摘要:
A first steer tube has a first upper side and a first lower side. A second steer tube has a second upper side and a second lower side. A first axle mounting structure is configured to connect the first lower side to a first end of an axle assembly of a wheel. A second axle mounting structure is configured to connect the second lower side to a second end of the axle assembly. A first head tube assembly is disposed to the first lower side. A second head tube assembly is disposed to the second lower side. A support structure includes a first pivot connection and a second pivot connection. A first arm connects the first head tube assembly and the first pivot connection. A second arm connects the second head tube assembly and the second pivot connection.
摘要:
An alarm event generation method and apparatus for signaling an alarm (436, 1400) for a process control system (100). The process control system (100) monitors a production run using a computer system (108). The computer system (108) collects process data corresponding to the production run from operator workstations (104, 106) and stores the process data in a process data database (110). The process data includes a plurality of process parameter counts (430) each corresponding to a process parameter type (428). The process parameter counts (430) are polled from the computer system (108). Each process parameter count (430) has a corresponding manufacturing limit (434) to which it is compared. When a polled process parameter count (430) exceeds its corresponding manufacturing limit (434), an alarm (436, 1400) is signaled. While an alarm (436, 1400) is being signaled, the computer system (108) is prevented from collecting and storing process data.
摘要:
Methods and apparatuses are provided for creation of discrete corrosion defects with a wide range of diameter to depth aspect ratios for painted test standards. Also provided are methods for use of those test standards to characterize the corrosion under paint detection threshold, statistical reliability, and accuracy of NDI and/or NDT techniques including but not limited to flash thermography, ultrasonic testing, eddy current testing, microwave testing, shearography, and infrared testing.
摘要:
A computer-implemented automated building design and modeling and construction project cost estimating and scheduling system (“DMES system”) is described. The DMES system provides a central source for all of the design and construction information for a construction project in a coordinated two-dimensional and three-dimensional spatial database that is freely accessible by all of the members of an interdisciplinary construction project team as a means to produce automatically coordinated design development and construction document information. The DMES system acquires and stores all of the appropriate design, engineering, and construction expertise and information available for any building type for use in automatically assembling and coordinating the design, cost-estimating, and scheduling for a construction project. In one embodiment, the DMES system consists of a plurality of objects, comprising elements and massing elements arranged in an assembly hierarchy. Each of the objects includes programming code that defines an interface and discrete internal functions that define its behavior. When instantiated in the database, the objects automatically create further instances of other objects in the hierarchy, which in turn do the same, thus assembling a complete building model automatically from the initial manually-placed instance. The building model enables automatic generation of drawings and cost and scheduling information. By running automatic iterations of the building model, multiple designs may be evaluated to determine the optimum design.
摘要:
Methods and apparatuses are provided for creation of discrete corrosion defects with a wide range of diameter to depth aspect ratios for painted test standards. Also provided are methods for use of those test standards to characterize the corrosion under paint detection threshold, statistical reliability, and accuracy of NDI and/or NDT techniques including but not limited to flash thermography, ultrasonic testing, eddy current testing, microwave testing, shearography, and infrared testing.
摘要:
A computer-implemented building design and modeling system, method, and computer program product are provided. In one example, the computer program product includes computer executable instructions for processing by a computer system. The instructions include instructions for creating instances of parametric objects in a spatial database, where each of the parametric objects represents a construction component of a structure to be modeled and includes a user interface for enabling a user to input design data for the parametric object. The instructions also include instructions for initiating assembly of the parametric objects to create a partial building model. The parametric objects include ordinary elements and massing elements, the massing elements being capable of placing instances of other objects into the spatial database and subsequently passing data to and receiving data from the placed objects.
摘要:
An absorbent article includes a moisture barrier formed of a formable, liquid impermeable material. The moisture barrier defines a basin having a width dimension, a length dimension greater than the width dimension, and a volume. The basin includes a floor having corrugations formed therein parallel to the width dimension. The absorbent article also includes an absorbent assembly disposed within the basin and a liner formed of a liquid permeable material bonded to the moisture barrier and sandwiching the absorbent assembly therebetween. The corrugations permit the absorbent article to bend inwardly, for example to conform to the shape of the wearer, without bunching the moisture barrier along the portions facing the wearer and without substantially stretching or deforming the floor of the moisture barrier.
摘要:
A first steer tube has a first upper side and a first lower side. A second steer tube has a second upper side and a second lower side. A first axle mounting structure is configured to connect the first lower side to a first end of an axle assembly of a wheel. A second axle mounting structure is configured to connect the second lower side to a second end of the axle assembly. A first head tube assembly is disposed to the first lower side. A second head tube assembly is disposed to the second lower side. A support structure includes a first pivot connection and a second pivot connection. A first arm connects the first head tube assembly and the first pivot connection. A second arm connects the second head tube assembly and the second pivot connection.
摘要:
A computer-implemented building design and modeling system and method are provided. In one embodiment, the system comprises a spatial database; means for defining a plurality of parametric objects, each of the parametric objects representing a construction component of at least a portion of a building being modeled and including an interface through which the parametric object communicates information with other ones of the parametric objects; a cost database containing, for each of parametric objects, cost information associated with the parametric object; means for assembling a model of the building utilizing the parametric objects, wherein each of the parametric objects is created in the spatial database; and means for generating in real-time a cost-estimate for the building model based on the cost information associated with the parametric objects as the parametric objects are created in the spatial database.
摘要:
An alarm event generation method and apparatus for signaling an alarm (436, 1400) for a process control system (100). The process control system (100) monitors a production run using a computer system (108). The computer system (108) collects process data corresponding to the production run from operator workstations (104, 106) and stores the process data in a process data database (110). The process data includes a plurality of process parameter counts (430) each corresponding to a process parameter type (428). The process parameter counts (430) are polled from the computer system (108). Each process parameter count (430) has a corresponding manufacturing limit (434) to which it is compared. When a polled process parameter count (430) exceeds its corresponding manufacturing limit (434), an alarm (436, 1400) is signaled. While an alarm (436, 1400) is being signaled, the computer system (108) is prevented from collecting and storing process data.