Supply of rope to an elevator speed limiter
    2.
    发明授权
    Supply of rope to an elevator speed limiter 有权
    提供绳索到电梯限速器

    公开(公告)号:US09388018B2

    公开(公告)日:2016-07-12

    申请号:US12493011

    申请日:2009-06-26

    IPC分类号: B66B19/02 B66B5/04 B66B9/187

    摘要: The invention concerns an arrangement in the supply of rope to the speed limiter of an elevator. The arrangement comprises at least a braking device for braking the rope being supplied to the speed limiter. As new rope is being fed to the speed limiter, the new rope has been fitted to run via the braking device and under a diverting pulley in the lower part of the elevator shaft and passed further from the diverting pulley over an upper speed limiter pulley to act on the safety gear of the elevator.

    摘要翻译: 本发明涉及向电梯限速器供应绳索的布置。 该装置至少包括用于制动被提供给速度限制器的绳索的制动装置。 当新的绳索被送入速度限制器时,新的绳索已经被安装成通过制动装置运行并且在电梯井的下部的转向滑轮下面,并且从转向滑轮越过上限速器滑轮, 作用于电梯的安全装置。

    OVERSPEED GOVERNOR TENSION SHEAVE ASSEMBLY
    3.
    发明申请
    OVERSPEED GOVERNOR TENSION SHEAVE ASSEMBLY 有权
    超额总裁张力大会

    公开(公告)号:US20160083221A1

    公开(公告)日:2016-03-24

    申请号:US14960705

    申请日:2015-12-07

    IPC分类号: B66B5/04 B66B5/00

    摘要: The invention relates to an overspeed governor tension sheave assembly in an elevator comprising at least an elevator car arranged to run along the guide rails and controlled by a speed governor assembly that is coupled to the elevator car through a governor rope forming a closed loop running over a governor sheave, and under a governor tension sheave being a part of the overspeed governor tension sheave assembly. The overspeed governor tension sheave assembly is equipped with a monitoring device that has indicating means for indicating the need for adjustment the position of the overspeed governor tension sheave assembly.

    摘要翻译: 本发明涉及一种电梯中的超速调速器张力滑轮组件,其包括至少一个升降机轿厢,该升降机轿厢布置成沿着导轨行进并由调速器组件控制,该调速器组件通过调速器绳索联接到电梯轿厢,该调速器绳索形成一个闭环运行 一个州长滑轮,并且在一个调速器紧张滑轮下,是超速调速器拉力滑轮组件的一部分。 超速调速器拉力滑轮组件配备有监控装置,其具有指示装置,用于指示需要调整超速调速器拉力滑轮组件的位置。

    ARRANGEMENT AND METHOD FOR POSITIONING THE ALIGNMENT PLUMB LINES OF THE GUIDE RAILS OF AN ELEVATOR
    4.
    发明申请
    ARRANGEMENT AND METHOD FOR POSITIONING THE ALIGNMENT PLUMB LINES OF THE GUIDE RAILS OF AN ELEVATOR 有权
    用于定位电梯导轨的对准线路的布置和方法

    公开(公告)号:US20110067252A1

    公开(公告)日:2011-03-24

    申请号:US12954355

    申请日:2010-11-24

    IPC分类号: G01C15/10 G01B1/00

    CPC分类号: B66B19/002 G01C15/10

    摘要: An arrangement and a method are provided for positioning the alignment plumb lines of the guide rails of an elevator, more particularly when installing an elevator during the construction phase of a building. The solution includes at least actuators fixed above the guide rails for moving at least the parts of the alignment plumb lines above the guide rails for positioning the alignment plumb lines.

    摘要翻译: 提供了一种用于定位电梯的导轨的对准铅垂线的布置和方法,更具体地,当在建筑物的施工阶段期间安装电梯时。 解决方案至少包括固定在导轨上方的致动器,用于至少移动导轨上方的对准铅垂线的部分,用于定位对准铅垂线。

    Method for installing the hoisting roping of an elevator
    6.
    发明授权
    Method for installing the hoisting roping of an elevator 有权
    安装升降机起吊绳的方法

    公开(公告)号:US08720032B2

    公开(公告)日:2014-05-13

    申请号:US13293887

    申请日:2011-11-10

    IPC分类号: B21D39/03 B23P11/00

    摘要: The object of the invention is a method for installing the hoisting roping of an elevator, in which method the hoisting roping of the elevator is lifted upwards into the elevator hoistway by means of a hoisting device. The hoisting roping is lifted upwards into the elevator hoistway in steps such that at least one rope of the roping is lifted by pulling it to the height and the aforementioned at least one rope is fixed to the elevator hoistway or to another fixed structure of the building, at least one of the ropes of the roping that is at the height and was lifted in phase is detached, at least one rope detached in phase is lifted by pulling it to the next height and the aforementioned at least one rope is fixed to the elevator hoistway or to another fixed structure of the building.

    摘要翻译: 本发明的目的是提供一种用于安装电梯的起重绳索的方法,其中通过提升装置将电梯的起重绳索向上提升到电梯井道中。 起重绳索以梯级向上提升到电梯井道中,使得至少一根绳索通过将其拉到高度而提升,并且上述至少一根绳索固定到电梯井道或建筑物的另一固定结构 绳索的绳索中的至少一个处于高度并相位被提升的同时被拆卸,通过将至少一个脱离相同的绳索拉到下一个高度而将上述的至少一根绳索固定到 电梯井道或建筑物的另一固定结构。

    Method and apparatus for installing an elevator during the construction of a building
    7.
    发明申请
    Method and apparatus for installing an elevator during the construction of a building 有权
    在建筑施工期间安装电梯的方法和装置

    公开(公告)号:US20050150728A1

    公开(公告)日:2005-07-14

    申请号:US11042050

    申请日:2005-01-26

    IPC分类号: B66B7/00 B66B19/00

    CPC分类号: B66B19/002 Y10S187/90

    摘要: The invention also relates to a method for installing an elevator provided with a machine room and suspended by hoisting ropes (15) and moving along guide rails (2) during the construction stage of building. The elevator is provided with a hoisting device (17), by means of which the machine room (4), which is initially placed in the lower part of the elevator shaft (1), is lifted through one or more floor-to-floor distances at a time in the shaft in such manner that at least the vertical forces resulting from the lifting are transmitted to the bottom structures of the building substantially via the guide rails (2) already secured.

    摘要翻译: 本发明还涉及一种设置有机房的升降机的方法,并且在建筑施工阶段期间通过提升绳索(15)悬挂并沿导轨(2)移动。 升降机设有提升装置(17),初始放置在电梯井(1)的下部的机房(4)通过一个或多个地板到地板 轴中的每一次的距离,使得至少由提升产生的垂直力基本上经由已固定的导轨(2)传递到建筑物的底部结构。

    Procedure and apparatus for the installation of an elevator
    8.
    发明授权
    Procedure and apparatus for the installation of an elevator 有权
    安装电梯的步骤和设备

    公开(公告)号:US06357556B1

    公开(公告)日:2002-03-19

    申请号:US09180353

    申请日:1999-01-06

    IPC分类号: B66B1900

    摘要: The invention relates to a procedure and an apparatus for the installation of an elevator. According to the invention, at least one suspension element (16,17) is fixed to the upper part of the elevator shaft, to which element is fitted a suspension device (24) used to support shaft equipment during installation. The suspension device (24) is mounted on the suspension element (16,17) using a mounting tool (22) from the top floor landing (11).

    摘要翻译: 本发明涉及一种用于安装电梯的程序和装置。 根据本发明,至少一个悬挂元件(16,17)固定到电梯井的上部,在该安装过程中,元件装配有用于在安装期间支撑轴设备的悬挂装置(24)。 使用来自顶层落地(11)的安装工具(22)将悬挂装置(24)安装在悬挂元件(16,17)上。

    Method And Elevator Arrangement
    9.
    发明申请
    Method And Elevator Arrangement 审中-公开
    方法和电梯安排

    公开(公告)号:US20120023863A1

    公开(公告)日:2012-02-02

    申请号:US13200946

    申请日:2011-10-05

    IPC分类号: B66B9/187 B66B9/16 E04G21/14

    CPC分类号: B66B19/00 B66F1/08 B66F7/20

    摘要: Method for constructing an elevator, more particularly an elevator that is used during the construction-time of the building, in which method the range of movement in the elevator hoistway of the elevator car of the elevator is changed in steps to extend higher in the elevator hoistway with stepped lifts of the supporting platform of the elevator car, and in which method the supporting platform is lifted higher in the elevator hoistway with hoisting means, and the support force needed for the lift is taken from the building via a support structure. In the method the supporting platform is moved in the longitudinal direction of the elevator hoistway while being supported on a support structure that is supported immovably on the building such that the point for taking support from the support structure moves upwards in connection with the lifting of the supporting platform.

    摘要翻译: 更具体地说,在建筑施工期间使用的电梯的方法,其中电梯的电梯轿厢的电梯井道中的移动范围在电梯中逐步改变, 电梯轿厢的支撑平台的升降机的升降机,并且以提升装置将电梯井道中的支撑平台升高到该电梯井道中的方式,并且通过支撑结构从建筑物获取电梯所需的支撑力。 在该方法中,支撑平台在电梯井道的纵向方向上移动,同时支撑在不可移动地支撑在建筑物上的支撑结构上,使得用于从支撑结构支撑的点与上升 配套平台

    Method and apparatus for installing an elevator during the construction of a building
    10.
    发明授权
    Method and apparatus for installing an elevator during the construction of a building 有权
    在建筑施工期间安装电梯的方法和装置

    公开(公告)号:US07635049B2

    公开(公告)日:2009-12-22

    申请号:US11042050

    申请日:2005-01-26

    IPC分类号: B66B11/02

    CPC分类号: B66B19/002 Y10S187/90

    摘要: The invention also relates to a method for installing an elevator provided with a machine room and suspended by hoisting ropes (15) and moving along guide rails (2) during the construction stage of building. The elevator is provided with a hoisting device (17), by means of which the machine room (4), which is initially placed in the lower part of the elevator shaft (1), is lifted through one or more floor-to-floor distances at a time in the shaft in such manner that at least the vertical forces resulting from the lifting are transmitted to the bottom structures of the building substantially via the guide rails (2) already secured.

    摘要翻译: 本发明还涉及一种设置有机房的升降机的方法,并且在建筑施工阶段期间通过提升绳索(15)悬挂并沿导轨(2)移动。 升降机设有提升装置(17),初始放置在电梯井(1)的下部的机房(4)通过一个或多个地板到地板 轴中的每一次的距离,使得至少由提升产生的垂直力基本上经由已固定的导轨(2)传递到建筑物的底部结构。