑的两种方法和施工中使用的相应设备。 建筑物包括架设屋顶梁和随后的楼层。 对于金属框架建筑物,电动提升装置位于特定的金属条上。 每个金属地板框架都有相应的金属吊杆。 金属柱梁由几个长度的金属组件支架支撑,包括在电动升降装置重新定位下一层楼板时的间隔块。 金属角柱梁和电动提升装置在提升过程中可以通过轴环和支架系统进一步支撑。 每个楼层的水平位置由包括激光,激光传感器和计算机在内的中央控制系统控制。 第二实施例涉及建筑木屋,以利用由提升装置支撑的悬臂金属提升杆组件。 提升杆组件在顶部具有可调节的框架空间,用于在空间中形成一至三个托梁。 角部和中间的外侧柱可以形成为具有用于紧固建筑物的玻璃立面的预定的一组孔。 该建筑可以通过在建筑物外部放置在地面上的建筑支撑和工作区组合的组合来辅助。