摘要:
Line system design techniques are provided for use in performing routing and coloring operations associated with one or more demands. In one aspect of the invention, a technique for designing a line system comprises the following steps/operations. A set of one or more demands is obtained for use in computing the line system design. The line system design is then represented as a graph in accordance with a graph coloring operation wherein colors represent bandwidths such that bandwidths are assigned and the one or more demands are routed so as to attempt to achieve a minimum total design cost. The line system being designed may be an optical line system.
摘要:
Improved network design techniques are provided. For example, a technique for designing a protection capacity to be reserved in a network comprises the following steps/operations. One or more link capacities associated with a network topology are obtained. The network is assumed to have no pre-existing working traffic. A capacity partition including a working capacity portion and a protection capacity portion is determined for at least one link in the network topology. The protection capacity portion is reserved for rerouting working traffic upon a failure and enabling control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted. Determining the capacity partition substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild. A minimal overbuild may include an overbuild equivalent to no more than two times an overbuild required for an optimal solution.
摘要:
Improved network design techniques are provided. More particularly, the invention provides network design techniques that support fast restoration. In one aspect of the invention, a technique for designing a protection capacity to be reserved in a network comprises the following steps/operations. Link capacities associated with a network topology and existing working traffic in the network are obtained. Capacity partitions are determined for links in the network topology. Each of at least a portion of the capacity partitions comprise a protection capacity portion and a working capacity portion that equals or exceeds the existing working traffic on a corresponding link, such that upon a failure on the link, the working traffic on the link is rerouted over a pre-provisioned detour path using the protection capacity portion on one or more links on the detour path. Further, the capacity partition determination step/operation substantially guarantees protection for existing working traffic in the network. Still further, the capacity partition determining step/operation may further substantially guarantee protection for future working traffic in the network.