Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine
    2.
    发明授权
    Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine 有权
    在建筑物施工期间安装没有机房的电梯的方法和装置,以及使用曳引机

    公开(公告)号:US08485319B2

    公开(公告)日:2013-07-16

    申请号:US12466821

    申请日:2009-05-15

    IPC分类号: B66B9/00

    CPC分类号: B66B19/00 B66B7/027

    摘要: The invention relates to a method and an apparatus for installing an elevator with-out machine room during the construction of a building, said elevator comprising at least a hoisting machine (4) provided with a traction sheave (30) and an elevator car (3) suspended by a set of hoisting ropes (28) and fitted to move along guide rails (2), and in which method at least a temporary machine room (6) movable in the elevator shaft (1) is utilized. At the final stage of installation, the machine room (6) of the elevator provided with a temporary machine room (6) is dismounted and the elevator is converted into an elevator without machine room by placing the hoisting machine (4) that was used in the temporary machine room (6), together with the hoisting ropes (28) on the traction sheave (30), into its final position in the elevator shaft (1).

    摘要翻译: 本发明涉及一种在建筑物施工期间安装电梯机房的方法和装置,所述电梯至少包括一个设有牵引绳轮(30)和电梯轿厢(3)的曳引机(4) )由一组提升绳索(28)悬挂并且被安装成沿着导轨(2)移动,并且利用这种方法,至少在电梯井道(1)中可移动的临时机房(6)被利用。 在安装的最后阶段,拆下设有临时机房(6)的电梯的机房(6),并将升降机转换成没有机房的电梯,放置使用的曳引机(4) 临时机房(6)与牵引滑轮(30)上的提升绳索(28)一起进入电梯井(1)的最终位置。

    Method and apparatus for installing an elevator during the construction of a building
    3.
    发明申请
    Method and apparatus for installing an elevator during the construction of a building 有权
    在建筑施工期间安装电梯的方法和装置

    公开(公告)号:US20050150728A1

    公开(公告)日:2005-07-14

    申请号:US11042050

    申请日:2005-01-26

    IPC分类号: B66B7/00 B66B19/00

    CPC分类号: B66B19/002 Y10S187/90

    摘要: The invention also relates to a method for installing an elevator provided with a machine room and suspended by hoisting ropes (15) and moving along guide rails (2) during the construction stage of building. The elevator is provided with a hoisting device (17), by means of which the machine room (4), which is initially placed in the lower part of the elevator shaft (1), is lifted through one or more floor-to-floor distances at a time in the shaft in such manner that at least the vertical forces resulting from the lifting are transmitted to the bottom structures of the building substantially via the guide rails (2) already secured.

    摘要翻译: 本发明还涉及一种设置有机房的升降机的方法,并且在建筑施工阶段期间通过提升绳索(15)悬挂并沿导轨(2)移动。 升降机设有提升装置(17),初始放置在电梯井(1)的下部的机房(4)通过一个或多个地板到地板 轴中的每一次的距离,使得至少由提升产生的垂直力基本上经由已固定的导轨(2)传递到建筑物的底部结构。

    Procedure and apparatus for the installation of an elevator
    4.
    发明授权
    Procedure and apparatus for the installation of an elevator 有权
    安装电梯的步骤和设备

    公开(公告)号:US06357556B1

    公开(公告)日:2002-03-19

    申请号:US09180353

    申请日:1999-01-06

    IPC分类号: B66B1900

    摘要: The invention relates to a procedure and an apparatus for the installation of an elevator. According to the invention, at least one suspension element (16,17) is fixed to the upper part of the elevator shaft, to which element is fitted a suspension device (24) used to support shaft equipment during installation. The suspension device (24) is mounted on the suspension element (16,17) using a mounting tool (22) from the top floor landing (11).

    摘要翻译: 本发明涉及一种用于安装电梯的程序和装置。 根据本发明,至少一个悬挂元件(16,17)固定到电梯井的上部,在该安装过程中,元件装配有用于在安装期间支撑轴设备的悬挂装置(24)。 使用来自顶层落地(11)的安装工具(22)将悬挂装置(24)安装在悬挂元件(16,17)上。

    Method And Elevator Arrangement
    5.
    发明申请
    Method And Elevator Arrangement 审中-公开
    方法和电梯安排

    公开(公告)号:US20120023863A1

    公开(公告)日:2012-02-02

    申请号:US13200946

    申请日:2011-10-05

    IPC分类号: B66B9/187 B66B9/16 E04G21/14

    CPC分类号: B66B19/00 B66F1/08 B66F7/20

    摘要: Method for constructing an elevator, more particularly an elevator that is used during the construction-time of the building, in which method the range of movement in the elevator hoistway of the elevator car of the elevator is changed in steps to extend higher in the elevator hoistway with stepped lifts of the supporting platform of the elevator car, and in which method the supporting platform is lifted higher in the elevator hoistway with hoisting means, and the support force needed for the lift is taken from the building via a support structure. In the method the supporting platform is moved in the longitudinal direction of the elevator hoistway while being supported on a support structure that is supported immovably on the building such that the point for taking support from the support structure moves upwards in connection with the lifting of the supporting platform.

    摘要翻译: 更具体地说,在建筑施工期间使用的电梯的方法,其中电梯的电梯轿厢的电梯井道中的移动范围在电梯中逐步改变, 电梯轿厢的支撑平台的升降机的升降机,并且以提升装置将电梯井道中的支撑平台升高到该电梯井道中的方式,并且通过支撑结构从建筑物获取电梯所需的支撑力。 在该方法中,支撑平台在电梯井道的纵向方向上移动,同时支撑在不可移动地支撑在建筑物上的支撑结构上,使得用于从支撑结构支撑的点与上升 配套平台

    Method and apparatus for installing an elevator during the construction of a building
    6.
    发明授权
    Method and apparatus for installing an elevator during the construction of a building 有权
    在建筑施工期间安装电梯的方法和装置

    公开(公告)号:US07635049B2

    公开(公告)日:2009-12-22

    申请号:US11042050

    申请日:2005-01-26

    IPC分类号: B66B11/02

    CPC分类号: B66B19/002 Y10S187/90

    摘要: The invention also relates to a method for installing an elevator provided with a machine room and suspended by hoisting ropes (15) and moving along guide rails (2) during the construction stage of building. The elevator is provided with a hoisting device (17), by means of which the machine room (4), which is initially placed in the lower part of the elevator shaft (1), is lifted through one or more floor-to-floor distances at a time in the shaft in such manner that at least the vertical forces resulting from the lifting are transmitted to the bottom structures of the building substantially via the guide rails (2) already secured.

    摘要翻译: 本发明还涉及一种设置有机房的升降机的方法,并且在建筑施工阶段期间通过提升绳索(15)悬挂并沿导轨(2)移动。 升降机设有提升装置(17),初始放置在电梯井(1)的下部的机房(4)通过一个或多个地板到地板 轴中的每一次的距离,使得至少由提升产生的垂直力基本上经由已固定的导轨(2)传递到建筑物的底部结构。

    Supply of rope to an elevator speed limiter
    7.
    发明授权
    Supply of rope to an elevator speed limiter 有权
    提供绳索到电梯限速器

    公开(公告)号:US09388018B2

    公开(公告)日:2016-07-12

    申请号:US12493011

    申请日:2009-06-26

    IPC分类号: B66B19/02 B66B5/04 B66B9/187

    摘要: The invention concerns an arrangement in the supply of rope to the speed limiter of an elevator. The arrangement comprises at least a braking device for braking the rope being supplied to the speed limiter. As new rope is being fed to the speed limiter, the new rope has been fitted to run via the braking device and under a diverting pulley in the lower part of the elevator shaft and passed further from the diverting pulley over an upper speed limiter pulley to act on the safety gear of the elevator.

    摘要翻译: 本发明涉及向电梯限速器供应绳索的布置。 该装置至少包括用于制动被提供给速度限制器的绳索的制动装置。 当新的绳索被送入速度限制器时,新的绳索已经被安装成通过制动装置运行并且在电梯井的下部的转向滑轮下面,并且从转向滑轮越过上限速器滑轮, 作用于电梯的安全装置。

    Method for installing an elevator and method for installing the guide rails of an elevator
    9.
    发明授权
    Method for installing an elevator and method for installing the guide rails of an elevator 有权
    电梯安装方法及安装电梯导轨的方法

    公开(公告)号:US08186130B2

    公开(公告)日:2012-05-29

    申请号:US12833475

    申请日:2010-07-09

    IPC分类号: B66B7/02

    摘要: The object of the invention is a method for installing an elevator, in which method the guide rails of the car are installed by fixing the guide rail sections into position from the bottom upwards. After installation into position of the lowermost guide rail section at least one working platform is built between the guide rails of the lowermost guide rail section, the guide rails of the second guide rail section are fixed as an extension of the guide rails of the lowermost guide rail section using the working platform as an aid, diverting pulleys are fixed to the top ends of the guide rails of the second guide rail section, a hoist and the rope suspension of the working platform are fitted to the working platform, in which rope suspension the hoisting rope is led at its first end from the hoist over the diverting pulleys and under the diverting pulleys that are in connection with the working platform to its fixing point of the second end on the working platform, and the working platform is lifted to the next working height by means of the hoist and is locked into position.

    摘要翻译: 本发明的目的是一种用于安装电梯的方法,其中通过将导轨部分从底部向上固定到该位置来安装轿厢的导轨。 在安装到最下面的导轨部分的位置之后,在最下面的导轨段的导轨之间建立至少一个工作平台,第二导轨段的导轨被固定为最下面的导轨的导轨的延伸部 轨道部分使用工作平台作为辅助,转向滑轮固定到第二导轨部分的导轨的顶端,起重机和工作平台的绳索悬架安装在工作平台上,其中绳索悬挂 起重绳索的第一端从提升机的第一端被引导到转向滑轮上并且与工作平台连接的转向滑轮下方到达工作平台上的第二端的固定点,并且将工作平台提升到 通过葫芦的下一个工作高度被锁定到位。

    Arrangement and method for positioning the alignment plumb lines of the guide rails of an elevator
    10.
    发明授权
    Arrangement and method for positioning the alignment plumb lines of the guide rails of an elevator 有权
    用于定位电梯的导轨的对准铅垂线的布置和方法

    公开(公告)号:US07997000B2

    公开(公告)日:2011-08-16

    申请号:US12954355

    申请日:2010-11-24

    IPC分类号: G01B5/25

    CPC分类号: B66B19/002 G01C15/10

    摘要: An arrangement and a method are provided for positioning the alignment plumb lines of the guide rails of an elevator, more particularly when installing an elevator during the construction phase of a building. The solution includes at least actuators fixed above the guide rails for moving at least the parts of the alignment plumb lines above the guide rails for positioning the alignment plumb lines.

    摘要翻译: 提供了一种用于定位电梯的导轨的对准铅垂线的布置和方法,更具体地,当在建筑物的施工阶段期间安装电梯时。 解决方案至少包括固定在导轨上方的致动器,用于至少移动导轨上方的对准铅垂线的部分,用于定位对准铅垂线。